Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.265
Bid: 0.26
Ask: 0.27
Change: 0.00 (0.00%)
Spread: 0.01 (3.846%)
Open: 0.265
High: 0.265
Low: 0.265
Prev. Close: 0.265
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

ECR SIGNS DRILLING CONTRACT FOR ITOGON GOLD-SILVER PROJECT, PHILIPPINES

2 Apr 2014 08:07

ECR MINERALS plc

(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECR

US OTC: MTGDY

ECR SIGNS DRILLING CONTRACT FOR

ITOGON GOLD-SILVER PROJECT, PHILIPPINES

LONDON: 2 APRIL 2014 - ECR Minerals plc is pleased to announce that the Company has entered into an agreement for the provision of services (the “Agreement”) with Quest Exploration Drilling (Philippines), Inc. (“QED”).

The Agreement provides for the completion by QED, for ECR, of up to 24 drill holes comprising 3,850m of diamond and reverse circulation (RC) drilling at the Itogon gold-silver project in the Philippines. The drilling will be completed in three phases: a first phase of 1,050m of RC drilling; a second phase of 1,800m of RC drilling or 1,000m of diamond drilling; and a third phase consisting of RC or diamond drilling not completed in the second phase.

It is anticipated that the first phase of drilling will commence on or around 7 April 2014. Completion of the first phase is expected by the end of April 2014 and assay results from this phase are expected to be available by the end of May 2014.

The Company has the option to terminate the Agreement after the first phase or the second phase and for no further drilling to be completed pursuant thereto. The second and third phases are dependent on satisfactory results from prior phases, but may be completed simultaneously if requested by the Company and if deemed practical by QED.

Summary of drilling programme

As previously announced, an extensive 3,850m diamond and RC drilling programme (the “Drilling Programme”) has been designed for the Itogon project based on available historical information and site inspections. The Drilling Programme is aimed at intersecting all the currently interpreted sub-parallel quartz vein structures across the width of the main prospect area, which is characterised by a prominent ridge trending approximately northwest. The ridge is bound by steeply incised tributaries of the Danglay River.

The multiple sub-parallel veins are hosted in hornblende diorite, strike along the ridge and have been mapped historically over a length of 450m, with vein outcrop mapped a further 150m down the ridge at the Danglay River valley floor. Historical sampling has identified significant gold-silver mineralisation in the veins as well as their alteration haloes, in intervening quartz veinlet stockworks and in the host rock. The exposed veins are steeply dipping and the width of the mineralised zone has been mapped historically at up to 250m.

The Drilling Programme is intended to generate information as to the overall grade of the deposit, as well as to assess its cohesiveness and whether it can be mined in bulk, either by open pit or underground techniques, or as discrete higher grade zones mineable underground. The Drilling Programme is also aimed at establishing an open pit type resource along and below the ridge as well as seeking to identify high grade underground type ore enclosed within the lower grade ore. The situation of the deposit within the ridge is expected to prove favourable for either an open pit or underground mining scenario. Subject to the results of the Drilling Programme, the generation of a resource model using the drilling results will allow engineering studies to be carried out to consider mining options as well as other parameters.

The full Drilling Programme is composed of 24 angled holes up to 200m deep and on seven sections 50 to 80m apart along strike. Most of the planned holes are 150m deep and all are -60 degree inclination.

Stephen Clayson, Chief Executive Officer of ECR, commented:

“The first phase of our 3,850m 2014 drilling programme for the Itogon project is about to commence following an intensive period of preparatory work, which has included negotiations with relevant surface claimants, community relations activities and extensive road and access improvements.

Assay results from this first phase of drilling will be a very important indicator as to the potential of the Itogon project, particularly as all historical drilling is reported to have been completed vertically and therefore does not provide a proper test of the steeply dipping veins identified at Itogon.”

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold-silver project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district on the island of Luzon in the north of the Philippines, and benefits from an extensive historical dataset.

ECR has a 100% interest in the Sierra de las Minas gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR holds a substantial minority stake in THEMAC Resources Group Ltd (TSX-V: MAC), which is focused on the development of the Copper Flat copper-molybdenum-gold-silver porphyry project in New Mexico, USA.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010

Paul Johnson, Non-Executive Chairman

Stephen Clayson, Director & Chief Executive Officer

Email: info@ecrminerals.com

Website: www.ecrminerals.com

Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550

David Hart/James Thomas (Nominated Adviser)

Colin Rowbury (Broker)

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

Copyright Business Wire 2014

Date   Source Headline
23rd Apr 202411:48 amRNSResult of AGM
23rd Apr 20247:02 amRNSAGM Statement
18th Apr 20247:05 amRNSSalary Sacrifice, Admission of Shares and TVR
8th Apr 20247:06 amRNSCreswick drill results indicate larger ore bodies
2nd Apr 20247:00 amRNSAnnual Report & Audited Results YE 30th Sept 2023
14th Mar 20247:04 amRNSPlacing raises £585,000 & Joint Broker Appointed
14th Mar 20247:02 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
15th Feb 20241:36 pmRNSBoard Changes
5th Feb 20249:55 amRNSPreliminary findings from Creswick drilling
23rd Jan 20247:03 amRNSBoard Change
15th Jan 202412:46 pmRNSFurther re the sale of Non-Core Assets
10th Jan 20247:04 amRNSReview of Lolworth Project
18th Dec 20237:05 amRNSSale of Non-Core Assets
14th Dec 20237:01 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
12th Dec 202310:50 amRNSDrilling Underway at the Creswick Project
11th Dec 20237:04 amRNSUpdate on Planned Drilling at Creswick
1st Dec 20237:18 amRNSSalary Sacrifice Share Admission and TVR
24th Nov 20231:18 pmRNSECR Board members attending Mines and Money
20th Nov 20237:04 amRNSLolworth Results Suggest Extended Mineralisation
16th Nov 202310:55 amRNSCorrection - Director Share Agreements
16th Nov 20237:36 amRNSUpdate on Drilling & Director Share Agreements
31st Oct 20237:05 amRNSGold Bearing Quartz Veins Discovered at Lolworth
23rd Oct 20237:04 amRNSEncouraging Gold Results from Lolworth Project
20th Oct 20235:09 pmRNSCancellation of Share Options
20th Oct 20234:56 pmRNSTermination of option to acquire Hurricane Project
6th Oct 20234:08 pmRNSResult of General Meeting & Total Voting Rights
5th Oct 20237:05 amRNSHurricane: Final Rock Chip Results & Prospectivity
2nd Oct 20237:04 amRNSHurricane Option Extension & Rock Chip Results
27th Sep 202311:07 amRNSAdditional License Application at Kondaparinga
25th Sep 20239:18 amBUSExtended Gold Prospectivity and Niobium Bullseye Discovery at the Lolworth Project
21st Sep 202310:34 amBUSAsset Overview and Evaluation
19th Sep 20237:34 amBUSPosting of Circular, Notice of GM, Directors Share Agreements & PDMR Dealing
18th Sep 20237:04 amBUSConditional Fundraise of £580,000 & Proposed General Meeting
15th Sep 20231:12 pmBUSBoard and Management Changes
15th Aug 20233:09 pmBUSGold & Niobium Rock Chip Results from the Lolworth Project
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.