The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further Positive Drilling Results from the Pakrut Licensed Area

2 Apr 2012 07:00

Kryso Resources plc

('Kryso' or the 'Company')

Further Positive Drilling Results from the Pakrut Licensed Area

Kryso Resources plc (AIM:KYS), the mineral exploration and development company with gold and nickel-copper projects in Tajikistan, is pleased to report further encouraging assay results from drilling completed during 2011 at its Pakrut gold deposit and at its exploration projects at Eastern Pakrut and in the Rufigar area.

Highlights of drill hole intersections (all true widths of ore zones):

Pakrut

Ore Zone 1: 27.13m @10.59g/t, 4.65m @5.59g/t Au Ore Zone 2: 4.18m @ 3.42g/t Au Ore Zone 3: 18.85m @ 7.47g/t Au Ore Zone 6: 6.53m @ 12.08g/t Au

Rufigar and Eastern Pakrut

Ore Zone 2, Central Rufigar: 14.07m @ 3.11g/t Au Ore Zone 1, Upper Rufigar: 5.98m @ 2.31g/t Au Ore Zone 2, Upper Rufigar: 4.63m @ 2.35g/t Au Road cut at Eastern Pakrut Ore Zone 14: 9.5m @ 4.56g/t Au

The main objectives of the 2011 diamond drill programme were two-fold:

1. Beginning in April, exploration drilling was continued at Eastern Pakrut, and preliminary exploration drilling commenced in the Rufigar area with Kryso's three existing drill rigs.

2. Beginning in August, after the commissioning of two new more powerful drilling rigs, drilling commenced at Pakrut to improve the definition of the Pakrut resources and verify their continuation at depth.

At Eastern Pakrut, Central Rufigar and Upper Rufigar, while only moderate gold grades were intersected, Kryso is encouraged that every drill hole intersected mineralisation. It is anticipated that grades and thickness will increase at deeper levels as they did at Pakrut. In addition, Eastern Pakrut is 650m geologically higher than the main Pakrut ores zones which are over two kilometres to the west down the Pakrut River valley.

At Pakrut, Ore Zone 1, which from previous drilling indicated a strike length of approximately 100m from west to east, was found to be continuing eastwards at deeper levels in 2010. Two deeper holes in 2011 now show that mineralisation is still plunging downwards and to the east, and the intersections highlighted above are 650m below adit level.

The intersections in Ore Zone 3 and 6 are very encouraging, where nearly 19m @ 7.47g/t Au is the best intersection to date for Ore Zone 3.

The total metrage drilled in 2011 was 8,895m of which 5,240m was at Pakrut. Kryso has drilled 36,256m in total since 2005.

The 2011 assay results were received from the Intertek Group in Beijing, China, an independent assay laboratory.

Kryso intends to report an updated resource estimate to the market in the second quarter of 2012.

Kryso has recently purchased two additional powerful diamond drilling rigs - making a total of seven diamond drill rigs and one RC rig on site. During 2012 it is planned to drill approximately 10,000m at Pakrut of which 8,000m will be at the deeper levels and approximately 2,500m each at Eastern Pakrut and in the Rufigar area.

Craig Brown, Managing Director of Kryso, commented:

"We are delighted to report these excellent drilling results which once again demonstrate the huge potential for expanding the resource at Pakrut. We are also encouraged by the continuing eastward extension of the lower levels of Ore Zone 1 and by the consistency of thickness and grade which supports all of the previous drilling results from all of the Pakrut ore zones. The results further support our belief that Pakrut will develop into a significant underground gold mining operation and give us added confidence for the future. Kryso is also encouraged by the potential resources at both the Rufigar prospects and at Eastern Pakrut."

