If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.215    -0.005 (-2.27%)
Bid:
0.21
Ask:
0.22
Spread: 0.01 (4.762%)
Market Cap: £7.62m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

UPDATE ON EXPLORATION

17 Apr 2015 10:37

ECR MINERALS plc

(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECR

US OTC: MTGDY

UPDATE ON EXPLORATION

LONDON: 17 APRIL 2015 - ECR Minerals plc is pleased to provide the following update on activities at the Itogon gold project in the Philippines and the SLM gold project in Argentina.

ITOGON GOLD PROJECT, PHILIPPINES

Further to the Company’s news release dated 12 March 2015, the final hole in the current diamond drilling programme at Itogon, designated EDD006, is underway and is expected to be completed during the next week. The results of the drilling will be announced when assay results for all six holes have been received and processed. This is expected to be during May 2015.

EDD006 has been collared NE of ERC005 and is intended to follow up intercepts in ERC005 including 10m at 2.15g/t gold from surface and 7m at 5.33 g/t gold from 138m. EDD006 has a target depth of 80m.

The preceding hole in the current programme, designated EDD005, was collared NE of ERC002 and was intended to follow up intercepts in ERC002 including 15m at 3.29g/t gold from 82m and 17m at 1.57g/t gold from 101m. EDD005 was drilled to 100m.

Attempts to extend ERC002 as part of the current drilling programme were not successful due to deterioration downhole which has occurred since the hole was originally drilled. In view of this, no attempt was made to re-enter ERC001. ERC001, ERC002 and ERC005 are reverse circulation (RC) holes drilled in April 2014 as part of ECR’s first drilling programme at Itogon. Drilling results for RC holes contained in this announcement are extracted from the Company’s announcement dated 29 May 2014 and should be read in conjunction therewith. All widths given in this announcement are apparent width.

SLM GOLD PROJECT, ARGENTINA

Further to the Company’s announcement dated 27 February 2015, bulk sampling was completed at the Maestro Agüero prospect during March 2015. A total of 595kg of material was collected. Sub-samples will be submitted for cyanide bottle roll tests at an independent laboratory. The grade of gold that does not present to cyanide but remains in the pulp residue will be determined by fire assay. This process is intended to allow cyanide soluble grade, residual grade and head grade to be determined, and represents a basic form of metallurgical testwork. The results of this analysis are expected to be available during May 2015 and will be announced.

This announcement has been reviewed by Richard Watts B.Eng. Mining, Fellow of the South African Institute of Mining & Metallurgy, a director of the Company with more than 40 years of experience in the mining industry.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the SLM gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR continues to review potential new investments on a highly selective basis, with a concentration on precious, base and strategic metals projects in Asia and South America.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
Paul Johnson, Non-Executive Chairman
Stephen Clayson, Director & CEO
Richard (Dick) Watts, Technical Director

Email: info@ecrminerals.com

Website: www.ecrminerals.com

Cairn Financial Advisers LLP Tel: +44 (0)207 148 7900
Nominated Adviser
Emma Earl/Jo Turner
Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550
Broker
Martin Lampshire

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

Copyright Business Wire 2015

Date   Source Headline
13th Feb 20197:00 amBUSDrilling Update – Black Cat Gold Prospect, Australia
12th Feb 20197:00 amBUSResearch Report for ECR Minerals
8th Feb 201912:00 pmBUSDrilling Update - Creswick Gold Project Australia
4th Feb 20197:00 amBUSAdditional Drilling Programme - Black Cat Gold Prospect in Victoria, Australia
29th Jan 20199:30 amBUSGold Focused Drill Programme to Commence - Victoria Region Australia
17th Jan 20197:00 amBUSWindidda Gold Project Presentation – Yilgarn, Western Australia
3rd Jan 201910:23 amBUSStrategic Gold Licence Applications – Yilgarn Region Australia - Replacement
2nd Jan 20197:00 amBUSStrategic Gold Licence Applications – Yilgarn Region Australia
20th Dec 20184:09 pmBUSDirector Participation – Strategic Financing
17th Dec 20187:00 amBUSStrategic Financing and Business Update
4th Dec 20187:00 amBUSNew Licence Applications – Australian Gold Portfolio
13th Nov 20187:34 amBUSNew ECR Corporate & SLM Presentations
6th Nov 20182:00 pmBUSStrategic Business Update
11th Oct 20187:00 amBUSBailieston Gold Project Australia - Additional Sampling Results
5th Oct 201810:12 amBUSIssue of Shares for Communications Services and Advisor Change
2nd Oct 201810:08 amBUSIceberg Gold Project Due Diligence Update
28th Sep 201811:25 amBUSSampling Programme Results Bailieston Gold Project Australia
25th Sep 20189:00 amBUSExploration Mapping Reveals Large Gold System – Creswick Australia
14th Sep 20182:03 pmBUSSampling Programme Bailieston Gold Project Australia
19th Jul 20187:00 amBUSStrategic & Operational Update
11th Jul 20189:30 amBUSStrategic Financing, Business Update & New Joint Broker
6th Jul 201810:20 amBUSGold System Identified at Blue Moon Australia
5th Jul 20185:50 pmBUSDirectorate Change
29th Jun 20187:00 amBUSUnaudited Half-Yearly Results for the Six Months Ended 31 March 2018
5th Jun 201810:38 amBUSDrilling Results
22nd May 20187:00 amBUSMonte Christo Drilling Successfully Completed and Drilling Commenced at Blue Moon Gold-Antimony Target
3rd May 20187:00 amBUSBung Bong Gold Prospect - Drilling Successfully Completed, Structural Architecture Indicates Bulk Tonnage Potential
24th Apr 20183:12 pmBUSResults of AGM
20th Apr 20187:30 amBUSECR at UK Investor Show in London
20th Apr 20187:00 amBUSAcquisition of Creswick Gold Project in Victoria, Australia
13th Apr 20187:00 amBUSBung Bong Geochemical Results and Start of Drilling
29th Mar 20187:00 amBUSFinal Results and Notice of Annual General Meeting
23rd Feb 20187:00 amBUSRenewal of Exploration Licence
20th Feb 20187:00 amBUSUpdate on Gold Exploration in Victoria, Australia
21st Dec 201712:13 pmBUSHolding(s) in Company
20th Dec 201711:05 amRNSSecond Price Monitoring Extn
20th Dec 201711:00 amRNSPrice Monitoring Extension
20th Dec 20179:15 amBUSHolding(s) in Company
11th Dec 20177:00 amBUSFifteen High Priority Targets Identified Within ECR’s Victorian Gold Projects
27th Nov 201710:29 amBUSDirectorate change
20th Sep 20177:34 amBUSPlanned Gold Exploration in Victoria, Australia - Replacement
20th Sep 20177:00 amBUSPlanned Gold Ecploration in Victoria, Australia
4th Aug 20177:00 amBUSDirectorate change
4th Aug 20177:00 amBUSChange of Adviser
24th Jul 20177:00 amBUSDrill Results - Bailieston Gold Project, Australia
18th Jul 20178:10 amBUSNew Australian Gold Exploration Licence Issued
30th Jun 20177:00 amBUSUnaudited Half-Yearly Results for the Six Months Ended 31 March 2017
15th Jun 20177:00 amBUSCommencement of Australian Exploration Programme
13th Jun 20174:23 pmBUSHolding(s) in Company
6th Jun 20177:00 amBUSCompletion of Subscription

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.