Less Ads, More Data, More Tools Register for FREE

Pin to quick picksDCP.L Regulatory News (DCP)

  • There is currently no data for DCP

Trading Statement

24 Jan 2008 07:01

Diamondcorp Plc24 January 2008 DiamondCorp PLC 24 January 2008 Trading Update for the six months ending 31 December 2007 Highlights • Lace mine diamond recovery plant commissioned. • Snowden Mining Industry Consultants completed a Scoping Study which validated management's proposal for accelerated development of the Lace underground resource. • 25,266 carats of diamonds recovered from 324,045 tonnes of tailings (7.8 carats per hundred tonnes), including a 17.72 carat stone and a 13.81 carat stone. • Approximately one third of tonnage stockpiled for recrush to liberate additional diamonds locked up in +6mm to 28mm kimberlite particles. • 8,574 carats of gem diamonds sold at tender for US$548,291 ($64/carat). • 5,170 carats of industrial grade diamonds sold at tender for US$21,633 ($4 /carat). • Approximately two thirds of all diamonds produced were of gem quality, including a high proportion of clear white stones, a significant proportion of fancy yellow stones, numerous small pink and vivid purple diamonds and one small intense blue diamond. • Production during the latter part of the period was severely hampered by frequent power outages, lightning strikes, unseasonably high rainfall and problems with the plant recrush circuit. • Detailed due diligence was completed on a number of potential acquisitions and joint ventures, but none met with the management's criteria for scalability or profitability. • Management worked with Investec Bank to progress the process of obtaining a listing for DiamondCorp's shares on the JSE Limited. DiamondCorp PLC ("DiamondCorp" or "the Company"), the diamond mining companyfocused on South Africa, is pleased to make the following statement in relationto its operations for the period 1 July 2007 to 31 December 2007. Lace Mine In the last week of September, commissioning of a 1.6 million tonne per annumdense media separation plant was completed at the Company's 74% owned Lacediamond mine near Kroonstad, 200km southwest of Johannesburg. During the period, 320,045 tonnes of tailings were treated for the recovery of25,266 carats of diamonds, representing a recovered grade of 7.8 carats perhundred tonnes (cpht). Approximately one third of this tonnage remainsstockpiled for recrush to liberate additional diamonds (estimated to be up to 3cpht) locked up in +6mm to 28mm kimberlite particles. The plant recovered 25,266 carats of diamonds during the period, including a17.72 carat stone and a 13.81 carat stone. Approximately two thirds of alldiamonds produced were of gem quality, including a high proportion of clearwhite stones, a significant proportion of fancy yellow stones, numerous smallpink and vivid purple diamonds and one small intense blue diamond. During the period, 8,574 carats of gem diamonds were sold at tender for proceedsof US$548,291 ($64/carat). Also, 5,170 carats of industrial grade diamonds weresold at tender for US$21,633 ($4/carat). Of the 13,744 carats sold, 9,290 caratswere diamonds recovered during the commissioning process. The balance of caratsproduced during the period will be sold at future tenders. Commenting on the production, DiamondCorp's Managing Director Paul Loudon said:"The diamonds recovered from the tailings provide us with a window into the mainpipe. The quality of the stones continues to exceed our expectations and thesignificant proportion of fancy coloured stones augurs well for high qualityproduction from underground at Lace." Management has formulated an accelerated development plan which aims tointroduce pipe material into the mine plan by the third quarter of this year.The accelerated plan involves sinking a decline shaft into the unmined portionof the Lace satellite pipe which historically was only mined to a depth of 50m.Bulk testing followed by trial underground mining of the satellite pipekimberlite via the decline shaft will be undertaken simultaneously with therefurbishment of the existing 360m deep, 6m x 2.7m, vertical shaft whichaccesses the main Lace pipe. In December, Snowden Mining Industry Consultants Pty Ltd completed a ScopingStudy on the accelerated development plan which