Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.10
Bid: 2.00
Ask: 2.20
Change: -0.20 (-8.70%)
Spread: 0.20 (10.00%)
Open: 2.30
High: 2.40
Low: 1.70
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Successful step up to Production at West Kytlim

6 Feb 2017 12:17

RNS Number : 1302W
Eurasia Mining PLC
06 February 2017
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company")

Successful step up to Production at West Kytlim during 2016

Eurasia can now report on the final results of the initial mining season at its 75% owned West Kytlim Alluvial Platinum and Gold Mine ("West Kytlim"). Mining at West Kytlim is seasonal with gravel washing possible in a weather window between the months of April and November. The 2016 operation commenced in the later half of this season (See RNS dated 27 July 2016) as mining and other permits became available. Site facilities and infrastructure were put in place ahead of first gravel washing which commenced in the first weeks of September and continued to early November.

A total of 11.3kg raw platinum were produced through the season, with some credits from Palladium (32g), Iridium (350g), Rhodium (49g) and Gold (56g). Two washplants employing different processing schemes were tested on site to further improve knowledge of the washability of the near surface reserves at the Malaya Sosnovka Area. Sluice concentrates from these washplants were upgraded onsite to a raw platinum product which was refined by and sold to a Precious Metals Refinery in Ekaterinburg. The larger of the two washplants had downtime due to minor breakage caused by the passing of heavier gravel and cobbles through the system. Modifications to ensure continuous operation of this washplant have been discussed and will be realized ahead of the 2017 season.

The average mining grade was 449 milligrams per cubic metre. It should be noted that mining grades were notably higher than expected. Average grade of gravels mined was 120% of reserves grade.

A further update on our mining plan for 2017, an outcome of detailed discussions held in Ekaterinburg in the last week of January with our contractors operating the West Kytlim Mine, as well as updates to the agreement with the contractor will follow this announcement directly.

Christian Schaffalitzky, MD at Eurasia commented 'Having met with our contractors this past week in Ekaterinburg we are confident that the 2016 mining season was managed well by both the Eurasia and the contractor's personnel. The season was also successful in terms of becoming familiar with the operating environment, mining machinery and the nature of the ore to be worked, essential elements in an alluvial mining operation. We now look forward to a full mining season in this 2017, preparation for which is already well advanced.'

Enquiries:

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Nick Prowting

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLQLFBDLFFBBQ
Date   Source Headline
7th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
6th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
4th May 20217:00 amRNSForm 8.3 - Eurasia Mining plc
30th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
28th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
28th Apr 20211:13 pmRNSGeneral Meeting Results
28th Apr 202111:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
27th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Apr 20216:15 pmRNSForm 8.3 - Eurasia Mining PLC
26th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Apr 202111:33 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
23rd Apr 20215:04 pmRNSForm 8.3 - Eurasia Mining PLC
23rd Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
22nd Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
20th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
19th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Apr 202111:59 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Apr 202111:29 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
14th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
14th Apr 202111:51 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
13th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
13th Apr 202111:14 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
12th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Apr 20216:29 pmRNSNotice of EGM
9th Apr 20216:29 pmRNSDirector Appointment
9th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Apr 202111:43 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
8th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
7th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
6th Apr 202111:20 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
1st Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
31st Mar 20217:30 amRNSForm 8.3 - Eurasia Mining
30th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
30th Mar 202111:21 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
29th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Mar 202110:27 amRNSForm 8.5 (EPT/RI)
26th Mar 20215:00 pmRNSBinding Agreement Signed with Rosgeo
26th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Mar 202111:45 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
25th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
24th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
24th Mar 202111:25 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
23rd Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
23rd Mar 202111:30 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
22nd Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
22nd Mar 202111:29 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
19th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
19th Mar 202111:46 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.