Pin to quick picksCondor Gold Regulatory News (CNR)

Share Price Information for Condor Gold (CNR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 31.50
Bid: 31.00
Ask: 32.00
Change: 1.25 (4.13%)
Spread: 1.00 (3.226%)
Open: 30.25
High: 31.50
Low: 30.25
Prev. Close: 30.25
CNR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Interim Results

9 Sep 2015 07:00

RNS Number : 4604Y
Condor Gold PLC
09 September 2015
 

 

 

CONDOR GOLD PLC

 

HIGHLIGHTS

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

Condor Gold PLC ("Condor", the "Company" or the "Group"), an AIM listed company presents its' interim financial report.

 

Condor completed a Pre-Feasibility Study (PFS) and two Preliminary Economic Assessments (PEAs) on La India Project in Nicaragua in December 2014. The PFS details an open pit gold mineral reserve of 6.9M tonnes at 3.0g/t gold for 675,000 oz gold producing 80,000 oz gold p.a. for 7 years. The PEA for the open pit only scenario details 100,000 oz gold production p.a. for 8 years whereas the PEA for a combination of open pit and underground details 140,000 oz gold production p.a. for 8 years. La India Project contains a total attributable mineral resource of 18.1Mt at 4.0g/t for 2.32M oz gold and 2.66M oz silver at 6g/t to the CIM Code. Condor announces its interim results for the period ended 30th June 2015.

 

HIGHLIGHTS TO 30 JUNE 2015

 

Test work in support of the PFS has continued to advance in the first half of 2015:

· 1,952m drilling completed, excellent drill intercept of 7.6m at 10.2g/t gold outside the main pit extends a high-grade ore shoot to the south and to depth.

· Soil survey programme provides several additional exploration targets.

· Engaged Whittle Consulting to run Enterprise Optimisation software on the technical studies used within the PFS and PEAs.

· Applied for and received a Terms of Reference for an EIA Permit.

· Implementation of several of the IFC's ESAP (Environmental and Social Action Plan) items.

· £2,410,675 at 30th June 2015 is sufficient to execute the current strategy

 

POST PERIOD HIGHLIGHTS

 

· Announced results of a 55km² soil survey programme, which targeted 6 areas on the 313km² La India project, several gold anomalies revealed.

· Structural report commissioned and new structural model underway.

· On 4th September 2015, the Company announced a Strategic Review and commencement of an offer period.

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CHAIRMANS STATEMENT

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

CHAIRMAN'S STATEMENT

 

 

Dear Shareholder,

 

I am pleased to present Condor's unaudited interim financial report for the 6 months ended 30th June 2015. An NI 43-101 technical report detailing a Pre-Feasibility Study ("PFS") and two Preliminary Economic Assessments ("PEAs") were posted on Condor's website on 21st December 2014. There have been no updates issued during the period to technical reports within the PFS or two PEAs on La India Project, Nicaragua.

 

The focus in the first half of 2015 has been on proving the exploration upside of La India Project through drilling and soil surveys, optimising the potential mining schedules, which will enhance NPVs and IRRs, and de-risking the Project from a permitting, land acquisition and social perspective.

 

On 4th September 2015, the Company announced a Strategic Review and commencement of an offer period. In the last 3 years the Company has operated in a chronic bear market. The gold price is down 41% from its all time high and the NYSE ARCA Gold Bugs Index (HUI), which represents junior gold companies, is down 72%. Investors have sold shares across the full spectrum of gold companies, irrespective of the fundamentals. Condor's share price has suffered accordingly even though La India Project, in the Board's view, is one of the most attractive resource/reserves due to the high average grade of 4.0g/t gold, low all in sustaining cash costs of under US$700 per oz gold, low upfront capital costs, 100% ownership of the concessions and mining friendly jurisdiction.

 

Against this background and the lack of appetite for equity financing in the junior gold exploration sector, the Board has conducted an internal review of strategic options going forward. The Board has concluded that the equity required for the construction of a mine at La India Project, given the upfront capital cost of between US$110M and US$169M estimated in the PFS and PEAs would prove significantly dilutive to existing shareholders. Furthermore, there is no guarantee that either equity or debt financing for the construction of the mine and associated infrastructure can be secured on satisfactory terms. The Board's view is that the completion of a Definitive Feasibility Study ("DFS"), while adding value to the Project, would be unlikely to be fully recognised in the share price and in any case, in the event that the strategic review results in an eventual sale of the Company's business or assets or of the Company itself, the DFS would be substantially reviewed by any acquirer. Condor will continue with its strategy of de-risking the La India Project by applying for an EIA Permit and securing the rural land, while continuing to show the upside of the Project through a soil survey programme, a detailed structural geology study and completing an enterprise optimisation study on the reserves and resources in the PFS and PEAs.

 

One of the options being considered would be a possible offer for the Company. Another option is for a joint venture or sale of one or more of the Company's assets, including the independent mineral resource estimate in El Salvador of 13.1M tonnes at 2.6g/t containing 1.1M oz gold equivalent.

 

As a reminder, the PFS and PEAs on La India Project are available on the Company's website.

 

During the period, the exploration upside was successfully demonstrated by 1,952m drilling and the commencement of a 55km² soil survey programme. A drill intercept of 7.55m (6.2m true width) at 10.2g/t gold to the south of the La India open pit reserve of 675,000 oz gold at 3.0g/t has been successful in indicating an extension of high grade gold mineralisation 100m outside the pit shell adjacent to La India underground resource. This high-grade intercept demonstrates that the underground mining potential at La India may currently be significantly underestimated. The 55km² soil survey programme tested 6 areas on the 313km² La India Project targeting underground mining deposits. It has been successful in defining several new gold anomalies. Additional drill programmes are on hold until market conditions improve and the number of staff employed in Nicaragua has been reduced in order to conserve cash.

 

 

 

 

CONDOR GOLD PLC

 

CHAIRMANS STATEMENT

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

 

To enhance the financial and economic model within the PFS and PEAs, Condor retained the services of Whittle Consulting to perform an Enterprise Optimization analysis using the resources/reserves within the PFS and PEAs. This is an integrated analysis that considers the design criteria that impact the complete range of economic drivers of the Project, including mine sequencing, cut-off grade strategy, mill grind/recovery/throughput assumptions, stockpile management, operating costs and initial capital. 

 

Condor has signed an agreement with ProNicaragua, which in the Board's view materially de-risks the permitting process and construction of a mine at Mina La India. ProNicaragua is the official investment and export agency of the Government of Nicaragua. It was created as a project of the United Nations Development Program www.pronicaragua.org. Condor has cultivated relations with ProNicaragua for over 3 years and has been instrumental in ProNicaragua presenting and supporting the mining industry at the Prospectors and Developers Association of Canada ("PDAC") annual conference in Toronto. The agreement with ProNicaragua allows for two lawyers working for ProNicaragua to be assigned to Condor on a full time basis to assist with permitting, land acquisition and other social areas.

