Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Drilling Report

1 May 2014 07:00

RNS Number : 0107G
Leni Gas & Oil PLC
01 May 2014
Β 

For Immediate Release, 7 am 1 May 2014

Β 

LENI GAS AND OIL PLC

("LGO" or the "Company")

First Oil Pay in GY-664, Goudron, Trinidad

Β 

LGO is pleased to announce that the first new Goudron development well, GY-664, has already encountered oil between 571 feet and current well depth of 1,100 feet with combined pay intervals so far of approximately 193 feet in the upper Goudron Sands. Drilling is continuing in the remaining Goudron Sands, estimated to be 400 feet thick, to the first casing point at approximately 1,540 feet, where electric logs will be run. Drilling will then continue in order to test the primary objectives in the Gros Morne and the Lower Cruse Sands at depths below 2,800 feet.

Neil Ritson, LGO Chief Executive, commented:

"The presence of oil bearing Goudron Sands, whilst expected at this location, is very encouraging and the production potential of an interval of this thickness is already well established. GY-664 will now continue to test the full extent of the Goudron Sands and then be deepened to the Gros Morne and Lower Cruse in order to confirm significant additional reservoir potential. This is an excellent start as we begin to unlock the 122 million barrels of proven and probable oil still in the field."

Drilling Update: GY-664

GY-664 is the first well of an approved 30 well development programme on the Company's 100% Goudron Field in Trinidad, which has independently verified proven and probable ("2P") original oil in place of 126 million barrels ("mmbbls") of which only approximately 4 mmbbls have been recovered to date. In place 2P oil resources assigned by Challenge Energy in their 2012 independent report totalled 72 mmbbls in the Goudron Sands and a further 54 mmbbls in the Lower Cruse.

To date the Goudron Field has been developed through a total of 154 wells drilled between 1927 and 1982 of which about 128 have given material production at either the Goudron or Lower Cruse levels, or both. Only 11 wells have previously been completed at the Lower Cruse reservoir and these have achieved an average production of 63,200 barrels per well. A total of 1.64 mmbbls have been recovered from the Lower Cruse, representing a very modest recovery factor of just 3%.

No wells have been drilled at Goudron since 1982 and wells drilled prior to that date did not benefit from modern instrumentation and mud conditioning techniques and this invariably, in the past, led to significant formation damage and resulting reduced production potential. It is expected that the drilling practices and perforating guns, being employed during the present campaign, will provide far better production performance.

The GY-664 well is scheduled to be drilled to a total depth of approximately 4,000 feet and the Company will provide additional information as it becomes available.

Β 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Β 

Glossary:

Β 

Probable Reserves (P2)

Β 

those additional reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus Probable Reserves

Proven Reserves (P1)

those quantities of petroleum, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations

Β 

The estimates provide in this statement are based on the Petroleum Resources Management System ("PRMS") published by the Society of Petroleum Engineers ("SPE") and are reported consistent with the SPE's 2011 guidelines. All definitions used in this announcement have the meaning given to them in the PRMS.

Enquiries:

Leni Gas & Oil plc

David Lenigas

Neil Ritson

+44 (0) 20 7440 0645

Β 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

Β 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

Β 

Bell Pottinger

Financial PR

Mark Antelme

+44 (0) 20 7861 3232

Henry Lerwill

Β 

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLSDWEESFLSESL
Date   Source Headline
18th Sep 20157:00 amRNSUnaudited Interim Results
7th Sep 201510:30 amRNSDrilling update, Trinidad
28th Aug 20159:00 amRNSInitial production rates Pad-5, Goudron
21st Aug 20157:00 amRNSSPA signed in 2014, Tabaquite Block, Trinidad
20th Aug 20157:00 amRNSInitial Production Rate Well GY-675, Goudron Field
17th Aug 20157:00 amRNSDrilling Update, Trinidad
12th Aug 20157:00 amRNSDrilling Update, Trinidad
6th Aug 20153:06 pmRNSTotal Voting Rights
29th Jul 20157:01 amRNSOperational Update
16th Jul 201510:17 amRNSGoudron Pad 4 Testing Update, Trinidad
9th Jul 201510:01 amRNSCedros Peninsula Update, Trinidad
7th Jul 20151:42 pmRNSResult of AGM
6th Jul 20157:00 amRNSGoudron Drilling Update
29th Jun 20157:00 amRNSGoudron Pad 4 Testing
24th Jun 20157:00 amRNSUpgraded Resource Assessment, Trinidad
17th Jun 20157:00 amRNSGoudron Pad 4 Testing and Infrastructure
15th Jun 201510:44 amRNSGoudron Pad 5 Drilling Update, Trinidad
11th Jun 20159:46 amRNSGoudron Drilling Update, Trinidad
2nd Jun 20157:00 amRNSReport and Accounts and Notice of AGM
28th May 20159:23 amRNSChange of Registered Office
22nd May 20157:00 amRNSGoudron Drilling Update, Trinidad
30th Apr 20158:00 amRNSGoudron Drilling and Field Update
15th Apr 20157:00 amRNSGoudron Drilling and Field Update
31st Mar 20154:18 pmRNSTotal Voting Rights
17th Mar 201510:13 amRNSUS$11.78 million drawn, and Goudron Field update
24th Feb 20158:00 amRNSIssue of Debt
24th Feb 20157:37 amRNSIssue of Equity
23rd Feb 20154:56 pmRNSProposed placing to raise at least £4m (US$6m)
19th Feb 201510:01 amRNSFTG Survey Completion
18th Feb 20159:46 amRNSGoudron Operational Update
26th Jan 201510:00 amRNSFlow rate of well GY-669 and Goudron Field update
15th Jan 20157:00 amRNS£1 million raised for Goudron, and Cedros update
6th Jan 20157:00 amRNSGroup Production and Goudron Field Update
5th Jan 20157:00 amRNSAppointment of Joint Broker
31st Dec 20148:00 amRNSTotal Voting Rights
22nd Dec 20147:00 amRNSBoard appointment
15th Dec 20147:00 amRNSFlow rate of Goudron well GY-670 exceeds 1,000bopd
8th Dec 20147:00 amRNSDrilling Update, Rig Secured and CPR Commissioned
4th Dec 201411:18 amRNSGroup Production Update
1st Dec 20148:00 amRNSDirector Option Awards and Share Issue
27th Nov 20149:47 amRNSAgreement to acquire BOLT deep rights
24th Nov 20147:00 amRNSGoudron Drilling and Production Update, Trinidad
19th Nov 20147:00 amRNSGoudron Drilling Update, Trinidad
11th Nov 201410:59 amRNSReplacement: Goudron Drilling Update
11th Nov 20147:00 amRNSGoudron Drilling Update
4th Nov 20142:25 pmRNSChange of Name
30th Oct 20146:17 pmRNS£2.3 million raised for Cedros, Trinidad
30th Oct 20149:48 amRNSSurvey and Cedros Update, Trinidad
29th Oct 20149:46 amRNSGoudron Drilling Update
20th Oct 201410:47 amRNSGoudron Drilling Update, GY-669

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.