Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update

6 Jul 2015 07:00

RNS Number : 2060S
LGO Energy PLC
06 July 2015
Β 

For Immediate Release, 7am

6 July 2015

Β 

LGO ENERGY PLC

("LGO" or the "Company")

Β 

Goudron Drilling Update, Trinidad

Β 

LGO is today pleased to announce that its latest development well, GY-675, at its flagship Goudron Field development in Trinidad, reached total depth at 3,660 feet measured depth ("MD") on 30 June 2014. Electric log interpretation from both the Goudron Sandstone and C-sand intervals confirm the presence of recoverable hydrocarbons with the net hydrocarbon pay in the C-sand main target estimated as 260 feet. The next well, GY-676, in the 2015 program has now been spudded.

Β 

Neil Ritson, LGO's Chief Executive, commented:

"Our C-sand drilling program at Goudron is progressing extremely well and we are now on our fifth well in 2015. In parallel, the production testing of the first three wells drilled this year is providing some encouraging results and we hope to have final flow rates from that work shortly. Additionally the recently published reserves assessment shows we have significant upside to pursue after the current seven well drilling campaign."

Β 

Well GY-675 is the fourth of seven wells currently planned for 2015 and the first well from drilling Pad 5 in the north-east of the field. Net oil pay in the Goudron Sandstone was encountered between 630 and 1,560 feet with an estimated 330 feet of total net pay. The oil bearing C-sand interval was encountered between 2,015 and 3,020 feet MD. Net hydrocarbon bearing pay in the C-sand interval is estimated as 260 feet. These observed net pay zones are in line with expectations for this well.

Β 

Well GY-675 has now been successfully cased for future production and the rig has been moved to the second location on Pad 5 where it has spudded the fifth well of the 2015 program, GY-676, which is planned to be drilled to a total depth of 3,640 feet MD (3,400 feet TVDss) at a location 325 feet north-west of the surface location. Well GY-676 is once again targeting a C-sand reservoir interval and the top Gros Morne sandstone reservoir (upper C-sand) is anticipated at 1,935 feet MD (1,700 feet TVDss).

Β 

Qualified Person's Statement:

Β 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Β 

Enquiries:

LGO Energy plc

+44 (0) 203 794 9230

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

Β 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

Β 

Glossary:

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

MD

measured depth; the depth of a well measured along the length of the borehole

TD

total depth

TVDss

true vertical depth; the depth of a well projected on to a vertical line below the surface location and corrected to a sea level datum

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLGMGGNMKZGKZZ
Date   Source Headline
18th Sep 20157:00 amRNSUnaudited Interim Results
7th Sep 201510:30 amRNSDrilling update, Trinidad
28th Aug 20159:00 amRNSInitial production rates Pad-5, Goudron
21st Aug 20157:00 amRNSSPA signed in 2014, Tabaquite Block, Trinidad
20th Aug 20157:00 amRNSInitial Production Rate Well GY-675, Goudron Field
17th Aug 20157:00 amRNSDrilling Update, Trinidad
12th Aug 20157:00 amRNSDrilling Update, Trinidad
6th Aug 20153:06 pmRNSTotal Voting Rights
29th Jul 20157:01 amRNSOperational Update
16th Jul 201510:17 amRNSGoudron Pad 4 Testing Update, Trinidad
9th Jul 201510:01 amRNSCedros Peninsula Update, Trinidad
7th Jul 20151:42 pmRNSResult of AGM
6th Jul 20157:00 amRNSGoudron Drilling Update
29th Jun 20157:00 amRNSGoudron Pad 4 Testing
24th Jun 20157:00 amRNSUpgraded Resource Assessment, Trinidad
17th Jun 20157:00 amRNSGoudron Pad 4 Testing and Infrastructure
15th Jun 201510:44 amRNSGoudron Pad 5 Drilling Update, Trinidad
11th Jun 20159:46 amRNSGoudron Drilling Update, Trinidad
2nd Jun 20157:00 amRNSReport and Accounts and Notice of AGM
28th May 20159:23 amRNSChange of Registered Office
22nd May 20157:00 amRNSGoudron Drilling Update, Trinidad
30th Apr 20158:00 amRNSGoudron Drilling and Field Update
15th Apr 20157:00 amRNSGoudron Drilling and Field Update
31st Mar 20154:18 pmRNSTotal Voting Rights
17th Mar 201510:13 amRNSUS$11.78 million drawn, and Goudron Field update
24th Feb 20158:00 amRNSIssue of Debt
24th Feb 20157:37 amRNSIssue of Equity
23rd Feb 20154:56 pmRNSProposed placing to raise at least £4m (US$6m)
19th Feb 201510:01 amRNSFTG Survey Completion
18th Feb 20159:46 amRNSGoudron Operational Update
26th Jan 201510:00 amRNSFlow rate of well GY-669 and Goudron Field update
15th Jan 20157:00 amRNS£1 million raised for Goudron, and Cedros update
6th Jan 20157:00 amRNSGroup Production and Goudron Field Update
5th Jan 20157:00 amRNSAppointment of Joint Broker
31st Dec 20148:00 amRNSTotal Voting Rights
22nd Dec 20147:00 amRNSBoard appointment
15th Dec 20147:00 amRNSFlow rate of Goudron well GY-670 exceeds 1,000bopd
8th Dec 20147:00 amRNSDrilling Update, Rig Secured and CPR Commissioned
4th Dec 201411:18 amRNSGroup Production Update
1st Dec 20148:00 amRNSDirector Option Awards and Share Issue
27th Nov 20149:47 amRNSAgreement to acquire BOLT deep rights
24th Nov 20147:00 amRNSGoudron Drilling and Production Update, Trinidad
19th Nov 20147:00 amRNSGoudron Drilling Update, Trinidad
11th Nov 201410:59 amRNSReplacement: Goudron Drilling Update
11th Nov 20147:00 amRNSGoudron Drilling Update
4th Nov 20142:25 pmRNSChange of Name
30th Oct 20146:17 pmRNS£2.3 million raised for Cedros, Trinidad
30th Oct 20149:48 amRNSSurvey and Cedros Update, Trinidad
29th Oct 20149:46 amRNSGoudron Drilling Update
20th Oct 201410:47 amRNSGoudron Drilling Update, GY-669

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.