 

In April, Condor submitted a 56 page report requesting the Terms of Reference ("TOR") for an Environmental Impact Assessment ("EIA") to the Ministry of Environment ("MARENA") as required for an Environmental Permit. The Environmental Permit is the key permit for mining in Nicaragua. Many other permits, e.g. a water permit, depend upon a positive EIA Report. It is really encouraging that MARENA issued the TOR for an EIA within 5 weeks. Under the local mining law Condor has to submit an application for EIA approval to MARENA within 6 months, by November 2015.

 

Condor has been working on a land acquisition programme for over 2 years and plans to acquire approximately 640 hectares of rural land for the production scenario in the PFS. ProNicaragua is assisting with a clean up of the land titles. Two independent valuations have been conducted and a strategy is being implemented to secure the rural land by paying 10% of the purchase price of the land to the landowners, who grant Condor an option to purchase the rural land. Securing freehold land over the project area will materially de-risk the Project.

 

The operating loss for the 6 month period was £1,454,872. The cash equivalents at 30th June 2015 were £2,410,675. There are currently 45,807,316 ordinary shares in issue.

 

The International Finance Corporation ("IFC"), the private sector investment body of the World Bank, is an 8.6% shareholder in the Company. Condor has to comply with the IFC Performance Standards, which are aimed at assuring the suitability of projects for direct financing. The IFC nominated Kate Harcourt to join the Board as a non-executive director in March 2015. A considerable amount of management time and money has been spent on implementing an Environmental and Social Action Plan. To give other shareholders a flavour of what is involved, Condor is committed to: 1) Develop an Environmental and Social Management System (ESMS) which includes the necessary management plans and standard operating procedures as part

 

of the operational control of the Health Safety Environmental and Community Policy to address existing environmental, social and health and safety risks from current exploration activities. 2) Design and implement a surface and ground water participatory monitoring program to identify existing water quality and quantity conditions in the area to serve as baseline for the future ESIA, communicating these to the local population. 3) Update a Stakeholder Engagement Plan and Grievance Mechanism and develop a Communications Plan 4) Update the Land Use and Compensation Plan. 5) Review the plan for the management of artisanal miners. 65) Develop/update a Human Resources Policy and develop a Security Policy and Code of Conduct for security personal. At the IFC's request, Condor has signed agreements, which cost the Company circa US$100,000, with two Independent Environmental and Social Consultants ("IESC"), who will be conducting site visits in September 2015. The Company's implementation of the IFC's performance standards at La India Project is establishing an excellent base for the sustainability of a future mine and hopefully de-risks the Project for all shareholders.

 

On 24th August 2011, Condor announced the purchase of the 2km² Espinito Mendoza Concession for a consideration of US$1,625,000 spread over 4 years, payable in cash and shares. The transaction requires Condor to complete 5,000m drilling, which Condor has not completed and for the seller of the Concession to provide clean title of the freehold land, which they have not provided and are unable to provide. Condor has paid US$1,125,000 to date and is withholding the balance of US$500,000 until this dispute is settled. SRK Consulting

 

 

CONDOR GOLD PLC

 

CHAIRMANS STATEMENT

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

 

(UK) Limited has estimated an independent inferred mineral resource of 980,000 tonnes at 6.7g/t gold for 209,000 oz gold on the Espinito Mendoza Concession.

 

A hearing was held in Vancouver, Canada on 27th to 29th May 2015 regarding an on-going dispute between B2Gold Corporation, Royal Gold Inc and Condor Gold plc over a 3% NSR on 65km² of La India Concession. The judge's ruling has recently been received. To quote the Judge: "In conclusion, I declare that La India Gold S.A. holds La India concession subject to the royalty originally made between Minera de Occidente S.A. (now Triton, owned by B2Gold) as payor and Repadre Capital Corporation (now Royal Gold) as the present holder. The La India concession, to the extent that it corresponds on the ground with the original concession subject of the royalty agreement, is, by clause 2.7 of the letter agreement, subject to the obligations of the royalty agreement." Condor is taking legal advice in Canada, Nicaragua and the UK on the implementation and enforceability of a Canadian ruling on a Nicaraguan incorporated company.

 

The Company has established a Risk Committee, which comprises of non executive directors Roger Davey and Kate Harcourt.

 

The moratorium on all mining and exploration continues in the Republic of El Salvador ("El Salvador") where the Company has 90% of a JORC Code Mineral resource of 13.15 Mt at 2.6g/t for 1,120,000 oz gold equivalent.

 

The strategy for 2015/2016 is to continue to demonstrate the significant exploration upside of La India project through geological mapping, soil geochemistry surveys and the production of a detailed structural model. The commissioning of Whittle Consulting to run its Enterprise Optimisation Software on the existing resources/reserves and technical studies used in the PFS and PEAs should be announced shortly. The strategy of securing the rural land, applying for an EIA permit and implementing the IFC performance standards will all materially de-risk the Project and pave the way for Mina La India to become the next large commercial mine in Nicaragua. Drilling is postponed until market conditions improve. The local employee payroll has recently been cut by 30% and the Board of directors has accepted reduced remuneration. The cash position of £2.4M at the end of June 2015 is sufficient for the Company to execute the current strategy

 

 

 

 

 

 

Mark Child

Executive Chairman and CEO

 

8 September 2014

 

 

 

 

 

CONDOR GOLD PLC

 

OPERATIONS REPORT AND PROJECT OVERVIEW

FOR THE SIX MONTHS TO 30 JUNE 2015

 

NICARAGUA - OPERATIONS REPORT

LA INDIA PROJECT

 

Following completion of the PFS on 21st December 2014, the Company focus has shifted to the demonstration of the project upside, while removing or minimizing remaining risk elements. In addition to the soil geochemistry survey and drilling that took place during the period at La India, Condor has applied and received a terms of reference for an Environmental Impact Assessment Permit (EIA Permit), progressed a land acquisition program and enhanced the stakeholder engagement strategy and Communications Plan. The Company is also engaged in an Enterprise Optimization program in conjunction with Whittle Consulting of Australia.

 

Pre-Feasibility Study Update

 

There is no current plan to update the existing PFS in the near future, however, Condor has re-assessed the setback requirements, thus reducing the land needed for the base case PFS from 700 hectares to about 640 ha. In addition, the PFS identified a few locations where local features might have been affected. These have been corrected in the process of generating the supporting documents for the EIA. Taken in conjunction with the revised setbacks, the impact on project economics is expected to be neutral.

 

Enterprise Optimization

 

Condor has retained the services of Whittle Consulting to perform an Enterprise Optimization analysis of the PFS study and the PEA cases presented in the 43-101 Technical Report of December 2014. This is an integrated analysis that considers the design criteria that impact the complete range of economic drivers of the project, including mine sequencing, cutoff grade strategy, mill grind/recovery/throughput assumptions, stockpile management and initial capital. This work is underway at the time of writing this report.