Table 1. Assay results of drilling in 2011 from INTERTEK laboratory
BHID From (m) To (m) Interval (m) True widths (m) Grade (g/t Au) Northings Eastings Azimuth Dip

Pakrut deposit

Ore Zone 1
PKDD103 701.1 710.1 9.00 4.65 5.59 71401.35 62995.49 176 76.8
PKDD143 450.9 482.4 31.50 27.13 10.59 71306.74 63058.87 183.1 65
PKDD143 527.4 528.9 1.50 1.12 6.98 71306.74 63058.87 183.1 65
PKDD148 720.0 725.5 5.50 3.15 3.50 71306.75 63059.64 182.2 78.5
Ore Zone 2
PKDD135 394.3 401.8 7.50 4.18 3.42 71697.75 62779.27 180 70
PKDD135 442.3 443.8 1.50 1.06 1.10 71697.75 62779.27 180 70
PKDD135 547.3 548.8 1.50 0.92 4.52 71697.75 62779.27 180 70
PKDD139 263.7 265.2 1.50 1.12 1.64 71191.43 63062.52 250 65
PKDD140 258.9 261.9 3.00 1.92 2.98 71191.72 63062.58 250 75
PKDD140 276.6 277.8 1.50 0.63 8.06 71191.72 63062.58 250 75
PKDD140 285.6 286.5 0.90 0.45 8.21 71191.72 63062.58 250 75
PKDD152a 828.5 832.8 4.30 2.89 3.55 71336.04 62997.12 250 80
Ore Zone 3
PKDD135 265.3 275.8 10.50 5.24 3.27 71697.75 62779.27 180 70
PKDD135 281.8 289.3 7.50 4.62 1.23 71697.75 62779.27 180 70
PKDD135 298.3 299.8 1.50 1.11 2.16 71697.75 62779.27 180 70
PKDD135 346.3 347.8 1.50 1.13 1.30 71697.75 62779.27 180 70
PKDD139 121.3 149.8 28.50 18.85 7.47 71191.43 63062.52 250 65
PKDD140 159.9 162.9 3.00 1.02 2.62 71191.72 63062.58 250 75
PKDD140 195.9 197.4 1.50 1.03 1.98 71191.72 63062.58 250 75
PKDD140 215.4 221.4 6.00 3.73 1.95 71191.72 63062.58 250 75
PKDD140 234.9 237.9 3.00 1.87 1.60 71191.72 63062.58 250 75
PKDD143 357.9 359.4 4.50 2.19 1.09 71306.74 63058.87 183.1 65
PKDD143 399.9 401.4 1.50 0.91 2.00 71306.74 63058.87 183.1 65
PKDD143 417.7 418.5 1.50 0.93 2.36 71306.74 63058.87 183.1 65
PKDD147 235.6 236.4 0.80 0.43 4.48 71259.43 63090.06 180.7 77
PKDD148 388.0 391.6 3.60 1.39 2.07 71306.75 63059.64 182.2 78.5
PKDD148 469.0 471.4 2.40 1.63 3.16 71306.75 63059.64 182.2 78.5
PKDD152a 358.0 359.5 1.50 1.23 1.94 71336.04 62997.12 250 80
PKDD152a 568.0 569.5 1.50 0.92 1.44 71336.04 62997.12 250 80
PKDD152a 583.0 588.0 5.00 3.01 1.37 71336.04 62997.12 250 80
Ore Zone 6
PKDD143 77.4 78.9 1.50 1.04 1.34 71306.74 63058.87 183.1 65
PKDD143 81.9 83.4 1.50 1.14 1.78 71306.74 63058.87 183.1 65
