If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCeres Power Regulatory News (CWR)

Share Price Information for Ceres Power (CWR)

Share Price is delayed by 15 minutes
Get Live Data
506.00    -6.00 (-1.17%)
Bid:
504.00
Ask:
508.50
Spread: 4.50 (0.893%)
Market Cap: £1.08b
CWR Live PriceLast checked at - London Stock Exchange

Intraday Ceres Power Share Chart

British Gas CHP Update

24 Jun 2008 09:00

RNS Number : 3715X
Ceres Power Holdings plc
24 June 2008
 

British Gas CHP update

Key technical milestone achieved on contract with British Gas and independent confirmation of core CHP technology performance

Ceres Power is today hosting a presentation for analysts updating them on the recent progress on its CHP technology, achievements on the residential CHP contract with British Gas and providing a roadmap of its development programme through to mass market roll-out.

Since the demonstration of the Company's CHP unit in September 2007, the core fuel cell module has achieved its size and weight reduction targets. In addition, we have completed the Alpha design phase of an integrated wall-mountable CHP unit with British GasThis design meets our agreed go-to-market specification and satisfies the requirements for mass market uptake including installation, service and maintenance in a UK home. 

The performance of the core fuel cell technology has been independently confirmed by AEA Energy and Environment (part of AEA Technology plc), which states that: "On the basis of the activities and testing witnessed and the data presentedwe can confirm the following statements:

Ceres Power has developed and demonstrated a fuel processing capability to efficiently steam reform natural gas in its compact fuel processor unit.

Ceres Power has achieved a target heat to power ratio of 1:1 from its stack technology operating on reformed natural gas.

The Ceres Power CHP system Alpha target efficiency can be achieved from its Alpha design"

Ceres Power is confident that it can meet the targets and timescale for mass market roll-out of the CHP product in 2011 using scaleable volume manufacturing processes and volume supply chain partners. The Company expects to have built and tested the Alpha CHP product in Q4 2008 and Q1 2009 respectively, secured a mother plant site in Q4 2008 and signed-off the Alpha deliverables as trigger for payment of £2m from British Gas during Q2 2009.

Peter Bance, Chief Executive Officer of Ceres Power, commented:

"We are delighted to have achieved this important milestone and now have a CHP design which satisfies the requirements for mass market uptake. The performance of the core technology has been independently confirmed by AEA Energy & Environment and we have today laid out a clear roadmap to the commercial launch of our residential CHP product."

Gearoid Lane, Director of British Gas New Energy, commented:

"We are pleased with the recent progress under our new contract with Ceres Power. The programme is on track to deliver as planned and we are pleased to have contributed to the Alpha design that will satisfy mass market requirements."

Further details are contained in the management's presentation that is available on the Company's website: www.cerespower.com

For further information contact: 

 

Peter Bance, Chief Executive Officer, Ceres Power +44 (0) 1293 400404

Ken Cronin, Gavin Anderson +44 (0) 20 7554 1442

About Ceres Power

Ceres is a successful AIM-listed fuel cell business developing a range of global market applications including residential combined heat and power, on-site / back-up generators and auxiliary power units for transport. The technology is based on commercially available materials for low cost manufacture and, unlike many fuel cells, the Ceres cell operates on widely available fuels like natural gas and LPG, as well as on hydrogen.

Ceres has developed a new generation of Solid Oxide Fuel Cell (SOFC) technology which operates in the temperature range of 500-600ºC enabled by the use of CGO (Cerium Gadolinium Oxide) as the electrolyte material. This is substantially lower than the temperatures at which conventional SOFC materials operate, typically 750-1000ºC for YSZ (Yttria Stabilised Zirconia). 

The inherently lower operating temperature of the Ceres CGO-based SOFC technology enables thin ceramic layers to be supported by metal substrates, which, in turn, provides the basis of cell and stack designs manufactured from commercially available grades of stainless steel, providing excellent sealing integrity, mechanical robustness, and thermal shock resistance.

Fuel and air are supplied to a stack of fuel cell layers to produce electricity and heat via a solid state electrochemical process. Unlike combustion in an engine or with a burner, this process is highly efficient, environmentally friendly, and quiet.