 

Land Acquisition

 

Condor has embarked on the initial stages of acquiring the land needed for the La India open pit mine. Initial focus is on the rural lands that comprise the greatest portion of area. The Land Acquisition process starts with first contact with the landholders, a valuation of the properties, and negotiation of an Option to Purchase Agreement in order to lock down the area. Simultaneously the legal status of the land is investigated and any Titles that require clearance are cleared. The Company is currently preparing a formalised Land Acquisition and Resettlement Framework with an International Social Consultant.

 

Condor has made initial contact with all landholders in the area of interest with 98% of the landholders agreeing to a property valuation. All the valuation appraisals have been completed by a certified land valuer. Two experienced lawyers have been contracted through Nicaragua's internal investment agency ProNicaragua to investigate of the legal status of Land Titles and to manage the clearance of Titles through the Authorities.

 

EIA application

Condor has started work on an EIA Permit for the La India open pit mine in order to secure a mining permit from the Nicaraguan Government's Ministry of the Environment and Natural Resources (MARENA). The Company has already received the terms of reference for the EIA and is assembling the information based on the detailed work underpinning the PFS.

Once the EIA has been completed and revised by the Authorities it will be open to public consultation prior to any final revisions and approval. The Company is aiming to submit the EIA by November 2015.

 

 

 

 

CONDOR GOLD PLC

 

OPERATIONS REPORT AND PROJECT OVERVIEW

FOR THE SIX MONTHS TO 30 JUNE 2015

 

Social work

Condor recognises the significant social impact that a new mine will have on the local community, and is committed to working with the local community to make sure that the change will be a positive one.

During the first half of 2015 the Company has restructured and increased the Community Relations activity. A new Community and Social Relations ("CSR") policy has been developed with guidance, and to the standards required by the IFC. The policy gives an emphasis to improved communication and transparency as the Company prepares for the public consultation period of the EIA. To achieve this the Company is in the process of constructing an Information Office located in La India Village to provide a focus for communication.

The policy identifies four main social areas to support: education, health, the Church and water. A Social Committee with the participation of relevant key stakeholders from the community has been set-up to ensure that the Community has an opportunity to have an input into how the social support budget is used. Moreover, Condor is working on creating alliances and promoting projects with higher impact and more beneficiaries.

 

Dave Crawford

Chief Technical Officer

 

 

Exploration Activity

 

Exploration activity has focussed on demonstrating the potential for expanding and extending future gold production beyond that envisaged in the La India Project PFS and PEA studies. The underground mining potential beneath the planned La India open pit has been tested, and exploration for evidence of undiscovered hidden deep-seated gold mineralisation beyond the core resource zone has advanced. During the first half of the year Condor completed exploration drilling to test the underground depth and strike extension potential of the flagship La India gold reserve, regional soil sampling over areas where the geological setting is prospective for the discovery of hidden deep-seated gold deposits, and follow-up drilling on the first two soil targets. In total the Company completed 7 diamond core drill holes for 1952m of drilling, and collected 5117 soil samples covering over 50km² area supplemented by 28 rock chip samples during the period.

 

Four diamond core drill holes for 1324m were drilled to test for significant extensions of gold mineralisation at depth beneath, and at depth along strike to the south of the La India open pit reserve of 675,000 oz gold at 3.0g/t. The drilling aimed to establish if there is potential to expand the current combined inferred and indicated underground mineral resource of 1.8Mt at 5.0g/t for 294,000 oz gold. One very successful intercept of 7.55m (6.2m true width) at 10.2g/t gold at a vertical depth of 260m below surface extended the known high-grade gold mineralisation at La India a further 50m along strike to the south and 60m deeper, confirming that high-grade gold mineralisation remains open along strike to the south at depth. This drill intercept was particularly significant as there is no evidence of gold mineralisation at surface above this intercept, demonstrating that hidden deep-seated high-grade gold mineralisation does occur at La India. This is encouraging for the Company's regional exploration programme which targets similar hidden gold deposits.

 

A regional soil geochemistry survey designed to look for high-level hydrothermal pathfinder elements above hidden deep-seated epithermal gold mineralisation was initiated in January, and completed post-period in August. The fine-fraction B-horizon soil was analysed for 53 elements at ultra-trace detection limits using ACME Laboratories in Vancouver's standard ICP-MS method. This method was selected based on the results of a 214 sample orientation survey completed last year in which different soil horizons and different analytical methods were compared. Including orientation survey samples and samples collected post-period the B-horizon soil ultra-trace geochemistry survey database currently comprises 5767 samples over a 55km² area covering six exploration areas selected during a District-scale prospectivity exercise undertaken by Condor geologists in 2013 and refined in 2014. The soil survey areas where selected by integrating geophysics, surface geology and the existing exploration data. The selected areas have geological structural setting conducive to the transport and deposition of gold-bearing hydrothermal fluids, and surface geology characteristics of a high-level setting above the boiling zone where epithermal gold deposition is most likely to occur.

 

 

 

CONDOR GOLD PLC

 

OPERATIONS REPORT AND PROJECT OVERVIEW

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

Interpretation of the soil geochemistry has improved the geological bedrock map through the definition of felsic, intermediate and mafic geochemical signatures, and identified alteration and mineralisation trends in areas where outcrop of mineralisation is sparse and field observations of structural trends inconclusive. For example dispersed and isolated gold outcrop occurrences at the Tatascame area, located 6km northeast of the La India open pit mineral reserve, show a clear linear soil anomaly with a northwest-southeast orientation which appears to be a strike continuation of the Andrea Vein, extending the Andrea hydrothermal conduit from a 2km long vein to a 4 to 7km long corridor. Similarly soil geochemistry demonstrates that hydrothermal activity on the structure that hosts the 400m long Cristalito Resource of 202kt at 5.27g/t for 34k oz gold actually extends for at least 1200m.

 

Follow-up exploration on the soil anomalies commenced. Two soil anomalies identified on the La Mojarra area where drill-tested by three drill holes for 628m drilling. The drilling tested the El Carrizal and Cerro El Pilon soil anomalies, located approximately 1.7km to the south and south-east respectively of La India open pit mineral reserve. Both sites returned high-level epithermal alteration and barren calcite veining at depths of up to 200m below surface at both localities. This suggests that any gold mineralisation would be deeper and therefore beyond the target depth of the current exploration programme in these two targets.

 

New Concession Acquisition

On the 23rd June Condor was granted the Tierra Blanca 25 year exploration and mining Concession. This new concession adds an additional 32 km² to the western side of the La India Project concession package, increasing the La India Project to a 313km² area. The Tierra Blanca Concession is a greenfield exploration area with a highly prospective geological setting, covering a caldera complex within a broad epithermal gold mineralisation corridor that runs for 75km from the La India gold District to Nicaraguan producer B2Gold's Villa Nueva Project.

 

Luc English

Exploration Manager

 

 

El Salvador Operations Update

 

Condor has continued to maintain a presence in El Salvador whilst the Government continues the suspension of metallic mining and exploration activity that has been in effect since 2007. The Company recognises that resolution of the situation lies with the Central Government, and Condor has maintained a continuous active dialogue and played a leading role in lobbying the Government in favour of a resumption of mining activity.