PKDD147 27.8 32.3 4.50 3.54 2.18 71259.43 63090.06 180.7 77
PKDD148 26.5 31.0 4.50 3.09 1.27 71306.75 63059.64 182.2 78.5
PKDD148 190.0 191.5 1.50 1.03 7.50 71306.75 63059.64 182.2 78.5
PKDD148 200.5 211 10.50 6.53 12.08 71306.75 63059.64 182.2 78.5
PKDD152a 0.0 6.0 6.00 3.01 5.29 71336.04 62997.12 250 80
PKDD152a 20.5 23.5 3.00 1.56 5.13 71336.04 62997.12 250 80
Ore Zone7
PKDD122 172.8 175 2.20 1.58 0.83 71697.75 62779.27 180 70
Area Eastern Pakrut
Ore Zone 14
EPKDD112 146.4 156.9 10.5 8.47 1.40 73932.15 62825.92 205 68
EPKDD118 346.0 350.5 4.50 2.32 1.03 73956.39 62889.40 205 86
EPKDD118 356.5 359.5 3.00 1.68 1.06 73956.39 62889.40 205 86
Ore Zone15
EPKDD118 29.6 37.1 7.50 4.12 0.56 73956.39 62889.40 205 86
Area Central Rufigar
Ore Zone 1
CRDD1 13.2 16.2 3.00 2.32 0.76 72278.47 67020.93 324.5 72.3
CRDD1 40.8 43.2 2.40 1.97 0.56 73956.39 62889.40 324.5 72.3
CRDD2 68.7 71.7 3.00 2.39 1.20 73956.39 62889.40 338.9 77.6
Ore Zone 2
CRDD5 61.5 63 1.50 1.39 2.66 72400.75 67135.06 324.4 80.8
CRDD6 163.5 184.5 21.0 14.07 3.11 72424.26 67084.69 331.8 83.3
CRDD7 295.0 298.0 3.00 2.16 0.96 72467.25 67012.54 320.0 82.0
CRDD7 299.5 301.0 1.50 1.18 1.34 72467.25 67012.54 320.0 82.0
Ore Zone 3
CRDD7 160.1 161.5 1.40 0.93 0.58 72467.25 67012.54 320.0 82.0
CRDD7 205.6 208.1 2.50 1.98 0.84 72467.25 67012.54 320.0 82.0
CRDD7 209.6 210.4 0.80 0.44 0.78 72467.25 67012.54 320.0 82.0
Area Upper Rufigar
Ore Zone 1
URDD3 26.8 28.3 1.50 1.43 3.06 72519.46 66105.42 335.0 65.0
URDD3 52.3 55.3 3.00 2.93 1.45 72519.46 66105.42 335.0 65.0
URDD3 88.3 91.3 3.00 2.95 0.75 72519.46 66105.42 335.0 65.0
URDD3 119.8 121.3 1.50 1.47 1.72 72519.46 66105.42 335.0 65.0
URDD3a 60.7 66.7 6.00 5.98 2.31 72518.32 66105.22 328.9 65.9
URDD4 73.3 76.3 3.00 2.85 2.73 72519.53 66104.82 0.00 90.0
URDD4 106.3 107.8 1.50 1.40 0.86 72519.53 66104.82 0.00 90.0
URDD5 37.2 40.2 3.00 2.69 0.91 72456.2 66092.16 330.0 68.0
URDD5 46.2 47.7 1.50 1.39 0.77 72456.2 66092.16 330.0 68.0
URDD5 67.2 74.7 7.50 7.12 0.89 72456.2 66092.16 330.0 68.0
Ore Zone 2
URDD2 74 79.3 5.30 4.63 2.35 72299.63 66961.17 0.00 90.0
Area Eastern Rufigar
Ore Zone 3
ERDD4 31.2 34.2 3.00 2.85 0.94 74216.35 68001.53 0.0 50.0
ERDD4 40.2 41.7 1.50 1.36 0.80 74216.35 68001.53 0.0 50.0