The uniqueness of the Ceres metal supported SOFC technology and its operating temperature range provide the basis for a range of attractive commercial applications in terms of: fuel efficiency, with associated economic savings and reduction in carbon emissions; heat-to-power ratio ideally suited for domestic CHP applications and well matched to seasonal variations in electrical and heat demand; the ability to operate on a range of commercially available fuels including natural gas and LPG; low temperature of operation enabling use of commercially available materials resulting in reduced product costs.

In conjunction with the Ceres stack programme, the Company has been developing the non-fuel cell elements within the complete product, known as the balance of plant ('BOP'), as part of its systems integration activities aimed at delivering products for specific customers. Because of the unique attributes of the technology, Ceres has been able to dramatically reduce the time and cost of BOP development and systems integration by utilising mature component supply chains and ordinary, low cost materials. Unlike other fuel cell designs which operate at more extreme temperatures, time-consuming and expensive bespoke solutions for BOP components are not required.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFKQKNOBKKOAB
Date   Source Headline
6th Sep 20101:15 pmRNSHolding(s) in Company
6th Sep 20101:09 pmRNSHolding(s) in Company
27th Jul 201010:55 amRNSBlocklisting Interim Review
26th Jul 20107:00 amRNSDirector/PDMR Shareholding
20th Jul 20104:35 pmRNSPrice Monitoring Extension
7th Jul 20104:35 pmRNSPrice Monitoring Extension
5th Jul 20104:35 pmRNSPrice Monitoring Extension
2nd Jul 20107:00 amRNSCHP programme update
25th Jun 20104:40 pmRNSSecond Price Monitoring Extn
25th Jun 20104:35 pmRNSPrice Monitoring Extension
28th Apr 20104:40 pmRNSSecond Price Monitoring Extn
28th Apr 20104:35 pmRNSPrice Monitoring Extension
19th Apr 20107:00 amRNSDirector/PDMR Shareholding
13th Apr 20107:00 amRNSChange of Registered Office
30th Mar 20104:35 pmRNSPrice Monitoring Extension
25th Mar 20107:00 amRNSInterim Results
16th Mar 201011:00 amRNSNotice of Results
11th Mar 201012:20 pmRNSHolding(s) in Company
18th Feb 20107:00 amRNSAppointment of Joint Broker
2nd Feb 20107:00 amRNSFeed-in Tariff Announced for Residential CHP
21st Jan 20107:00 amRNSDirectorate Change
6th Jan 20102:34 pmRNSHolding(s) in Company
5th Jan 20107:00 amRNSTotal Voting Rights
22nd Dec 200912:39 pmRNSAnnual Report and Accounts
22nd Dec 200912:33 pmRNSHolding(s) in Company
22nd Dec 20097:00 amRNSDirector/PDMR Shareholding
18th Dec 200912:40 pmRNSHolding(s) in Company
17th Dec 20097:00 amRNSInitial manufacturing operations commence
16th Dec 20093:34 pmRNSHolding(s) in Company
14th Dec 200911:51 amRNSResult of EGM
7th Dec 20097:00 amRNSResult of AGM
2nd Dec 20097:00 amRNSTotal Voting Rights
1st Dec 20094:35 pmRNSPrice Monitoring Extension
25th Nov 20097:54 amRNSIssue of Equity
24th Nov 20094:42 pmRNSIssue of Equity
6th Nov 200910:36 amRNSCeres Power begins European market entry for resid
5th Nov 20097:00 amRNSNotice of AGM
2nd Nov 20097:00 amRNSTotal Voting Rights
22nd Oct 20097:00 amRNSHolding(s) in Company
23rd Sep 20097:00 amRNSCeres signs boiler assembly agreement
23rd Sep 20097:00 amRNSFinal Results
15th Sep 200912:00 pmRNSNotice of Preliminary Results
2nd Sep 20097:00 amRNSTotal Voting Rights
4th Aug 20097:00 amRNSTotal Voting Rights
29th Jul 20097:00 amRNSManufacturing Facility Fitted Out
9th Jul 200912:39 pmRNSGrant of Share Options
1st Jul 20097:00 amRNSTotal Voting Rights
30th Jun 20097:00 amRNSAlpha CHP Payment Received
24th Jun 20097:00 amRNSBlocklisting Interim Review
26th May 20097:00 amRNSBritish Gas sign off Alpha milestone payment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.