The wholly-owned El Salvador-registered subsidiary company, Minerales Morazon SA de CV has been kept fully registered and legally solvent in order to protect Condor's claims over the suspended licences and also to be ready to benefit from other prospective areas that are likely to become available should the Government elect to support metallic mining in the future.

Anti-mining NGOs continue to call for a law that bans metallic mining despite the findings of a Government initiated "Strategic Environmental Evaluation on the Metallic Mining in El Salvador" which recommended that the Government either allow mining with strict government controls or pay indemnity to the companies who have invested in exploration. The previous and current Legislative Assemblies have opted to research more on mining and have not yet proposed a law banning mining.

 

Jose Mario Gonzalez Granados

Country Administration Manager El Salvador

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONCESSION DATA

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

 

CURRENT CONCESSION HOLDINGS

 

Nicaragua Projects

 

Project

Concession

Ownership

Expiry Date

Area (km²)

La India Project

La India

100% Owned

January 2027

68.50

 

Espinito Mendoza

100% Owned

November 2026

2.00

 

Cacao

100% Owned

January 2032

11.90

 

Santa Barbara

100% Owned

April 2034

16.20

 

Real de la Cruz

100% Owned

January 2035

7.66

 

Rodeo

100% Owned

January 2035

60.40

 

La Mojarra

100% Owned

June 2029

27.00

 

La Cuchilla

100% Owned

August 2035

86.39

 

El Zacatoso

100% Owned

October 2039

1.00

 

Tierra Blanca

100% Owned

June 2040

32.21

 

Subtotal

 

 

313.26

Boaco

Rio Luna

100% Owned

June 2035

43.00

RACCN

Estrella

100% Owned

April 2035

18.00

Nueva Segovia

Potrerillos

100% Owned

December 2031

12.00

La Libertad-Santo Domingo District

Cerro Quiroz

20% Owned

April 2035

22.50

TOTAL

 

 

 

408.76

 

All concessions in Nicaragua are combined exploration and exploitation concessions.

 

El Salvador Projects

 

Project

Concession

Ownership

Expiry Date*

Area (km²)

La Calera

La Calera

100% Owned

under moratorium

42.00

El Pescadito

El Pescadito

100% Owned

under moratorium

50.00

 

Carolina

100% Owned

under moratorium

40.50

 

El Gigante

100% Owned

under moratorium

42.50

TOTAL

 

 

 

175.00

 

*All exploration and mining licences in El Salvador are currently under El Salvador's moratorium on mining and exploration activity. Condor owns 90% interest in El Salvador (remaining 10% gifted to the Condor Resources El Salvador Charitable Foundation).

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONCESSION DATA

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

 

 

CURRENT GLOBAL CIM/JORC CODE MINERAL RESOURCE

 

The following Mineral Resource estimations have been reported by independent geologists in accordance with the terms and definitions of the CIM/JORC Code. The Mineral Resource Estimations for Nicaragua were completed by SRK Consulting (UK) Ltd. and for El Salvador by Geosure Exploration and Mining Solutions (La Calera and part of Pescadito) and Ravensgate Resources (part of Pescadito).

 

 

Tonnes

Gold

Silver

Gold Equivalent

CIM/JORC

 

(kt)

Grade

(g/t)

Contained

(koz)

Grade

(g/t)

Contained

(koz)

Grade (g/t)

Contained

(koz)

Attributable Contained

(koz)

Category

 

Nicaragua Projects (100% Condor owned)

La India

9,600

3.5

1,083

6

1,792

3.6

1,110

1,110

Indicated

Project

8,500

4.5

1,233

7

865

4.6

1,246

1,246

Inferred

Total

18,100

4.0

2,316

6

2,656

4.1

2,356

2,356

Ind + Inf

Rio Luna

 

694

3.5

80

56

500

4.4

86

86

Inferred

Total

18,800

4.0

2,395

7

3,158

4.1

2,442

2,442

Ind+Inf

 

El Salvador Projects (90% Condor owned)

Pescadito

7,100

1.9

434

97

22,100

3.4

764

688

Inferred

La Calera

 

6,000

1.6

313

-

-

1.6

317

285

Inferred

Total

13,100

1.8

747

53

22,380

2.6

1,081

964

Inferred

 

 

 

 

 

 

 

 

 

 

Grand Total

31,900

3.1

3,142

30

25,530

3.5

3,523

3,415

Inferred

 

Note that tonnage is rounded to nearest 10,000t, gold grade is rounded to nearest 0.1g/t, silver and gold equivalent grade to nearest 1g/t, contained gold and gold equivalent to nearest 1,000oz and contained silver to nearest 10,000oz. Gold equivalent is calculated using silver:gold ratio of 67:1. Attributable gold is calculated as 90% interest in El Salvador licences (remaining 10% gifted to the Condor Resources El Salvador Charitable Foundation).

 

 

CURRENT LA INDIA PROJECT CIM CODE MINERAL RESOURCE

 

The following Mineral Resource estimations detail Condor's CIM compliant Mineral Resource Statement as at 30th September 2014 for the La India Project, as signed off by Ben Parsons of SRK Consulting (UK) Ltd, a Competent Person as defined by the CIM Code.

 

 

 

 

 

CONDOR GOLD PLC

 

CONCESSION DATA

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

 

Table 1. CIM Compliant Mineral Resource Statement as at 30 September 2014 for the La India Project (SRK Consulting (UK) Ltd.).SRK MINERAL RESOURCE STATEMENT SPLIT PER VEIN as of 30 September 2014 (4),(5),(6)

Category

Area Name

Vein Name

Cut-Off

 

Gold

Silver

Tonnes (kt)

Au Grade (g/t)

Au (Koz)

Ag Grade (g/t)

Ag (Koz)

Indicated

La India veinset

La India/ California(1)

0.5 g/t (OP)

8,267

3.1

832

5.5

1,462

La India/ California(2)

2.0 g/t (UG)

706

4.9

111

10.6

240

America veinset

America Mine

0.5 g/t (OP)

114

8.1

30

4.9

18

America Mine

2.0 g/t (UG)

470

7.3

110

4.7

71

Inferred

La India veinset

La India/ California(1)

0.5 g/t (OP)

895

2.4

70

4.3

122

Teresa(3)

0.5 g/t (OP)

4

6.6

1

La India/ California(2)

2.0 g/t (UG)

1,107

5.1

182

11.3

401

Teresa(2)

2.0 g/t (UG)

82

11.0

29

Arizona(3)

1.5 g/t

430

4.2

58

Agua Caliente(3)

1.5 g/t

40

9.0

13

America veinset

America Mine

0.5 g/t (OP)

677

3.1

67

5.5

120

America Mine

2.0 g/t (UG)

1,008

4.8

156

6.8

221

Guapinol(3)

1.5 g/t

751

4.8

116

Mestiza veinset

Tatiana(3)

