Adrian Hargrave, CEO of SEEEN, explains how the new funds will accelerate customer growth Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCircle Oil Plc Regulatory News (COP)

  • There is currently no data for COP

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operating Update

20 Mar 2014 07:00

RNS Number : 7422C
Circle Oil PLC
20 March 2014
 



20 March 2014

 

Circle Oil Plc 

("Circle" or the "Company")

 

Operating Update

 

Circle Oil Plc (AIM: COP), the international oil and gas exploration, development and production company, is pleased to announce the following operating update.

 

 

Egypt

 

Al Amir SE Field ("AASE") and the Geyad Field

 

The AASE-19 well has now been hooked up as a Shagar producer and was producing at a rate of 517 bopd gross and 0.397 MMscf/d on 14 March, the first full 24 hours of production. The rig has moved to drill the infill AASE-21 well located about 1,000 metres south-east of the AASE-4 well and 800 metres north-west of the AASE-1X well to appraise both the Shagar and Rahmi sands for production.

 

Current gross daily production from the AASE and the Geyad Field continues at approximately 11,200 bopd and 11 MMscf/d.

 

Following completion of the current AASE-21 well, the rig is planned to move on to drill an infill support injector well in the north central part of the field prior to release on sub contract. In parallel, reservoir engineering studies are being advanced to develop a dynamic reservoir model to assess reservoir behaviour for the future. This will provide the necessary interactive picture for the effective and efficient management of the two producing fields going forward. This period of reservoir management study will also permit the planning of any future infill drilling both for producers and injectors to maximise reserve recovery for the medium and long term.

 

 

Oman

 

Block 49

 

The tender process for the forthcoming Block 49 commitment well is at the evaluation stage. The well provisionally named Shisr-1 is to be drilled on the north-western dip-slope of the Ghudun-Khasfah high, approximately 60 kilometres south-west and updip of the Dauka-1 well.

 

The well is targeting an Intra Haima seismic anomaly with an updip pinchout of the Safiq sands. The well is expected to be drilled to a TD of 2,500 metres with a top target at 2,350 metres with pre-drill P50 STOOIP 56 MMbo, with recoverable prospective resources estimated 14 MMbo.(1) Drilling is planned to commence within H1 2014 and is expected to take up to approximately 45 days without testing. This commitment well is regarded as high risk with a GCOS of 10-12% and completes Circle's commitment on the Block.

 

Block 52

 

The planned inshore 2D seismic survey on Block 52 is due to commence on 21 March with the seismic vessel MV Hindsagar. The programme is, as previously announced, to acquire 850 kilometres of 2D seismic data to map and prioritise the three inshore leads identified through interpretation of existing 2D data.

 

Oman 2013 bid round

 

In Oman, as previously indicated, the Company bid for an onshore Block in the 2013 bid round and continues to progress its bid with the relevant authorities.

 

 

Morocco

 

Sebou and Lalla Mimouna Permits

 

The drilling campaign scheduled to start in mid to end January 2014 has been delayed and all preparations slowed by the continuing seasonal rains in the Rharb. As in previous years significant areas within the concession area are subject to flooding which has been known to continue into late spring. Well proposals are now completed for the first six wells which are located on both permits with the first to be drilled in the Sebou permit. The Company is presently planning to drill 12 wells which includes the KAB-1 re-drill.

 

Current gross daily production from our producing gas wells in the Sebou permit is 7 MMscf/d.

 

 

Tunisia

 

Mahdia Block

 

Plans are well advanced for the drilling of the Mahdia commitment well with long lead items prepared for shipment, main and sub contractor tenders issued with some awarded and others under commercial evaluation or awaiting ETAP approvals. Subject to final negotiation and Tunisian authorities' approvals the drilling unit has been selected. A farm-out exercise is also underway with a number of companies signed-up to attend the data room this month with further promotion underway.

 

The licence is within the vicinity of many producing fields, including the Tazerka, Birsa, Oudna, and Halk El Menzel oil fields, and the Maamoura gas field. The most recent discovery, the Mahdia-2 well, located approximately 20 kilometres west of the Block, tested approximately 2,700 bopd from the Serdj carbonate reservoir. This is one of the several possible reservoir horizons proven by producing plays in the region.

 

The Mahdia exploration well provisionally designated El Medouini-1 is planned to test the stacked play potential of the El Mediouni prospect, including both the primary Birsa Sands target and the secondary fractured carbonates of the Ketatna and Abiod formations as well as the deeper Serdj carbonates. The Birsa Sands alone have an estimated pre-drill P50 case of 185 MMbbls STOOIP.(2) The El Mediouni-1 well will be drilled to a depth of up to 2,300 metres, targeting the stacked primary and secondary reservoir horizons between 1,000 metres and 2,100 metres in subsea depth. The recoverable prospective resources estimate for the El Medouini prospect is 46 MMbbls (2) for the Birsa objective alone, substantially larger than the recoverable commercial threshold for the area which sits at approximately 10 MMbo.

 

 

Annual Results

 

The Company is trading in line with management expectations and expects to issue its Preliminary Results announcement for the year ended 31 December 2013 at the end of May.

 

 

Prof Chris Green, CEO, said

 

"Circle is now entering an exciting and busy operational period in all of its geographies. We were pleased with the results of the sidetrack of the AASE-19 well, which will provide additional oil and gas production from the Al Amir SE field. Drilling operations offshore Tunisia and onshore Oman approach and we await the end of our frustrating delays in Morocco and being able to start our multi-well drilling campaign."

