Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update

6 Jul 2015 07:00

RNS Number : 2060S
LGO Energy PLC
06 July 2015
 

For Immediate Release, 7am

6 July 2015

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Drilling Update, Trinidad

 

LGO is today pleased to announce that its latest development well, GY-675, at its flagship Goudron Field development in Trinidad, reached total depth at 3,660 feet measured depth ("MD") on 30 June 2014. Electric log interpretation from both the Goudron Sandstone and C-sand intervals confirm the presence of recoverable hydrocarbons with the net hydrocarbon pay in the C-sand main target estimated as 260 feet. The next well, GY-676, in the 2015 program has now been spudded.

 

Neil Ritson, LGO's Chief Executive, commented:

"Our C-sand drilling program at Goudron is progressing extremely well and we are now on our fifth well in 2015. In parallel, the production testing of the first three wells drilled this year is providing some encouraging results and we hope to have final flow rates from that work shortly. Additionally the recently published reserves assessment shows we have significant upside to pursue after the current seven well drilling campaign."

 

Well GY-675 is the fourth of seven wells currently planned for 2015 and the first well from drilling Pad 5 in the north-east of the field. Net oil pay in the Goudron Sandstone was encountered between 630 and 1,560 feet with an estimated 330 feet of total net pay. The oil bearing C-sand interval was encountered between 2,015 and 3,020 feet MD. Net hydrocarbon bearing pay in the C-sand interval is estimated as 260 feet. These observed net pay zones are in line with expectations for this well.

 

Well GY-675 has now been successfully cased for future production and the rig has been moved to the second location on Pad 5 where it has spudded the fifth well of the 2015 program, GY-676, which is planned to be drilled to a total depth of 3,640 feet MD (3,400 feet TVDss) at a location 325 feet north-west of the surface location. Well GY-676 is once again targeting a C-sand reservoir interval and the top Gros Morne sandstone reservoir (upper C-sand) is anticipated at 1,935 feet MD (1,700 feet TVDss).

 

Qualified Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

LGO Energy plc

+44 (0) 203 794 9230

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

 

Glossary:

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

MD

measured depth; the depth of a well measured along the length of the borehole

TD

total depth

TVDss

true vertical depth; the depth of a well projected on to a vertical line below the surface location and corrected to a sea level datum

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGMGGNMKZGKZZ
Date   Source Headline
10th Oct 20147:00 amRNSGoudron Update, Trinidad
2nd Oct 20147:00 amRNSDrilling Update,Trinidad
29th Sep 201410:00 amRNSGoudron Field Update
26th Sep 20144:27 pmRNSUnaudited Interim Results to 30 June 2014
25th Sep 20141:00 pmRNSRecord Oil Production and Well Update
17th Sep 20147:00 amRNSInitial Flow Rate GY-665
8th Sep 20147:00 amRNSPresentation at Proactive Investor Forum
1st Sep 20147:00 amRNSGoudron Drilling Update, GY-668
27th Aug 20147:00 amRNSBoard Changes
21st Aug 20147:00 amRNSGoudron Drilling Update, GY-668
11th Aug 20147:00 amRNSDrilling Report
7th Aug 20147:00 amRNSDirectorate Change
4th Aug 20147:34 amRNSGoudron Drilling Update
31st Jul 201411:56 amRNSTotal Voting Rights
31st Jul 20149:02 amRNSGoudron Well GY-667 Reaches Total Depth
31st Jul 20147:00 amRNSSettlement of Litigation Costs
22nd Jul 20147:00 amRNSGoudron Drilling Update
17th Jul 20147:00 amRNSLGO raises £7 million
16th Jul 20147:00 amRNSPotential Acquisition of Producing Oil Field
11th Jul 20147:00 amRNSGoudron Drilling and Infrastructure Update
7th Jul 20146:18 pmRNSExercise of Warrants and Total Voting Rights
7th Jul 20142:32 pmRNSResult of AGM
3rd Jul 20147:00 amRNSGoudron Well GY-666 Reaches Total Depth
30th Jun 20142:33 pmRNSTotal Voting Rights
24th Jun 20147:11 amRNSGoudron Drilling Update
19th Jun 20145:10 pmRNSAnnual Financial Report - Replacement
17th Jun 20146:20 pmRNSExercise of Warrants and Total Voting Rights
17th Jun 20147:00 amRNSGoudron Development Drilling Update
13th Jun 20144:38 pmRNSAnnual Financial Report
11th Jun 201412:42 pmRNSGoudron Drilling Update
9th Jun 20147:00 amRNSGoudron Drilling Update
4th Jun 20149:34 amRNSTalks on potential partnership in Spain terminated
3rd Jun 20143:03 pmRNSLGO Fully Closes YAGM Equity Swap
3rd Jun 201411:47 amRNSGY-665 Drilling Update
2nd Jun 201411:28 amRNSTotal Voting Rights
2nd Jun 20147:00 amRNSGY-664 Production and GY-665 Update
28th May 20147:00 amRNSGoudron Drilling Update
27th May 20148:30 amRNSReserves Clarification, Trinidad
27th May 20147:00 amRNSGoudron Update
19th May 20147:00 amRNSGoudron Development Update, Trinidad
14th May 20147:00 amRNSWell GY-664 Update, Trinidad
12th May 20147:00 amRNSProduction and Drilling Update, Trinidad
6th May 20147:01 amRNSUpdate on GY-664 Goudron, Trinidad
1st May 20147:00 amRNSDrilling Report
28th Apr 20149:31 amRNSGoudron Drilling
25th Apr 20146:19 pmRNSFunding and New Trinidad producing fields review
24th Apr 20149:00 amRNSCompany Update
17th Apr 20147:00 amRNSRig Mobilisation, Goudron Field, Trinidad
10th Apr 201412:11 pmRNSUpdate Maxim Joint Venture in Trinidad
3rd Apr 201411:48 amRNSLitigation Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.