GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.95
Bid: 1.90
Ask: 2.00
Change: -0.35 (-15.22%)
Spread: 0.10 (5.263%)
Open: 2.30
High: 2.40
Low: 1.70
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Successful step up to Production at West Kytlim

6 Feb 2017 12:17

RNS Number : 1302W
Eurasia Mining PLC
06 February 2017
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company")

Successful step up to Production at West Kytlim during 2016

Eurasia can now report on the final results of the initial mining season at its 75% owned West Kytlim Alluvial Platinum and Gold Mine ("West Kytlim"). Mining at West Kytlim is seasonal with gravel washing possible in a weather window between the months of April and November. The 2016 operation commenced in the later half of this season (See RNS dated 27 July 2016) as mining and other permits became available. Site facilities and infrastructure were put in place ahead of first gravel washing which commenced in the first weeks of September and continued to early November.

A total of 11.3kg raw platinum were produced through the season, with some credits from Palladium (32g), Iridium (350g), Rhodium (49g) and Gold (56g). Two washplants employing different processing schemes were tested on site to further improve knowledge of the washability of the near surface reserves at the Malaya Sosnovka Area. Sluice concentrates from these washplants were upgraded onsite to a raw platinum product which was refined by and sold to a Precious Metals Refinery in Ekaterinburg. The larger of the two washplants had downtime due to minor breakage caused by the passing of heavier gravel and cobbles through the system. Modifications to ensure continuous operation of this washplant have been discussed and will be realized ahead of the 2017 season.

The average mining grade was 449 milligrams per cubic metre. It should be noted that mining grades were notably higher than expected. Average grade of gravels mined was 120% of reserves grade.

A further update on our mining plan for 2017, an outcome of detailed discussions held in Ekaterinburg in the last week of January with our contractors operating the West Kytlim Mine, as well as updates to the agreement with the contractor will follow this announcement directly.

Christian Schaffalitzky, MD at Eurasia commented 'Having met with our contractors this past week in Ekaterinburg we are confident that the 2016 mining season was managed well by both the Eurasia and the contractor's personnel. The season was also successful in terms of becoming familiar with the operating environment, mining machinery and the nature of the ore to be worked, essential elements in an alluvial mining operation. We now look forward to a full mining season in this 2017, preparation for which is already well advanced.'

Enquiries:

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Nick Prowting

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLQLFBDLFFBBQ
Date   Source Headline
6th Jan 20227:00 amRNSDividend Policy Adopted by the Board
30th Dec 20217:00 amRNSHydrogen and Ammonia Strategy
21st Dec 20217:00 amRNSChairman of Japanese Kono appointed as Director
17th Dec 20214:41 pmRNSSecond Price Monitoring Extn
17th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20219:06 amRNSSecond Price Monitoring Extn
16th Dec 20219:00 amRNSPrice Monitoring Extension
16th Dec 20217:00 amRNSTier-1 scale JORC MRE at NKT ex-operating Ni mine
6th Dec 20216:03 pmRNSBinding Agreement Signed with ERDC
23rd Nov 20217:00 amRNSMoscow Exchange Dual Listing Plans
16th Nov 20217:00 amRNSWest Kytlim Flanks License Received
28th Oct 20217:00 amRNSPotential Sale Update
30th Sep 20215:22 pmRNSInterim Report
27th Sep 20219:05 amRNSSecond Price Monitoring Extn
27th Sep 20219:00 amRNSPrice Monitoring Extension
24th Sep 20216:16 pmRNSCompletion of US$15m financing for Rosgeo JV
22nd Sep 20212:06 pmRNSSecond Price Monitoring Extn
22nd Sep 20212:01 pmRNSPrice Monitoring Extension
22nd Sep 202111:06 amRNSSecond Price Monitoring Extn
22nd Sep 202111:01 amRNSPrice Monitoring Extension
20th Sep 20217:33 amRNSPlacement of US$15m at 26p for Rosgeo JV
15th Sep 20217:00 amRNSMonchetundra Detailed Mining Plan
7th Sep 20219:05 amRNSSecond Price Monitoring Extn
7th Sep 20219:00 amRNSPrice Monitoring Extension
3rd Sep 202111:05 amRNSSecond Price Monitoring Extn
3rd Sep 202111:00 amRNSPrice Monitoring Extension
1st Sep 20219:05 amRNSSecond Price Monitoring Extn
1st Sep 20219:00 amRNSPrice Monitoring Extension
1st Sep 20217:00 amRNSShare Price Movement and Progress Update
31st Aug 20214:35 pmRNSPrice Monitoring Extension
31st Aug 20212:05 pmRNSSecond Price Monitoring Extn
31st Aug 20212:00 pmRNSPrice Monitoring Extension
26th Aug 20217:00 amRNSNyud Progress Update
11th Aug 202112:17 pmRNSThree plants launched at West Kytlim
26th Jul 20215:37 pmRNSKola Subsidiaries’ New CEO Appointment
28th Jun 20215:57 pmRNS2021 Annual General Meeting Results
22nd Jun 20211:55 pmRNSAGM Update and Shareholder Questions
15th Jun 20217:00 amRNSRosgeo JV Update
4th Jun 20214:43 pmRNSNotification of AGM & publication of Annual Report
26th May 20217:00 amRNSCompletion of US$20m financing for Rosgeo JV
20th May 20217:00 amRNSPrivate Placement of US$20m for Rosgeo JV
13th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
13th May 20219:05 amRNSSecond Price Monitoring Extn
13th May 20219:00 amRNSPrice Monitoring Extension
12th May 20216:08 pmRNSPotential asset sale, FSP & other updates
12th May 20213:20 pmRNSForm 8.3 -Eurasia Mining plc
12th May 202112:48 pmRNSForm 8.5 (EPT/NON-RI) - Eurasia Mining Plc
12th May 202111:19 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
11th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
10th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.