1.5 g/t

1,080

6.7

230

Buenos Aires(3)

1.5 g/t

210

8.0

53

Espenito(3)

1.5 g/t

200

7.7

50

Central Breccia

Central Breccia(1)

0.5 g/t (OP)

922

1.9

56

San Lucas

San Lucas(3)

1.5 g/t

330

5.6

59

Cristalito-Tatescame

Cristalito-Tatescame(3)

1.5 g/t

200

5.3

34

El Cacao

El Cacao(3)

1.5 g/t

590

3.0

58

(1) The La India, America and Central Breccia pits are amenable to open pit mining and the Mineral Resource Estimates are constrained within Whittle optimised pits, which SRK based on the following parameters: A Gold price of USD1,500 per ounce of gold with no adjustments. Prices are based on experience gained from other SRK Projects. Metallurgical recovery assumptions of 91% for gold, based on assumptions provided by the Company Marginal costs of USD19.2/t for processing, USD5.63/t G&A and USD2.47/t for mining, slope angles defined by the Company Geotechnical study which range from angle 46 - 48°.

(2) Underground mineral resources beneath the open pit are reported at a cut-off grade of 2.0 g/t over a minimum width of 1.0m. Cut-off grades are based on a price of USD1,500 per ounce of gold and gold recoveries of 91% for resources, costs of USD19.0/t for processing, USD10.0/t G&A and USD50.0/t for mining, without considering revenues from other metals.

(3) Mineral resources as previously quoted by SRK (22 December 2011) are reported at a cut-off grade of 1.5 g/t, and have not been updated as part of the current study due to no further detailed exploration.

(4) Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and have been used to derive sub-totals, totals and weighted averages. Such calculations inherently involve a degree of rounding and consequently introduce a margin of error. Where these occur, SRK does not consider them to be material. All composites have been capped where appropriate. The Concession is wholly owned by and exploration is operated by Condor Gold plc

(5) The reporting standard adopted for the reporting of the MRE uses the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves (May 2014) as required by NI 43-101.

(6) SRK Completed a site inspection to the deposit by Mr Benjamin Parsons, MSc (MAusIMM(CP), Membership Number 222568, an appropriate "independent qualified person" as this term is defined in National Instrument 43-101.

 

 

CONDOR GOLD PLC

 

CONCESSION DATA

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

Table 2. Summary of La India Project Mineral Resource Statement as of 30 September 2014 (SRK Consulting (UK) Ltd.).

 

SRK MINERAL RESOURCE STATEMENT SPLIT PER VEINSET as of 30 September 2014

Category

Area Name

Vein Name

Cut-Off

gold

silver 

Tonnes (kt)

Au Grade (g/t)

Au (Koz)

Ag Grade (g/t)

Ag (Koz)

Indicated

Subtotal Areas

La India veinset

0.5g/t (OP)

8,267

3.1

832

5.5

1,462

2.0 g/t (UG)

706

4.9

111

10.6

240

America veinset

0.5g/t (OP)

114

8.1

30

4.9

18

2.0 g/t (UG)

470

7.3

110

4.7

71

Inferred

Subtotal Areas

La India veinset

0.5g/t (OP)

899

2.5

71

4.3

122

2.0 g/t (UG)

1,189

5.5

211

11.3

401

1.5 g/t

470

4.7

71

America veinset

0.5g/t (OP)

677

3.1

67

5.5

120

2.0 g/t (UG)

1,008

4.8

156

6.8

221

1.5 g/t

751

4.8

116

Mestiza veinset

1.5 g/t

1,490

7.0

333

Central Breccia

0.5g/t (OP)

922

1.9

56

Other veins

1.5 g/t

1,120

4.2

151

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONCESSION DATA

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

 

Table 3. Summary of La India Project Mineral Resource Statement as of 30 September 2014 (SRK Consulting (UK) Ltd.)

 

SRK MINERAL RESOURCE STATEMENT as of 30 September 2014 (4),(5),(6)

Category

Area Name

Vein Name

Cut-Off

gold

silver 

Tonnes (kt)

Au Grade (g/t)

Au (Koz)

Ag Grade (g/t)

Ag (Koz)

Indicated

Grand total

All veins

0.5g/t (OP) (1)

8,382

3.2

862

5.5

1480

2.0 g/t (UG) (2)

1,176

5.9

221

8.2

312

Subtotal Indicated

9,557

3.5

1,083

5.8

1792

Inferred

Grand total

All veins

0.5g/t (OP) (1)

2,498

2.4

194

4.8(7)

242

2.0 g/t (UG) (2)

2,197

5.2

366

8.8

622

1.5 g/t (3)

3,831

5.4

671

Subtotal Inferred

8,526

4.5

1,231

7.1(8)

865

 

(1) The La India, America and Central Breccia pits are amenable to open pit mining and the Mineral Resource Estimates are constrained within Whittle optimised pits, which SRK based on the following parameters: A Gold price of USD1,500 per ounce of gold with no adjustments. Prices are based on experience gained from other SRK Projects. Metallurgical recovery assumptions of 91% for gold, based on assumptions provided by the Company Marginal costs of USD19.2/t for processing, USD5.63/t G&A and USD2.47/t for mining, slope angles defined by the Company Geotechnical study which range from angle 46 - 48°.

 

(2) Underground mineral resources beneath the open pit are reported at a cut-off grade of 2.0 g/t over a minimum width of 1.0m. Cut-off grades are based on a price of USD1500 per ounce of gold and gold recoveries of 93 percent for resources, costs of USD19.0/t for processing, USD10.0/t G&A and USD50.0/t for mining, without considering revenues from other metals.

 

(3) Mineral resources as previously quoted by SRK (22 December 2011) are reported at a cut-off grade of 1.5 g/t, and have not been updated as part of the current study due to no further detailed exploration.

 

(4) Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and have been used to derive sub-totals, totals and weighted averages. Such calculations inherently involve a degree of rounding and consequently introduce a margin of error. Where these occur, SRK does not consider them to be material. All composites have been capped where appropriate. The Concession is wholly owned by and exploration is operated by Condor Gold plc

 

(5) The reporting standard adopted for the reporting of the MRE uses the terminology, definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves (December 2005) as required by NI 43-101.

 

(6) SRK Completed a site inspection to the deposit by Mr Benjamin Parsons, MSc (MAusIMM(CP), Membership Number 222568, an appropriate "independent qualified person" as this term is defined in National Instrument 43-101.

 

(7) Back calculated silver grade based on a total tonnage of 1,576 Kt as no silver estimates for Central Breccia (922 Kt).

 

(8) Back Calculated silver grade based on total tonnage of material estimated for silver of 3,7731 Kt, for veins where silver assays have been recorded in the database

 

 

CONDOR GOLD PLC

 

CONCESSION DATA

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

CURRENT LA INDIA PROJECT CIM CODE MINERAL RESERVE

 

Table 3. La India Open Pit Mineral Reserve Estimate for La India Project Mineral Resource Statement as of 21 December 2014 (SRK Consulting (UK) Ltd.).

