Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Riverbend Project Update

13 Sep 2010 07:29

RNS Number : 5506S
Empyrean Energy PLC
13 September 2010
 



13th September 2010

 

 

Empyrean Energy PLC

('Empyrean' or the 'Company', (EME))

 

Riverbend Project, onshore Texas, USA

 

 

Empyrean Energy Plc provides the following update on operations at the Riverbend Project in Texas:

 

Quinn-3H well

 

Empyrean has been advised by the operator that the well was stimulated with 51,900 pounds of sand and subsequently a coiled tubing unit was used to inject nitrogen to 10,000' in a jetting operation to help unload drilling and fracc fluids from the wellbore. These operations were carried out on sections of the well to test the Saratoga Formation - which was a secondary objective to the primary Austin Chalk target. Despite the very encouraging shows while drilling, the eventual gas flow rates measured during the final testing were deemed to be sub-economic. The operator has recommended that the well be temporarily shut in and abandoned for possible future use as a water disposal well.

 

In regards to the potential of the Saratoga Formation across the Riverbend Project acreage the operator advises that, although this initial attempt at a production test was unsuccessful in the Quinn-3H well, the Saratoga Formation still remains a secondary objective at this stage for future wells on the project acreage and information will be gathered as future wells are drilled in the hope of better understanding the production capability for this zone.

 

Cartwright-1H well

 

Empyrean has been advised by the operator that drilling at the Cartwright-1H well has reached a measured depth of 14,844 feet.

 

During the last week, a number of large gas bearing fractures have been encountered whilst drilling. These zones have had high pressure and temperature and the operator is proceeding with caution.

 

No conclusions specific to the potential economics of the Cartwright-1H well can be drawn from the drilling activities to date - however it is encouraging to see the fracturing and gas bearing zones where the operator expected them.

 

 

A further update will be provided as significant information comes to hand.

 

 

The information contained in this announcement was reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

Contact:

 

Tom Kelly Empyrean Energy Plc Tel: +618 93216988

 

Nominated Adviser and Broker:

 

Shane Gallwey Astaire Securities Plc Tel: +44 (0) 20 7448 4400

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFASMDFSSEEU
Date   Source Headline
23rd Sep 20219:50 amRNSAGM Company Presentation
2nd Sep 20217:00 amRNSAward of Drilling Contract for Jade Prospect
27th Aug 20219:00 amRNSPosting of Annual Report and Notice of AGM
26th Aug 20213:12 pmRNSFinal Results
26th Jul 20211:41 pmRNSHolding(s) in Company
9th Jul 20219:05 amRNSSecond Price Monitoring Extn
9th Jul 20219:00 amRNSPrice Monitoring Extension
9th Jul 20218:05 amRNS£5.02 million Placement
12th May 20214:40 pmRNSSecond Price Monitoring Extn
12th May 20214:36 pmRNSPrice Monitoring Extension
12th May 20212:06 pmRNSSecond Price Monitoring Extn
12th May 20212:00 pmRNSPrice Monitoring Extension
5th May 20217:00 amRNSJade prospect well design and engineering project
29th Apr 20214:41 pmRNSSecond Price Monitoring Extn
29th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 20217:00 amRNSJade Drilling - Well design & engineering Project
22nd Apr 20214:35 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSUS Tax Refund Received
12th Apr 20217:00 amRNSUpgraded Internal Geological Chance of Success
25th Mar 20217:00 amRNSSacramento Basin Assets
17th Mar 20214:40 pmRNSSecond Price Monitoring Extn
17th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20217:04 amRNSUS Tax Refund
6th Jan 20212:05 pmRNSSecond Price Monitoring Extn
6th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSInterim Results
21st Dec 20207:00 amRNSMako Gas Project - Updated Plan of Development
16th Dec 20204:41 pmRNSSecond Price Monitoring Extn
16th Dec 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20207:14 amRNSBorba Drilling Program
2nd Oct 20207:59 amRNSAppointment of Joint Broker
22nd Sep 202011:06 amRNSResults of Annual General Meeting
22nd Sep 20209:45 amRNSAGM Company Presentation and Question & Answers
21st Sep 20207:00 amRNSDirector/PDMR Shareholding
15th Sep 20208:34 amRNSAward of Options
15th Sep 20208:32 amRNSUpdate re: Annual General Meeting
11th Sep 20207:15 amRNSEmpyrean completes £640,500 Placement
11th Sep 20207:00 amRNSEmpyrean completes £200,000 Placement
21st Aug 202010:11 amRNSFinal Results
3rd Jun 20207:00 amRNSExtension agreed for first phase at Block 29/11
26th May 20207:00 amRNSMako Resource Audit Confirms Significant Upgrade
22nd May 20207:00 amRNSDuyung PSC Update, Indonesia
21st May 20207:00 amRNSBlock 29/11, China - Seismic Inversion Project
12th May 20207:40 amRNSResult of Open Offer
29th Apr 20207:00 amRNSCompany Update
22nd Apr 20207:26 amRNSLaunch of Open Offer
17th Apr 202010:57 amRNSUpdate on Fundraising
14th Apr 20207:30 amRNSSubscription and Proposed Placing
14th Apr 20207:00 amRNSResource Upgrade of Mako Gas Field
25th Mar 20202:11 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.