validated management's proposal.Work on the decline is scheduled to commence in the current quarter. In the three months following commissioning, approximately one third ofavailable production time was lost due to Eskom load shedding and power outages,equipment damage resulting from power spikes and lightning strikes, andunseasonably high rainfall. The plant also suffered problems with the recrushcircuit due to extended mechanical down time experienced with the crusher. Agreement has been reached with Eskom to access a new source of power for Lacefrom the dedicated power line supplying the neighbouring De Beers Voorspoedmine. This power source will come on line within the next six months, and willprovide Lace with all the power it requires for the Phase Two undergrounddevelopment. It will also mean that Lace has access to two separate sources ofpower from different parts of the Free State, which may alleviate the number ofpower outages encountered during Eskom load shedding which, by all accounts, islikely to continue in the foreseeable future. Until this supply is connected,the Lace operation may continue to suffer from power outages. Strategic Transactions During the period under review, management completed due diligence on a numberof potential diamond acquisitions and joint ventures. None of the opportunitiesmet with management's requirement for scalability or profitability so no furtheraction will be taken. Management continues to take an active approach toidentifying additional opportunities. Corporate Management worked with Investec Bank during the quarter to progress the processof obtaining a listing for DiamondCorp's shares on the JSE Limited. For further information, please contact: Paul Loudon, Managing Director and CEODiamondcorp plc+44 20 7256 2651 Joe Nally/Ivonne CantuCenkos Securities plc+44 20 7397 8900 Robert Smith/Cindy StoutjesdykInvestec Bank Limited+27 11 286 7662 Jane Stacey/Arabella HobbsConduit PR+44 20 7429 6606/+44 792 292 3306 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Apr 20107:30 amRNSOperational Update
13th Apr 20103:32 pmRNSHolding(s) in Company
8th Apr 20104:06 pmRNSHolding(s) in Company
8th Apr 20102:42 pmRNSHolding(s) in Company
6th Apr 20104:02 pmRNSHolding(s) in Company
1st Apr 20103:45 pmRNSResult of EGM - Replacement
1st Apr 20101:00 pmRNSResult of EGM
15th Mar 20102:56 pmRNSIssue of Equity Replacement
15th Mar 20107:00 amRNSIssue of Equity
12th Feb 201010:30 amRNSAppointment of Joint Broker
10th Feb 20107:00 amRNSMarket Update
21st Jan 201012:45 pmRNSIssue of Equity
16th Dec 20095:00 pmRNSNotice of EGM
24th Nov 20097:30 amRNSDrilling Update
17th Nov 20097:00 amRNSBotswana Drilling Update
16th Nov 20093:30 pmRNSIssue of Equity
3rd Nov 20091:45 pmRNSIssue of Equity
14th Oct 20097:00 amRNSUpdate on Offer Talks and Financial Position
5th Oct 20097:00 amRNSStatement re Possible Offer
30th Sep 200912:30 pmRNSHalf Yearly Report
31st Jul 200911:00 amRNSLace Mine Update
24th Jun 20094:30 pmRNSOperational Update
7th May 20097:30 amRNSAGM Statement
31st Mar 20097:30 amRNSFinal Results
30th Mar 20097:30 amRNSOperational Update - Crushing Circuit
5th Feb 200912:00 pmRNSGrant of mining right
27th Jan 200910:00 amRNSTrading Statement
17th Dec 20089:00 amRNSHolding(s) in Company
14th Nov 20083:49 pmRNSHolding(s) in Company
14th Nov 20088:42 amRNSDirectorate Change
14th Nov 20088:00 amRNSDirector/PDMR Shareholding
13th Nov 20088:00 amRNSHolding(s) in Company
12th Nov 200810:10 amRNSEIIB announces increased private equity investment
7th Nov 200811:26 amRNSIssue of Equity
29th Sep 20088:00 amRNSInterim Results
1st Sep 20084:00 pmRNSResult of EGM
15th Aug 200812:00 pmRNSNotice of GM and posting of c
28th Jul 20089:00 amRNSLoan Facility
4th Jul 20082:00 pmRNSResult of AGM
3rd Jul 20087:30 amRNSMARKET UPDATE - JULY 2008
20th Jun 200811:00 amRNSHolding(s) in Company
30th May 200812:00 pmRNSDirector/PDMR Shareholding
28th May 20084:00 pmRNSAGM statement and Annual Repo
23rd May 20084:00 pmRNSIssue of Equity
30th Apr 20089:00 amRNSExercise of warrants
8th Apr 20087:30 amRNSSenior Management Appointment
31st Mar 20087:02 amRNSNotice of dual listing
20th Mar 200810:00 amRNSNotice of dual listing
4th Mar 20087:00 amRNSFinal Results
15th Feb 20087:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.