 

 Mineral Reserve Class

 Diluted Tonnes

Diluted Grade

Contained Metal

(Mt dry)

(g/t Au)

(g/t Ag)

(koz Au)

(koz Ag)

Proven

-

-

-

-

-

Probable

6.9

3.0

5.3

675

1,185

Total

6.9

3.0

5.3

675

1,185

*Open pit mineral reserves are reported at a cut-off grade of 0.75 g/t Au assuming: metal price of USD 1,250 per ounce gold, processing cost of USD 20.42 per tonne milled, G&A cost of 5.63 USD per tonne milled, 10 USD/oz Au selling cost, 3% royalty on sales and a processing recovery of 91%.

 

 

 

CURRENT RIO LUNA CONCESSION CIM CODE MINERAL RESOURCE

 

The following JORC compliant Mineral Resource and Reserve estimates contained within Condor Gold PLC's 100%-owned Rio Luna Concession is signed off by Ben Parsons of SRK Consulting (UK) Ltd., a Competent Person as defined by the CIM Code.

 

Table 4. JORC Compliant Mineral Resource Statement as at 28 November 2011 for the Rio Luna Concession (SRK Consulting (UK) Ltd.).

 

SRK Mineral Resource Statement, Rio Luna Deposit, 28th November 2011

Category

Vein Name

Tonnes (kt)

Gold Grade (g/t)

Contained Gold (oz)

Tonnes (kt)

Silver Grade (g/t)

Contained Silver (oz)

Inferred

El Paraiso

395

4.01

52,000

Inferred

El Rodeo

20

2.66

2,000

Inferred

San Andreas

280

2.88

26,000

26

56

500,000

Inferred

Subtotal

695

3.50

80,000

26

56

500,000

Mineral Resources are reported at a cut-off grade of 1.5 g/t. Cut-off grades are based on a price of US$1200 per ounce of gold and gold recoveries of 90 percent for resources, without considering revenues from other metals. Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. All composites have been capped where appropriate. The Concession is wholly owned by and exploration is operated by Condor Resources plc.

 

 

 

 

CONDOR GOLD PLC

 

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

Six months

 to 30.06.15

unaudited

£

 

Six months

 to 30.06.14

unaudited

£

Revenue

-

 

-

 

 

 

 

Net loss arising on foreign translations

(1,095,582)

 

(841,838)

Administrative expenses

(362,803)

 

(728,017)

 

 

 

 

Operating loss

(1,458,385)

 

(1,569,855)

 

 

 

 

Finance income

3,513

 

1,360

Net gain on financial assets at fair value through profit and loss account

-

 

-

 

 

 

 

Loss before income tax

(1,454,872)

 

(1,568,495)

 

 

 

 

Income tax expense

-

 

-

 

 

 

 

Loss for the period

(1,454,872)

 

(1,568,495)

 

 

 

 

 

 

 

 

Other comprehensive income/(loss):

 

 

 

Currency translation differences

(90,509)

 

383,810

Other comprehensive income/(loss) for the period

(90,509)

 

383,810

 

 

 

 

Total comprehensive income/(loss) for the period

(1,364,363)

 

(1,952,305)

 

 

 

 

 

 

 

 

Income/(loss) attributable to:

 

 

 

Non-controlling interest

(30)

 

(3,643)

Owners of the parent

(1,454,842)

 

(1,564,852)

 

(1,454,872)

 

(1,568,495)

 

 

 

 

Total comprehensive income/(loss) attributable to:

 

 

 

Non-controlling interest

699

 

2,716

Owners of the parent

(1,365,062)

 

(1,955,021)

 

(1,364,363)

 

(1,952,305)

 

 

 

 

 

 

 

 

Loss per share expressed in pence per share:

 

 

 

Basic and diluted (in pence)

Note 5

(3.62)

 

(4.20)

 

 

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

AS AT 30 JUNE 2015

 

 

 

30.06.15

unaudited

£

 

31.12.14

 

£

 

30.06.14

unaudited

£

ASSETS:

 

 

 

 

 

NON-CURRENT ASSETS

 

 

 

 

 

Property, plant and equipment

339,212

 

321,558

 

275,908

Intangible assets

17,326,980

 

16,607,111

 

14,487,133

 

17,666,192

 

16,928,669

 

14,763,041

 

 

 

 

 

 

CURRENT ASSETS

 

 

 

 

 

Trade and other receivables

1,214,423

 

967,416

 

846,450

Financial assets at fair value through profit and loss

-

 

-

 

-

Cash and cash equivalents

2,410,675

 

4,761,128

 

754,938

 

3,625,098

 

5,728,544

 

1,601,388

 

 

 

 

 

 

TOTAL ASSETS

21,291,290

 

22,657,213

 

16,364,429

 

 

 

 

 

 

LIABILITIES:

 

 

 

 

 

CURRENT LIABILITIES

 

 

 

 

 

Trade and other payables

569,557

 

571,117

 

700,113

 

 

 

 

 

 

 

 

 

 

 

 

NON-CURRENT LIABILITIES

 

 

 

 

 

Other payables

-

 

-

 

-

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL LIABILITIES

569,557

 

571,117

 

700,113

 

 

 

 

 

 

NET CURRENT ASSETS

3,055,541

 

5,157,427

 

901,275

 

 

 

 

 

 

 

NET ASSETS

 

20,721,733

 

 

22,086,096

 

 

15,664,316

 

 

 

 

 

 

 

 

 

 

 

 

SHAREHOLDERS' EQUITY

 

 

 

 

 

Called up share capital

9,161,463

 

9,161,463

 

7,664,792

Share premium

27,442,728

 

27,442,728

 

22,228,265

Legal reserves

71

 

71

 

71

Exchange difference reserve

800,985

 

710,476

 

(8,828)

Share options reserve

3,236,680

 

3,236,680

 

2,551,670

Retained earnings

(19,920,194)

 

(18,465,322)

 

(16,771,654)

 

 

20,721,733

 

 

22,086,096

 

 

15,664,316

 

 

 

 

 

 

TOTAL EQUITY ATTRIBUTABLE TO:

 

 

 

 

 

Non-controlling interest

(72,518)

 

(73,187)

 

(66,701)

Owners of the parent

20,794,251

 

22,159,283

 

15,731,017

 

 

20,721,733

 

 

22,086,096

 

 

15,664,316

 

 

 

 

 

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

AS AT 30 JUNE 2015

 

 

 

 

Share Capital

Share premium

Legal reserve

Exchange difference reserve

Share option reserve

Retained earnings

Total

Non Controlling Interest

Total Equity

£

£

£

£

£

£

£

£

£

At 31 December 2013

7,664,792

22,228,265

71

371,053

2,551,670

(15,130,353)

17,685,498

(68,877)

17,616,621

Comprehensive income:

Loss for the year

-

-

-

-

-

(3,257,812)

(3,257,812)

(4,351)

(3,262,163)