Table 2

Assay Results from INTERTEK laboratory of bulldozer cuts and road sampling

BHID From (m) To (m) Interval (m) True widths (m) Grade (g/t Au)
Area Eastern Pakrut
Ore Zone 14
Road 3 127.0 131.0 4.0 3.12 1.77
Road 4 97.0 108.0 11.0 9.5 4.56
Road 5 0.5 2.0 1.5 1.38 3.94
Area Upper Rufigar
Ore Zone 1
Bulldozer cut 1 6.0 9.0 3.0 2.92 5.72
Cross cat 1 14.0 16.0 2.0 1.89 2.39
Cross cat 4 7.0 8.5 1.5 1.42 3.12
Ore Zone 2
Cross cat 4 68.0 70.0 2.0 1.92 17.49
Ore Zone 3
Cross cat 3 5.0 8.0 3.0 2.94 2.81
Table 3. Drill holes depths 2011
BHID Total Depth (m)
Pakrut deposit
1 PKDD103 755.5
2 PKDD105 245.4
3 PKDD122 280.0
4 PKDD135 311.0
5 PKDD140 340.0
6 PKDD142 104.5
7 PKDD143 590.5
8 PKDD147 293.3
9 PKDD147a 14.5
10 PKDD148 786.0
11 PKDD152 116.5
12 PKDD152a 850.0
13 PKDD156 172.0
14 Geotechnical

GT-02

122.7
15 GT-04 202.1
16 GT-05 55.2
Total: 5239.2
Area Eastern Pakrut
17 EPKDD109 157.0
18 EPKDD109a 82.5
19 EPKDD112 186.9
20 EPKDD114 170.8
21 EPKDD118 395.5
22 EPKDD155 170.6
23 EPKDD155a 43.3
Total: 1206.6
Area Rufigar
24 CRDD1 101.1
25 CRDD2 214.2
26 CRDD5 133.5
27 CRDD6 184.5
28 CRDD7 347.5
29 URDD1 257.6
30 URDD2 287.7
31 URDD3 121.3
32 URDD3a 78.2
33 URDD4 178.3
34 URDD5 109.2
35 ERDD4 52.2
Total: 2065.9
Area of tailings dam
36 GT-07 84.3
37 GT-08 103.3
38 GT-09 80.1
39 GT-10 80.5
40 GT-11 31.7
41 GT-12 17.7
Total: 397.6

For further information please visit the Company's website (www.kryso.com) or contact:

Kryso Resources PLCCraig Brown, Managing DirectorTel: +44 (0) 20 7349 9160Anthony Schindler, Investor RelationsMobile: +44 (0) 7710 178 928

Investec Investment BankingJeremy Ellis, Chris Sim, Neil ElliotTel: +44 (0)20 7597 5970

XCAP Securities plcJohn Grant / Jon Belliss Tel: +44 (0) 207 101 7070

Walbrook PRLouise Mason Tel: +44 (0)20 7933 8780

About the Pakrut Gold Project

The Pakrut gold project, of which Kryso has 100% ownership, is situated in Tajikistan approximately 112km northeast of the capital city Dushanbe Pakrut has estimated total JORC compliant resources of 3,578,000oz Au (assuming a cut-off grade of 0.0 g/t Au) and is located within the Tien Shan gold belt, which extends from Uzbekistan into Tajikistan, Kyrgyzstan and western China, and which hosts a number of multi-million ounce gold deposits.

About Tajikistan

Tajikistan is a secular republic located in Central Asia. The country is a member of the Commonwealth of Independent States (CIS) and the Shanghai Cooperation Organisation. Tajikistan hosts numerous operating precious metal mines as well as the largest aluminium smelter in Central Asia. Kryso's management team has extensive experience in the mining industry in Tajikistan.

Qualified Person

All geological results have been approved for release by Dr Trevor Davenport B.Sc, M.Sc, Ph.D, MIMM, C.Eng, Geological Consultant to Kryso Resources plc. Dr Davenport has more than 35 years of experience in the mining industry and has consented to the inclusion of the material in the form and context in which it appears.

Glossary

Au: The chemical symbol for gold.

Cut-off grade: The grade used to separate ore and waste such that only material classified as ore will be treated in order to recover the economic metal or mineral of interest.

g/t: grams per tonne.

JORC Code: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

m: metre.

oz: troy ounce.

