Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCondor Gold Regulatory News (CNR)

  • This share is currently suspended. It was suspended at a price of 32.20
  • There is currently no data for CNR

Trading Statement

17 Aug 2006 10:48

Condor Resources PLC17 August 2006 17th August 2006 Condor Resources Plc ("Condor" or "the Company") Assay Results and Trading Update Condor Resources Plc (AIM symbol "CNR") is pleased to announce further assayresults for its El Potosi Project in El Salvador and provide a trading update.Highlights include: • El Potosi Project Further assay results: 5.0 metres @ 9.23 g/t Au including 1m @ 30.93g/t Au, and5.35 metres @ 22.15g/t Au including 0.38m @ 98.6g/t Au and 41.1g/t Ag. Based on these results Condor intends to spend between US$250,000 and US$500,000in the next 12 months and embark on a drill campaign of up to 4,000m of combinedReverse Circulation and Diamond drilling to further prove the project. Initialinterpretation by Condor technical staff is that the El Potosi Project maycontain significant gold resources. • El Pescadito Project Condor has been awarded the 42.5km(2) El Gigante Licence in El Salvador. Thelicence area is contiguous with Condor's existing El Pescadito and CarolinaLicences and enlarges the existing El Pescadito Project area to 133km(2). The ElGigante Licence exhibits a geological setting similar to that of the SanSebastian Gold Mine area to the south east which is recorded as being one of themost prolific gold producers in Central America.. Additionally the licence areahas several historical gold workings that have never been fully explored inmodern times. • Loma del Caballo Prospect Significant results are reported from recent trenching at the Loma del CaballoProspect, in line with those disclosed in the Independent Competent Person'sReport in the Admission Document, and confirming the width and nature ofmineralization in the resource area. These include: LOTR02 8m @ 0.57g/t Au and 46.94g/t AgLOTR03 7m @ 1.88g/t Au and 17.61g/t AgLOTR04 15m @ 3.24g/t Au and 41.96g/t AgIncl. 2m @ 17.53g/t Au and 229.25g/t Ag • Personnel Mr. Steve Friberg has been appointed Exploration Manager for El Salvador and Mr.Mark Aldridge will drive the exploration program in Nicaragua. These 2expatriate geologists have combined experience of over 50 years in goldexploration. • Drilling Rigs The Company has secured the services of 3 drilling rigs and intends to commencedrilling with one drill rig on the Loma del Caballo Prospect in the first weekof September 2006. The Directors expect the second drilling rig to arrivein-country by mid October 2006 and the third by the end of October 2006 or earlyNovember 2006 subject to any further delays beyond the control of Condormanagement. The Company will use these drilling rigs to embark on a drillingprogramme of some 20,000m in the next 12 months and up to 40,000m in the nexttwo years. • Aerial Photography has been completed for all licences in El Salvador which allows regional targeting and topographical control within the project areas. • Negotiations are at an advanced stage to secure two new prospects in Nicaragua. Detailed Update El Potosi Project The further assay results at the El Potosi Project, where Condor is earning a100% interest, confirm the Company's initial interpretations of multiple, narrowhigh grade ore zones. The two main mineralised vein systems, 613 Vein andF-Potosi Vein, are now open down dip and along strike to the south. Highlights of the new assay results include down hole reported widths of: PTRC0017* 5m @ 9.23g/t Au from 57 to 62m, including 1m @ 30.93g/t Au. PTDT0013# 5.35m @ 22.15g/t Au from 106.80 to 112.15m. including 0.38m @98.6g/t Au and 41.1g/t Ag (true width). * PTRC0017 is a drill hole completed utilising Reverse Circulation methodology("R.C."). # PTDT0013 is a drill hole completed utilising HQ diamond core methodology. NB: All intercepts have utilised uncut assay results. Exploration to date has centered on the historical El Potosi Mine, whichoperated from the late 19th Century until the 1950's and is estimated to haveproduced 60,000 ounces of gold with values ranging between 18g/t