New Mexico Copper Project

17 Aug 2009 07:00

MERCATOR GOLD plc("Mercator Gold", "Mercator" or "the Company")

Mercator Acquires Exclusive Optionover New Mexico Copper Project

Mercator Gold plc is pleased to announce that further to its release of 27 July 2009 the Company has acquired an exclusive option over the Copper Flat porphyry copper-molybdenum-gold-silver project in the Las Animas mining district in south central New Mexico, United States, by making a payment of US$150,000 as consideration for the grant of the option.

Mercator continues to carry out due diligence on the Copper Flat project, which is a former producing mine. Key areas of focus for the development plans will include the evaluation of the economics of a return of the project to production; assessment of the potential for expansion of existing reserves and resources; and an assessment of the likely time required to secure all necessary permits for the recommencement of production.

About the Copper Flat Project

The Copper Flat deposit has historical reserves of 45.5 million metric tons grading 0.45% Cu, 0.015% Mo, 0.15g/t Au and 2.25g/t Ag (cut-off grade 0.23% Cu), equivalent to 50.2 million short tons @ 0.45% Cu, 0.015% Mo, 0.14g/t Au and 2.04g/t Ag (cut-off grade 0.23% Cu). An open pit mining operation treating up to 6 million short tons per annum to produce up to 20,000 metric tons (30-45 million lb) of copper per annum at Copper Flat will be the basis for planning. Extensive feasibility studies on the restart of production at the project were carried out during the 1980s by highly reputable technical consultants. The most recent Pincock, Allen & Holt plan for a resumption of production at Copper Flat envisaged the mining of 5.8 million short tons of ore and 4 million short tons of waste annually for 11.6 years. In order to restart production, a suitable processing plant, either new or second hand, would need to be procured and commissioned. Important infrastructure from previous mining operations remains in place at Copper Flat. A full pre-strip of the ore body has been completed, which along with the infrastructure in place represents a substantial proportion of the capital investment that would be required if the project were to be brought into production from scratch. Much of the groundwork necessary to obtain the permits required for a return of the project to production has been completed, and Mercator has access to highly qualified project-level management. Detailed metallurgical test work has been carried out, with flotation tests performed on drill core and a 6,000 short ton underground bulk sample. These consistently showed a recovery of 92% copper and the production of highly marketable concentrates with an average copper grade of 28%. The test work results were confirmed during the actual mine production that took place in 1982. The Copper Flat deposit appears to have excellent continuity and consistency of grade. It also has a low estimated stripping ratio of approximately 0.9:1, based on previous mining plans. Some 181 reverse circulation and core drill holes have previously been completed (equating to approximately 39,000m) along with approximately 300m of underground drifting.

Exercise of the Option

In order to exercise its option over the Copper Flat project, Mercator would make payments to the vendors as follows: US$1m by 14 February 2010; US$1.85m by 14 August 2010; and US$7m by 14 February 2011. All the payments are discretionary, and Mercator can elect not to proceed with the exercise of the option at any stage. The final payment may be deferred until 16 May 2011 for an additional payment of US$150,000. The vendors would retain a net smelter return (NSR) of 3.25%.

For further information please contact

Mercator Gold plc

Michael Silver, Chairman Tel: +44 (0) 20 7929 1010
Patrick Harford, Managing Director

Email: info@mercatorgold.com

Website: www.mercatorgold.com

Bankside Consultants Ltd

Tel: +44 (0) 20 7367 8888
Simon Rothschild
Oliver Winters

Cenkos Securities plc

Adrian Hargrave Tel: +44 (0) 20 7397 8900
Beth McKiernan

Old Park Lane Capital PLC

Forbes Cutler, Director of Corporate Broking Tel: +44 (0) 20 7518 2603

AIM: MCR

Copyright Business Wire 2009

Date   Source Headline
29th May 20265:00 pmRNSTotal Voting Rights
18th May 20267:00 amRNSCompletion of Acquisition of Paleogold Limited
6th May 20267:00 amRNSIssue of Equity, Option Grant and TVR
27th Apr 20267:00 amRNSOperations Update
20th Apr 20267:00 amRNSProposed acquisition of Paleogold Limited
27th Mar 202612:46 pmRNSResult of Annual General Meeting
16th Mar 20267:00 amRNSUpdate on Royalty of up to A$2 Million
16th Mar 20267:00 amRNSUpdate on Royalty of up to A$2 Million
5th Mar 20267:00 amRNSFinancial Results for Year Ended 30 September 2025
2nd Mar 20267:00 amRNSAward of Tambo South tenement
10th Feb 20267:15 amRNSRaglan initial mining plan
3rd Feb 20267:00 amRNSRaglan offtake partner identified
30th Jan 20265:00 pmRNSTotal Voting Rights
26th Jan 20267:00 amRNSRaglan Production Plan Underway
15th Jan 20264:55 pmRNSHolding in Company
8th Jan 20267:00 amRNS£1.5 million placing & appointment of Joint Broker
7th Jan 20267:00 amRNSECR's Raglan Project to enter production phase
2nd Jan 20267:00 amRNSIssue of Equity and Total Voting Rights
2nd Jan 20267:00 amRNSIssue of Equity and Total Voting Rights
30th Dec 20259:00 amRNSCompletion of acquisition of Raglan Project
30th Dec 20259:00 amRNSCompletion of acquisition of Raglan Project
23rd Dec 202511:30 amRNS2025 Operational Highlights
23rd Dec 202511:30 amRNS2025 Operational Highlights
23rd Dec 20257:00 amRNSUpdated website and change of registered office
23rd Dec 20257:00 amRNSUpdated website and change of registered office
18th Dec 20257:00 amRNSSale and Purchase agreement for Raglan Project
12th Dec 20257:00 amRNSBlue Mountain drilling results & operations update
1st Dec 20257:00 amRNSStrong Maiden Drill Results & Operations Update
27th Nov 20257:00 amRNSDirectorate Change
25th Nov 20257:00 amRNS-RInitiation of research by Allenby Capital
11th Nov 20257:00 amRNSOperations update
31st Oct 20255:00 pmRNSTotal Voting Rights
17th Oct 20259:00 amRNSIssue of Equity and Total Voting Rights
17th Oct 20257:00 amRNSCorporate and Operational Update
6th Oct 20257:00 amRNSSignificantly oversubscribed WRAP Retail Offer
3rd Oct 20257:00 amRNSUpdate on Raglan Project site visit
1st Oct 20251:00 pmRNSWRAP Retail Offer for up to £100,000
1st Oct 202511:30 amRNSProposed Acquisition, Subscription & Other Matters
18th Sep 20259:00 amRNSJV heads of terms to advance the Creswick Project
15th Sep 20257:00 amRNSGold mineralisation confirmed at Blue Mountain
8th Sep 20257:00 amRNSAppointment of Chris Gibbs as a Proposed Director
27th Aug 20257:00 amRNSBlue Mountain drilling completed
22nd Aug 202511:00 amRNSAppointment of Bitcoin & Digital Asset Consultant
18th Aug 20257:00 amRNSBlue Mountain Gold Project – Exploration Update
8th Aug 20257:00 amRNSDirectorate Change
7th Aug 20257:00 amRNSBitcoin & Digital Asset Treasury Management Policy
4th Aug 20257:00 amRNSOperations update and TVR
1st Aug 20257:00 amRNSDirectorate change
31st Jul 20255:00 pmRNSTotal Voting Rights
2nd Jul 20257:00 amRNSIssue of Equity and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.