Resource: An estimated tonnage and grade of mineralization in the ground.

t: metric ton.

Copyright Business Wire 2012

Date   Source Headline
20th Apr 20153:28 pmBUSResignation of Non-Executive Chairman and Director
16th Apr 20157:00 amBUSOperational Update
31st Mar 20155:13 pmBUSChange of Adviser
19th Mar 20157:00 amBUSIssue of Equity
18th Feb 20157:00 amBUSDirectors' Dealings
17th Feb 20157:00 amBUSDirectors' Dealings
9th Feb 20157:00 amBUSOperational Update
28th Jan 20152:06 pmBUSHong Kong Listing Update
19th Jan 20157:00 amBUSDirectors' Dealings
6th Jan 20151:04 pmBUSHong Kong Listing Update
6th Nov 20144:40 pmRNSSecond Price Monitoring Extn
6th Nov 20144:35 pmRNSPrice Monitoring Extension
28th Oct 20141:13 pmBUSResult of AGM
6th Oct 20147:00 amBUSChina Nonferrous Gold Limited Notice of AGM, Proposals in Relation to Hong Kong Listing and Posting of Delisting Circular
2nd Oct 20143:55 pmBUSIssue of Equity
10th Sep 20142:11 pmBUSInterim Results for the Six-Month Period Ended 30 June 2014
10th Sep 20141:38 pmBUSFiling of Application Proof Prospectus and Update
2nd Sep 20143:23 pmBUSAward of Consultancy Contracts
7th Aug 20141:57 pmBUSHKEx Listing Update
30th Jun 20147:00 amBUSFinal Results
27th Jun 20149:10 amBUSExternal Power Supply Construction Contract
24th Jun 20141:59 pmBUSMine Construction Agreement
13th Jun 20149:43 amBUSDirectorate Change
12th May 20141:54 pmBUSTermination of Option
17th Apr 201411:59 amBUSExploration Licence
9th Apr 20147:00 amBUSIssue of Shares
11th Mar 20147:00 amBUSOperational Update
7th Mar 201412:15 pmBUSResult of Meeting
17th Feb 20147:00 amBUSPosting of Circular
18th Dec 20137:00 amBUSGrant of Options
21st Nov 20137:00 amBUSChange of Name Update
1st Nov 20137:00 amBUSChange of Name Update
29th Oct 20131:27 pmBUSResult of General Meeting and Change of Name
28th Oct 20137:00 amBUSAppointment of Sponsor for Proposed Hong Kong Listing
11th Oct 20139:19 amBUSChange of Name, Notice of General Meeting
30th Sep 20132:55 pmBUSProposed Change of Name and Board Changes
27th Sep 20137:00 amBUSInterim Results for the Six-Month Period Ended 30 June 2013
14th Aug 201310:43 amBUSAWARD OF CONTRACTS FOR FLOTATION CELLS, CRUSHERS AND BALL MILLS - Replacement
14th Aug 20139:35 amBUSMiscellaneous
8th Aug 201310:13 amBUSAWARD OF EXTERNAL POWER SUPPLY CONSTRUCTION CONTRACT
31st Jul 20138:00 amBUSAdmission to Trading on AIM
30th Jul 201312:56 pmBUSCourt Sanction of Scheme
30th Jul 20137:30 amRNSSuspension - Kryso Resources Plc
29th Jul 20139:53 amBUSTemporary Suspension
1st Jul 20137:00 amBUSResult of AGM
17th Jun 20137:00 amBUSSRK’s Independent Technical Report Endorses Updated BFS Compiled by BGRIMM
7th Jun 20135:10 pmBUSFinal Results
24th May 20131:18 pmBUSResults of Voting at Court Meeting and General Meeting
20th May 20131:55 pmBUSHolding(s) in Company
8th May 20137:36 amBUSIntroduction of a New Aim-Listed Holding Company, Incorporated in the Cayman Islands

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.