Au and 30g/tAu. In December 2005, Condor completed a 24 drill hole program, totaling 3,092.6m(and comprising 2,334m of R.C. and 758.6m of HQ diamond drilling), designed totest several sub-parallel structures identified in historical mine plans and aslogical follow-up to initial field work. Initial 4m R.C. composite samples werere-analysed on a 1m basis where gold assays returned greater than 1g/t Au. Numerous narrow quartz-chalcedony veins, with variably developed quartz veinletstockworks evolving to breccia zones, were encountered during this drillingprogram. Significant 4m composite assay results from drill holes, as disclosedin the Independent Competent Person's Report in the Admission Document, aresummarised in Table 1. Table 1. Significant Intercepts - 4m Composite Samples Drill Hole Id From (m) To (m) Interval (m) Au g/t Ag g/t PTRC0002 8.00 20.00 12.00 2.11 1.7PTRC0004 100.00 104.00 4.00 2.78 1.0PTRC0016 0.00 4.00 4.00 2.32 2.1PTRC0017 56.00 72.00 16.00 9.77 11.5Incl. 56.00 60.00 4.00 35.07 11.5Incl. 68.00 72.00 4.00 2.86 4.7PTRC0020 17.00 29.00 12.00 1.33 1.46Incl. 17.00 21.00 4.00 2.47 2.33PTRC0022 37.00 49.00 12.00 1.70 1.3 Individual 1m samples were then collected from anomalous 4m composite samplesand sent to BSI Inspectorate for analytical determinations. These results aresummarised in Table 2. Table 2. Significant Intercepts - 1m Samples Drill Hole Id From (m) To (m) Interval (m) Au g/t Ag g/t PTRC0002 8.00 19.00 11.00 2.05 2.5Incl. 13.00 16.00 3.00 5.52 4.2PTRC0004 28.00 30.00 2.00 1.17 2.65 102.00 104.00 2.00 3.78 1.65PTRC0017 57.00 62.00 5.00 9.23 -Incl. 57.00 59.00 2.00 21.49 7.4 70.00 71.00 1.00 5.34
Date   Source Headline
23rd Sep 200911:18 amRNSHalf Yearly Report
21st Jul 20094:00 pmRNSResult of AGM
13th Jul 200910:54 amRNSHolding(s) in Company
30th Jun 20097:00 amRNSTotal Voting Rights
29th Jun 20091:20 pmRNSAnnual Financial Report
25th Jun 20092:42 pmRNSFinal Results - Replacement
25th Jun 20091:23 pmRNSFinal Results
22nd Jun 20098:19 amRNSIssue of Shares
15th Jun 200912:41 pmRNSWithdrawl of Offer
12th Jun 20094:49 pmPRNWithdrawal of Offer
12th Jun 20094:14 pmRNSResult of General Meeting
9th Jun 20099:26 amRNSFurther re share exchange and rejection of offer
5th Jun 20098:44 amRNSRejection of unsolicited conditional offer
3rd Jun 20094:59 pmPRNOffer by Worldwide Natural Resources Plc
27th May 20091:32 pmRNSProposed share exchange with Grafton Resources
20th May 20092:30 pmBUSRule 8.3 - Condor Resources PLC
14th May 200910:57 amRNSRule 8.3- Condor Resources PLC - Replacement
14th May 20099:56 amRNSRule 8.3- Condor Resources PLC
12th May 20095:18 pmRNSTakeover Panel Ruling on Classdrive plc
12th May 20094:58 pmRNSStatement re Condor Resources Plc
11th May 20092:21 pmRNSHolding(s) in Company
7th May 20094:51 pmRNSRule 8.3- Condor Resources PLC
6th May 20097:00 amRNSGrant of new concession in Nicaragua
27th Apr 20099:00 amRNSResponse to Classdrive Plc announcement
24th Apr 20092:30 pmPRNPossible Offer
19th Feb 200910:01 amRNSUpdate on the San Albino-Murra Option Agreement
30th Dec 200810:53 amRNSGrant of Options
15th Dec 200811:09 amRNSUpdate
27th Nov 20083:44 pmRNSExploration Update for Nicaragua
31st Oct 20087:00 amRNSDirector Declaration
22nd Oct 20089:40 amRNSExtension of El Pescadito Licence
29th Sep 20087:00 amRNSInterim Results
17th Sep 20089:27 amRNSChange of Adviser
3rd Sep 20087:00 amRNSChanges to the Board
5th Aug 20087:00 amRNSDirectorate Change
31st Jul 20087:00 amRNSTotal Voting Rights
11th Jul 200812:23 pmRNSHolding(s) in Company
9th Jul 20089:33 amRNSHolding(s) in Company
4th Jul 20085:35 pmRNSChange of Registered Office
1st Jul 20081:04 pmRNSResult of AGM
27th Jun 200811:05 amRNSPlacing of New Ordinary Share
10th Jun 200811:08 amRNSNotice of AGM
4th Jun 20088:42 amRNSFinal Results
30th May 200812:49 pmRNSResource update for Nicaragua
22nd May 200812:41 pmRNSTrading update
18th Apr 20082:36 pmRNSMaiden Resource at El Cacao
2nd Apr 20088:45 amRNSHolding(s) in Company
19th Mar 20087:00 amRNS2nd Drilling Phase Completed
4th Mar 20089:25 amRNSHigh Grades in Nicaragua
21st Feb 20081:12 pmRNSSignificant Resources Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.