Other comprehensive income:

Currency translation differences

-

-

-

335,453

-

-

335,453

41

335,494

Total comprehensive income

7,664,792

22,228,265

71

706,506

2,551,670

(18,388,165)

14,763,139

 

(73,187)

14,689,952

New shares issued

1,496,671

5,214,463

-

-

-

-

6,711,134

-

6,711,134

Share based payment

-

-

-

-

685,010

-

685,010

-

685,010

At 31 December 2014

9,161,463

27,442,728

71

706,506

3,236,680

(18,388,165)

22,159,283

(73,187)

22,086,096

Comprehensive income:

Loss for the year

-

-

-

-

-

(1,454,842)

(1,454,842)

(30)

(1,454,872)

Other comprehensive income:

Currency translation differences

 

-

 

-

 

-

 

89,810

 

-

 

-

 

89,810

 

699

 

90,509

9,161,463

27,442,728

71

796,316

3,236,680

(19,843,007)

 20,794,251

(72,518)

20,721,733

New shares issued

-

-

-

-

-

-

-

-

-

Share based payment

-

-

-

-

-

-

-

-

-

At 30 June 2015

9,161,463

27,442,728

71

796,316

3,236,680

(19,843,007)

20,794,251

(72,518)

20,721,733

 

 

 

 

 

CONDOR GOLD PLC

 

CONSOLIDATED CASH FLOW STATEMENT

AS AT 30 JUNE 2015

 

 

 

 

 

Six months

to 30.06.15

unaudited

£

 

Six months

 to 30.06.14

unaudited

£

 

Cash flows from operating activities

Loss before tax

 

 

(1,454,872)

 

(1,568,495)

 

Depreciation charges

 

 

1,035

 

5,914

 

Profit/(loss) on sale of tangible fixed assets

 

 

-

 

-

 

Impairment charge of intangible fixed assets

 

 

17,017

 

16,404

 

Finance income

 

 

(3,513)

 

(1,360)

 

 

 

 

(1,440,333)

 

(1,547,537)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Increase)/decrease in trade and other receivables

 

 

(247,007)

 

132,265

 

Increase/(decrease) in trade and other payables

 

 

(1,560)

 

49,896

 

Income tax paid

 

 

-

 

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net cash absorbed in operating activities

 

 

(1,688,900)

 

(1,365,376)

 

 

 

 

 

 

 

 

Cash flows from investing activities

 

 

 

 

 

 

Purchase of intangible fixed assets

 

 

(1,112,030)

 

(512,587)

 

Purchase of tangible fixed assets

 

 

(27,720)

 

(3,150)

 

Interest received

 

 

3,513 

 

1,360 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net cash absorbed in investing activities

 

 

(1,136,237)

 

(514,377)

 

 

 

 

 

 

 

 

Cash flows from financing activities

 

 

 

 

 

 

Issue of shares

 

 

-

 

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net cash absorbed in financing activities

 

 

-

 

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Decrease)/increase in cash and cash equivalents

 

 

(2,825,137)

 

(1,879,753)

 

Cash and cash equivalents at beginning of period

 

 

4,761,128

 

2,268,470

 

Exchange losses on cash and bank

 

 

474,684

 

366,222

 

 

 

 

 

 

 

 

Cash and cash equivalents at end of period

 

 

2,410,675

 

754,939

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

NOTES TO THE FINANCIAL STATEMENTS

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

1. COMPLIANCE WITH ACCOUNTING STANDARDSBasis of preparation

This financial information has been prepared in accordance with IAS 34 "Interim financial reporting" as adopted by the European Union. The standards have been applied consistently. The statutory accounts for the year ended 31 December 2014, which have been filed with the Registrar of Companies, were prepared under IFRS and IFRIC interpretations as adopted by the European Union and with those parts of the Companies Act 2006 applicable to companies preparing their account under IFRS. The auditors reported on those accounts; their Audit Report was unqualified and did not contain a statement under either Section 237(2) or Section 237(3) of the Companies Act 2006.

The Interim Report is unaudited and does not constitute statutory financial statements as defined in section 434 of the Companies Act 2006.

The Interim Report for the six months ended 30 June 2015 was approved by the Directors on 08 September 2014.

The directors consider the going concern basis to be appropriate based on cash flow forecasts and projections and current levels of commitments, cash and cash equivalents.

The comparative period presented is that of the six months ended 30 June 2014. The directors are of the opinion that due to the nature of the group's activities and the events during that period these are the most appropriate comparatives for the current period.

Copies of the Interim Report are available from the Company's website www.condorgoldplc.com.

 

2. ACCOUNTING POLICIES

The interim financial information for the six months ended 30 June 2015 has been prepared on the basis of the accounting policies set out in the most recently published financial statements for the Group for the year ended 31 December 2014, which are available on the Company's website www.condorgoldplc.com, as the company does not anticipate the addition of new standards to the Group's results for the year ended 31 December 2015.

 

 

3. REVENUE AND SEGMENTAL REPORTING

The Group has not generated any revenue during the period.

The Group's operations are located in England, El Salvador and Nicaragua.

The following is an analysis of the carrying amount of segment assets, and additions to plant and equipment, analysed by geographical area in which the assets are located.

 

The Group's results by reportable segment for the period ended 30 June 2015 are as follows:

 

 

UK

2015

£

 

El Salvador

2015

£

 

Nicaragua

2015

£

 

Consolidation

2015

£

RESULTS

 

 

 

 

 

 

 

Operating (loss)

(1,167,673)

 

(337)

 

(290,375)

 

(1,458,385)

 

 

 

 

 

 

 

 

Interest income

3,480

 

33

 

-

 

3,513

 

 

 

 

 

 

 

 

Income tax expense

-

 

-

 

-

 

-

 

 

 

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

NOTES TO THE FINANCIAL STATEMENTS

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

3. REVENUE AND SEGMENTAL REPORTING - continued

 

Assets

 

All transactions between each reportable segment are accounted for using the same accounting policies as the Group uses.

 

 

UK

2015

£

 

El Salvador

2015

£

 

Nicaragua

2015

£

 

Consolidation

2015

£

ASSETS

 

 

 

 

 

 

 

Total assets

2,733,640

 

4,724,391

 

13,833,259

 

21,291,290

 

 

UK

2015

£

 

El Salvador

2015

£

 

Nicaragua

2015

£

 

Consolidation

2015

£

LIABILITIES

 

 

 

 

 

 

Total liabilities

(417,064)

 

-

 

(152,493)

 

(569,557)

 

 

The Group's results by reportable segment for the period ended 30 June 2014 are as follows:

 

 

UK

2014

£

 

El Salvador

2014

£

 

Nicaragua

2014

£

 

Consolidation

2014

£

RESULTS

 

 

 

 

 

 

 

Operating (loss)

(666,856)

 

(36,448)

 

(866,551)

 

(1,569,855)

 

 

 

 

 

 

 

 

Interest income

1,339

 

21

 

-

 

1,360

 

 

 

 

 

 

 

 

Income tax expense

-

 

-

 

-

 

-

 

 

 

 

 

 

 

 

 

 

Assets

 

All transactions between each reportable segment are accounted for using the same accounting policies as the Group uses.

