Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Riverbend Project update

17 Aug 2009 08:14

RNS Number : 5245X
Empyrean Energy PLC
17 August 2009
 

17th August 2009

Empyrean Energy PLC('Empyrean' or the 'Company', (EME))

Riverbend Project, onshore Texas, USA.

Drilling contract secured for re-entry at Quinn 3H well. Rig has commenced mobilising to the drill location over the past weekend. Drilling to commence shortly after rig up is complete.

Empyrean Energy Plc is pleased to announce that it has been advised by Krescent Energy Company LLC ("Krescent"), the operator of the Riverbend Project in Texas, that a drilling contract is now in place for the re-entry and drilling of the Quinn 3H well.

Krescent also advises that over the past weekend they have commenced mobilising the rig to the drill site. It is anticipated that drilling will commence shortly after the rigging up operations are complete.

The Quinn 3H well is initially targeting the Austin Chalk "B" zone where Krescent has already encountered high pressure gas and significant gas influx during the first drilling attempt.

The newly contracted rig has higher pump capacity and pressure rating that is designed to drill in the high gas pressure environment and allow the partners to complete a lateral of desired length within the target zone prior to moving forward with completion operations.

A further announcement will be made when drilling commences.

Commenting today, Executive Director Tom Kelly said: "Empyrean is excited to be part of the Riverbend Project with Krescent and looks forward to the drilling operations commencing shortly."

Contact:

Tom Kelly Empyrean Energy Plc Tel: +618 93216988

Nominated Adviser and Broker: Jerry Keen / Shane Gallwey Astaire Securities Plc Tel: +44 (020 7448 4400 

Further information on the Riverbend Project

The project area comprises a total of approximately 40,000 acres under lease or option and an area of mutual interest totaling 50,000 acres targeting the Austin Chalk and shallower Saratoga Chalk plays.

A first well has been drilled on the project - the Quinn 3H well which encountered multiple gas flares and shows in the primary target zone before hitting a very high pressure gas zone that ultimately resulted in a blowout. Krescent took remedial action and was able to plug the vertical section of the well but lost the final 1000 feet of horizontal. The plan moving forward is to re-enter this well with a rig with greater pump capacity, specifically designed to handle the higher gas pressures similar to those encountered during the first attempt, mill a new window, and drill up to an estimated 5000 foot horizontal lateral to complete the well in the Austin Chalk B zone. The well has a sales pipeline already connected and upon successful completion of the horizontal the well will be flow tested direct to sales.

The project comes with access to Krescent's 60 square miles of proprietary 3-D seismic coverage.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
CNTSFFSWWSUSEFA
Date   Source Headline
2nd Sep 20217:00 amRNSAward of Drilling Contract for Jade Prospect
27th Aug 20219:00 amRNSPosting of Annual Report and Notice of AGM
26th Aug 20213:12 pmRNSFinal Results
26th Jul 20211:41 pmRNSHolding(s) in Company
9th Jul 20219:05 amRNSSecond Price Monitoring Extn
9th Jul 20219:00 amRNSPrice Monitoring Extension
9th Jul 20218:05 amRNS£5.02 million Placement
12th May 20214:40 pmRNSSecond Price Monitoring Extn
12th May 20214:36 pmRNSPrice Monitoring Extension
12th May 20212:06 pmRNSSecond Price Monitoring Extn
12th May 20212:00 pmRNSPrice Monitoring Extension
5th May 20217:00 amRNSJade prospect well design and engineering project
29th Apr 20214:41 pmRNSSecond Price Monitoring Extn
29th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 20217:00 amRNSJade Drilling - Well design & engineering Project
22nd Apr 20214:35 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSUS Tax Refund Received
12th Apr 20217:00 amRNSUpgraded Internal Geological Chance of Success
25th Mar 20217:00 amRNSSacramento Basin Assets
17th Mar 20214:40 pmRNSSecond Price Monitoring Extn
17th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20217:04 amRNSUS Tax Refund
6th Jan 20212:05 pmRNSSecond Price Monitoring Extn
6th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSInterim Results
21st Dec 20207:00 amRNSMako Gas Project - Updated Plan of Development
16th Dec 20204:41 pmRNSSecond Price Monitoring Extn
16th Dec 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20207:14 amRNSBorba Drilling Program
2nd Oct 20207:59 amRNSAppointment of Joint Broker
22nd Sep 202011:06 amRNSResults of Annual General Meeting
22nd Sep 20209:45 amRNSAGM Company Presentation and Question & Answers
21st Sep 20207:00 amRNSDirector/PDMR Shareholding
15th Sep 20208:34 amRNSAward of Options
15th Sep 20208:32 amRNSUpdate re: Annual General Meeting
11th Sep 20207:15 amRNSEmpyrean completes £640,500 Placement
11th Sep 20207:00 amRNSEmpyrean completes £200,000 Placement
21st Aug 202010:11 amRNSFinal Results
3rd Jun 20207:00 amRNSExtension agreed for first phase at Block 29/11
26th May 20207:00 amRNSMako Resource Audit Confirms Significant Upgrade
22nd May 20207:00 amRNSDuyung PSC Update, Indonesia
21st May 20207:00 amRNSBlock 29/11, China - Seismic Inversion Project
12th May 20207:40 amRNSResult of Open Offer
29th Apr 20207:00 amRNSCompany Update
22nd Apr 20207:26 amRNSLaunch of Open Offer
17th Apr 202010:57 amRNSUpdate on Fundraising
14th Apr 20207:30 amRNSSubscription and Proposed Placing
14th Apr 20207:00 amRNSResource Upgrade of Mako Gas Field
25th Mar 20202:11 pmRNSHolding(s) in Company
10th Feb 20207:44 amRNSDuyung PSC Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.