 

Glossary

boepd

barrels of oil equivalent per day

bopd

barrels of oil per day

GCOS

Geological Chance of Success

MD

Measured Depth

MMbo

Million barrels of oil

MMbbls

Million barrels

MMscf/d

Million standard cubic feet of gas per day

P50

50% chance of success

STOOIP

Stock Tank Oil Originally in Place

2D

Two Dimensional

3D

Three Dimensional

(1) Circle internal estimate post 2009 3D seismic interpretation

 

(2) Circle internal estimate post evaluation of 2013 3D seismic survey

 

In accordance with the guidelines of the AIM Market of the London Stock Exchange, Dr Stuart Harker, VP Geology, also with over 30 years experience, is the qualified persons as defined in the London Stock Exchange's Guidance Note for Mining and Oil and Gas companies, who have reviewed and approved the technical information contained in this announcement. Dr Harker has relied on primary information supplied by the operator in carrying out his review.

 

 

For further information contact:

 

Circle Oil Plc (+44 20 7638 9571)

Professor Chris Green, CEO

 

Investec (+44 20 7597 5970)

Chris Sim

George Price

James Rudd

 

Liberum Capital Limited (+44 20 3100 2222)

Simon Atkinson

 

Citigate Dewe Rogerson (+44 20 7638 9571)

Martin Jackson

Shabnam Bashir

 

Murray Consultants (+353 1 498 0320)

Joe Murray

Joe Heron

 

 

Notes to Editors

 

Circle Oil Plc (AIM: COP) is an international oil & gas exploration, development and production Company holding a portfolio of assets in Morocco, Tunisia, Oman, and Egypt with a combination of low-risk, near-term production, and significant upside exploration potential. The Company listed on AIM in October 2004.

 

Internationally, the Company has continued to expand its portfolio over the past years and now has assets in the Rharb Basin, Morocco; the Ras Marmour Permit in southern Tunisia; the Mahdia Permit offshore Tunisia, and the Zeit Bay area of Egypt. Circle also has the largest licensed acreage of any company in Oman. In addition to its prospective Block 52 offshore, Circle has an ongoing exploration programme in Block 49 onshore.

 

Circle's strategy is to locate and secure additional licences in prospective hydrocarbon provinces and, through targeted investment programmes, monetise the value in those assets for the benefit of shareholders. This could be achieved through farm-outs to selected partners who would then invest in and continue the development of the asset into production, or Circle may opt to use its own expertise to appraise reserves and bring assets into production, generating sustained cash flow for further investment.

 

Further information on Circle is available on its website at www.circleoil.net

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLJLMJTMBMBTTI
Date   Source Headline
29th Dec 20167:00 amRNSFinancial Update
16th Nov 20167:00 amRNSFinancial Update
19th Oct 20167:00 amRNSLender Redemption Notice
30th Sep 20166:15 pmRNSCircle Oil PLC: 2016 Interim Results
16th Sep 20167:00 amRNSMorocco Production Update
2nd Sep 20164:25 pmRNSFinancial Update
8th Aug 201610:00 amRNSMorocco Production
5th Aug 20164:56 pmRNSFinancial Update
27th Jul 20161:35 pmRNSResults of AGM & EGM
14th Jul 20167:00 amRNSFinancial Update
29th Jun 20164:10 pmRNSNotice of AGM, EGM and Posting of Annual Report
29th Jun 20167:30 amRNSSuspension - Circle Oil Plc
29th Jun 20167:30 amRNSSuspension of Shares
29th Jun 20167:00 amRNSPreliminary Results Announcement
24th Jun 20167:00 amRNSFinancial Update
23rd Jun 20165:15 pmRNSTR 1 Notification of Major Interest in Shares
23rd Jun 20165:13 pmRNSTR 1 Notification of Major Interest in Shares
27th May 20167:00 amRNSFinancial Update
20th May 20167:00 amRNSStrategic Review Update
17th May 20167:00 amRNSEgypt Operational Update
13th May 20167:00 amRNSFinancial Update
5th May 201610:00 amRNSTR 1 Notification of Major Interest in Shares
29th Apr 20167:00 amRNSReserves and Contingent Resources Update
25th Apr 20165:05 pmRNSTR 1 Holding in Company
15th Apr 20167:00 amRNSRBL Update
15th Mar 20167:00 amRNSOperating and Financial Update
22nd Feb 20167:00 amRNSTR1 - Notification of major interest in shares
8th Feb 20161:00 pmRNSOperational & Financial Update
14th Dec 20157:00 amRNSFinancial and Operational Update
28th Oct 20157:00 amRNSOperating Update Morocco
13th Oct 20157:00 amRNSOperating Update Morocco
8th Oct 20159:00 amRNSDirectorate Change
29th Sep 20157:01 amRNS2015 Interim Results
26th Aug 20157:00 amRNSOperating Update Morocco
19th Aug 20157:00 amRNSExtension of Permit for Mahdia Licence in Tunisia
3rd Aug 20157:00 amRNSOperating Update Morocco
24th Jul 20152:30 pmRNSChange of Registered Office
14th Jul 20157:00 amRNSOperating Update Morocco
3rd Jul 20152:15 pmRNSResult of AGM
29th Jun 20155:13 pmRNSDirector/PDMR Shareholding
26th Jun 20157:00 amRNSOperating Update Morocco
10th Jun 20154:20 pmRNSPosting of Annual Report and AGM Notice
1st Jun 20157:00 amRNSPreliminary Results
29th May 20157:00 amRNSAppointment of new Chief Executive Officer
26th May 20157:01 amRNSNotice of Results
12th May 20153:30 pmRNSLalla Mimouna - Spudding of LAM-1 Well
11th May 20157:00 amRNSOperating Update Morocco
27th Apr 20157:00 amRNSAmendment & Extension of Convertible Loan
31st Mar 201510:00 amRNSAdviser Change
24th Mar 20153:03 pmRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.