 

 

UK

2014

£

 

El Salvador

2014

£

 

Nicaragua

2014

£

 

Consolidation

2014

£

ASSETS

 

 

 

 

 

 

 

Total assets

775,456

 

4,270,797

 

11,318,176

 

16,364,429

 

 

UK

2014

£

 

El Salvador

2014

£

 

Nicaragua

2014

£

 

Consolidation

2014

£

LIABILITIES

 

 

 

 

 

 

 

Total liabilities

(635,335)

 

(500)

 

(64,278)

 

(700,113)

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

NOTES TO THE FINANCIAL STATEMENTS

FOR THE SIX MONTHS TO 30 JUNE 2015

 

 

4. TAXATIONThere is no current tax charge for the period. The accounts do not include a deferred tax asset in respect of carry forward unused tax losses as the Directors are unable to assess that there will be probable future taxable profits available against which the unused tax losses can be utilised.

 

5. EARNINGS PER SHAREBasic earnings per share is calculated by dividing the earnings attributable to ordinary shareholders by the weighted average number of ordinary shares outstanding during the period.A reconciliation is set out below:

 

 

 

Six months

 to 30.06.15

 

 

Six months

 to 30.06.14

 

Basic EPS

 

 

 

 

 

 

 

 

 

 

 

Loss for the period

 

 

(1,454,872)

 

(1,568,495)

Weighted average number of shares

 

 

40,183,746

 

37,339,399

 

 

 

 

 

 

 

 

 

 

 

 

Loss per share (in pence)

 

 

(3.62)

 

(4.20)

 

 

 

 

 

 

In accordance with IAS 33, as the Group has reported a loss for the period, diluted earnings per share are not included.

 

 

 

 

 

 

6. CALLED-UP SHARE CAPITAL

 

 

 

 

 

 

 

 

30.06.15

£

 

30.06.14

£

 

 

 

 

 

 

Allotted and fully paid

 

 

 

 

 

 

 

 

 

 

 

Ordinary shares 45,807,316 of 20p each (30.06.14: 38,323,960 of 20p each)

 

9,161,463

 

7,664,792

 

 

7. RELATED PARTY TRANSACTIONS

 

During the half year the company received consultancy advice from the following related parties:

 

 

 

 

 

 

30.06.15

30.06.14

Company

Related party

 

Payments

 

£

Outstanding

balance

£

Payments

 

£

Outstanding

balance

£

Axial Associates Limited

Mark Child

25,000

-

25,000

-

Burnbrae Limited

Jim Mellon

12,500

-

12,500

-

Peter Flindell 39,987 - - -

 

 

8. SEASONALITY OF THE GROUP'S BUSINESS OPERATIONSThere are no seasonal factors which affect the trade of any company in the group.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IR LPMFTMBBMBFA
Date   Source Headline
2nd Jan 202411:09 amRNSTotal Voting Rights
12th Dec 20237:00 amRNSIncrease Fund Raise: £1,851,999 Issue of Equity
5th Dec 20237:00 amRNSCondor Gold Provides Update on the Sale of Assets
16th Oct 20239:57 amRNSExercise of Options
12th Sep 20233:12 pmRNSRetirement of Non Executive Director
7th Sep 20237:00 amRNSInterim Report & Accounts - 6 Months to 30 June 23
21st Jul 20237:00 amRNSUpdate on the Sale of Assets
7th Jul 20235:44 pmRNSGrant of Options - Correction
7th Jul 20233:54 pmRNSCondor Gold Grant of Options 2023
4th Jul 20235:17 pmRNS£1M Raise, Exercise Warrants Dir/PDMR Shareholding
10th May 20236:16 pmRNSResult of AGM
10th May 202310:55 amRNSConfirmation of time for Condor AGM
31st Mar 20231:54 pmRNSDirector/PDMR Shareholding
28th Mar 20237:00 amRNSAnnual Financial Report
14th Mar 20234:35 pmRNSPrice Monitoring Extension
13th Mar 20234:35 pmRNSPrice Monitoring Extension
13th Mar 20237:40 amRNSCondor Gold Provides an Update on Sale of Assets
13th Mar 20237:31 amRNSCondor Gold Provides an Update on Sale of Assets
13th Mar 20237:00 amRNSCondor Gold Provides an Update on Sale of Assets
22nd Dec 202210:05 amRNSAppointment of Denham Eke as a Non-Exec Director
21st Dec 20222:44 pmRNSFundraise of £3.3m, Results of Open Offer, Placing
5th Dec 20227:00 amRNSProposed Open Offer to Raise up to £3.9M
30th Nov 20228:01 amEQSCondor Gold entertaining potential buyers for La India gold project
28th Nov 20227:00 amRNSFundraise via Convertible Loan Note & Open Offer
22nd Nov 20227:00 amRNSStrategy Update, Advisor Appt to Sell the Assets
14th Nov 20227:00 amRNSUnaudited results for the 3rd Quarter
9th Nov 20224:40 pmRNSSecond Price Monitoring Extn
9th Nov 20224:35 pmRNSPrice Monitoring Extension
27th Oct 20225:49 pmRNSCondor Gold Comment on US Sanctions
26th Oct 20227:00 amRNSCNR Files Feasibility Study Tech Report on SEDAR
13th Oct 20224:41 pmRNSSecond Price Monitoring Extn
13th Oct 20224:36 pmRNSPrice Monitoring Extension
12th Oct 20227:00 amRNSJim Mellon assumes Chairmanship of Condor Gold
13th Sep 20224:35 pmRNSGrant of Options
12th Sep 20227:00 amRNSCondor Feasibility Study For La India Open Pit
17th Aug 20227:00 amRNSMineral Resource Update for La India Project
16th Aug 20227:00 amRNSUnaudited Interim Results
4th Aug 20227:00 amRNSMetallurgical Test Results for La India Open Pit
29th Jul 20223:40 pmRNSTotal Voting Rights
18th Jul 20227:00 amRNSExercise of Warrants, Director’s Dealing and TVR
6th Jul 20223:53 pmRNSTotal Voting Rights and Holdings in Company
14th Jun 20222:05 pmRNSSecond Price Monitoring Extn
14th Jun 20222:00 pmRNSPrice Monitoring Extension
14th Jun 20227:00 amRNSCondor Gold Raises £3.25m Via Private Placement
23rd May 20227:00 amRNSLa India Open Pit Drill Results
13th May 20227:00 amRNSResults for the three months ended 31 March 2022
12th May 20224:58 pmRNSResults of Annual General Meeting
29th Mar 20227:00 amRNSResults For The Year Ended 31 December 2021
10th Mar 20227:00 amRNSAll Assay Results Received for La Mestiza Open Pit
13th Jan 20224:55 pmRNSExercise of Options and Issue of Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.