Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update Goudron Field well GY-678, Trinidad

19 Oct 2015 07:00

RNS Number : 6104C
LGO Energy PLC
19 October 2015
 

For Immediate Release, 7am

19 October 2015

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Update Goudron Field well GY-678, Trinidad

 

LGO Energy plc (LSE AIM: LGO) today provides an update on its recently drilled well GY-678. In the interim statement released on 18 September 2015, the Company reported a mechanical problem had been encountered with well GY-678, the last of its seven planned wells in 2015 to the C-Sand formation. The Company attempted to recover the downhole equipment which was causing an obstruction below the 9 5/8-inch casing, however, without success. Consequently a cement plug has now been set in the surface casing of the well and the rig has been released, pending a decision on possible re-entry and sidetracking, or re-drilling, to reach the extensive C-sand net oil pay zone previously drilled and logged in the well.

 

This mechanical loss has significant cost implications for the Company, as in addition to the cost of the well and the unsuccessful recovery attempts totaling approximately US$1.9 million, the Company is potentially liable for the cost of the lost downhole equipment of approximately US$1.5 million.

 

As previously reported, the net oil pay observed in GY-678 was exceptionally thick. The loss of anticipated production from this well has had a negative impact on the Group's cash flow forecasts to the extent that the liquidity ratios as specified in the Group's banking arrangements with BNP Paribas ("Bank") have dropped below those originally envisaged in the covenants associated with the loan.

 

The Company is currently reviewing various options in constructive discussions with the Bank, however, in the meantime the Bank have indicated that no further amounts can be drawn against the facility. Currently, the Company has approximately $12 million drawn down under these banking arrangements, although due to lower oil price forecasts the repayments over the life of the loan are now expected to be less than the funds drawn. Payments under the pre-paid swap arrangements with the Bank continue to be made as initially planned.

 

Separately, the Group is continuing with the planning work for a program of activity in the Goudron Sandstone (as announced on 24 September 2015) with the benefit of the funds recently raised for that purpose. The production gained from that work, once underway, is expected to improve cash flow.

 

Neil Ritson, LGO's Chief Executive, commented:

"Stuck pipe incidents are not common and despite taking extensive precautions during the drilling of the 15 new wells, this incident, which occurred at the very end of the program, is a setback for LGO. Whilst there is no long term impact to the Company's assets and indeed the GY-678 well has shown that there is more and better C-sand reservoir than previously known, the short-term financial impact has to be managed. The Company is still planning for additional Goudron Sandstone production and will report further on its plans in the coming months."

 

 

Qualified Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 38 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

LGO Energy plc

+44 (0) 203 794 9230

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

Glossary:

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

Goudron Sandstone

sandstone reservoirs above the pre-Mayaro unconformity

pay/net pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

sidetracking

the drilling of a new well bore created from an existing well but commencing not at surface but at a depth below the surface

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDBBDGGBBBGUI
Date   Source Headline
7th Aug 20209:29 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
7th Aug 20207:30 amRNSSuspension - Columbus Energy Resources PLC
5th Aug 20204:45 pmRNSScheme sanctioned by Court
5th Aug 20209:32 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
4th Aug 202010:31 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
3rd Aug 20205:30 pmRNSBahamas Petroleum Company
3rd Aug 202010:10 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
31st Jul 202012:14 pmRNSTotal Voting Rights
31st Jul 20209:52 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
30th Jul 20209:23 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
29th Jul 20209:37 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
28th Jul 202011:41 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
27th Jul 202011:01 amRNSProposed Merger - Results of Meetings
27th Jul 20209:55 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
24th Jul 20201:10 pmRNSCorporate Update re Merger
24th Jul 202012:35 pmGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
23rd Jul 202011:54 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
23rd Jul 20207:00 amRNSRule 2.9 Announcement
22nd Jul 202012:27 pmGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
22nd Jul 20207:59 amRNSUpdate on Inniss-Trinity CO2 Project
21st Jul 20209:42 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
20th Jul 20209:45 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
17th Jul 20209:29 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
16th Jul 202010:03 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
16th Jul 20209:30 amRNSQ&A on potential merger
15th Jul 202010:09 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
14th Jul 202010:27 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
10th Jul 20209:49 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
9th Jul 20209:49 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
8th Jul 20209:54 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
6th Jul 202010:22 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
3rd Jul 20209:30 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
2nd Jul 20205:49 pmRNSForm 8.3 - Columbus Energy Resources plc
2nd Jul 20202:45 pmRNSInterim extension for Goudron field
2nd Jul 202010:02 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
1st Jul 20204:24 pmGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
1st Jul 20207:00 amRNSPosting of Scheme Document
1st Jul 20207:00 amRNSForm 8.3 - Columbus Energy Resources plc
30th Jun 20202:26 pmRNSCorporate Update and Total Voting Rights
30th Jun 202010:01 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
30th Jun 20207:00 amRNSForm 8.3 - Columbus Energy Resources plc
29th Jun 20207:00 amRNSForm 8.3 - [Columbus Energy Resources plc]
26th Jun 20202:15 pmRNSForm 8.3 - Columbus Energy
26th Jun 20207:00 amRNSForm 8.3 - Columbus Energy Resources plc
25th Jun 202010:48 amRNSForm 8.3 - Columbus Energy Resources PLC
25th Jun 202010:01 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
25th Jun 20208:00 amRNSRule 2.9 Announcement
24th Jun 20209:57 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
23rd Jun 20205:25 pmRNSForm 8.3 - Columbus Energy
23rd Jun 20209:49 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.