Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Drilling Report

1 May 2014 07:00

RNS Number : 0107G
Leni Gas & Oil PLC
01 May 2014
 

For Immediate Release, 7 am 1 May 2014

 

LENI GAS AND OIL PLC

("LGO" or the "Company")

First Oil Pay in GY-664, Goudron, Trinidad

 

LGO is pleased to announce that the first new Goudron development well, GY-664, has already encountered oil between 571 feet and current well depth of 1,100 feet with combined pay intervals so far of approximately 193 feet in the upper Goudron Sands. Drilling is continuing in the remaining Goudron Sands, estimated to be 400 feet thick, to the first casing point at approximately 1,540 feet, where electric logs will be run. Drilling will then continue in order to test the primary objectives in the Gros Morne and the Lower Cruse Sands at depths below 2,800 feet.

Neil Ritson, LGO Chief Executive, commented:

"The presence of oil bearing Goudron Sands, whilst expected at this location, is very encouraging and the production potential of an interval of this thickness is already well established. GY-664 will now continue to test the full extent of the Goudron Sands and then be deepened to the Gros Morne and Lower Cruse in order to confirm significant additional reservoir potential. This is an excellent start as we begin to unlock the 122 million barrels of proven and probable oil still in the field."

Drilling Update: GY-664

GY-664 is the first well of an approved 30 well development programme on the Company's 100% Goudron Field in Trinidad, which has independently verified proven and probable ("2P") original oil in place of 126 million barrels ("mmbbls") of which only approximately 4 mmbbls have been recovered to date. In place 2P oil resources assigned by Challenge Energy in their 2012 independent report totalled 72 mmbbls in the Goudron Sands and a further 54 mmbbls in the Lower Cruse.

To date the Goudron Field has been developed through a total of 154 wells drilled between 1927 and 1982 of which about 128 have given material production at either the Goudron or Lower Cruse levels, or both. Only 11 wells have previously been completed at the Lower Cruse reservoir and these have achieved an average production of 63,200 barrels per well. A total of 1.64 mmbbls have been recovered from the Lower Cruse, representing a very modest recovery factor of just 3%.

No wells have been drilled at Goudron since 1982 and wells drilled prior to that date did not benefit from modern instrumentation and mud conditioning techniques and this invariably, in the past, led to significant formation damage and resulting reduced production potential. It is expected that the drilling practices and perforating guns, being employed during the present campaign, will provide far better production performance.

The GY-664 well is scheduled to be drilled to a total depth of approximately 4,000 feet and the Company will provide additional information as it becomes available.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Glossary:

 

Probable Reserves (P2)

 

those additional reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus Probable Reserves

Proven Reserves (P1)

those quantities of petroleum, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations

 

The estimates provide in this statement are based on the Petroleum Resources Management System ("PRMS") published by the Society of Petroleum Engineers ("SPE") and are reported consistent with the SPE's 2011 guidelines. All definitions used in this announcement have the meaning given to them in the PRMS.

Enquiries:

Leni Gas & Oil plc

David Lenigas

Neil Ritson

+44 (0) 20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Bell Pottinger

Financial PR

Mark Antelme

+44 (0) 20 7861 3232

Henry Lerwill

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSDWEESFLSESL
Date   Source Headline
15th Oct 20187:00 amRNSConditional placing to raise £2.5m
12th Oct 20184:46 pmRNSHolding(s) in Company
12th Oct 20184:22 pmRNSHolding(s) in Company
10th Oct 20187:00 amRNSBusiness, Operational and Financial Update Q3
8th Oct 20187:00 amRNSCompletion of Steeldrum Acquisition
27th Sep 20187:00 amRNSUnaudited Interim Results
10th Sep 20187:00 amRNSCory Moruga Block: Snowcap Licence Extension
6th Sep 20187:00 amRNSHolding(s) in Company
29th Aug 201810:24 amRNSPetrotin Restructuring
14th Aug 20188:34 amRNSIssue of Equity, TVR
13th Jul 20185:16 pmRNSResult of AGM
13th Jul 20187:00 amRNSAcquisition, New Convertible and Business Update
2nd Jul 20187:03 amRNSUpdate on Director remuneration and options
25th Jun 20187:00 amRNSSPA signed for 50% Interest in Icacos Field
12th Jun 20187:00 amRNSAccounts for year to 31 Dec 2017 and Notice of AGM
25th Apr 20187:00 amRNSHolding(s) in Company
16th Apr 20187:25 amRNSPotential acquisition of a 50% interest in Icacos
9th Apr 20188:25 amRNSQ1 Business, Operational and Financial Update
29th Mar 20187:00 amRNSUpdate on La Lora Concession
26th Mar 20187:00 amRNSBusiness Update - La Lora Concession in Spain
19th Mar 20187:00 amRNSRenegotiation of BOLT Transaction
22nd Feb 20187:00 amRNSBusiness update - La Lora Concession in Spain
5th Feb 20187:00 amRNSHolding(s) in Company
18th Jan 20187:00 amRNSHolding(s) in Company
17th Jan 20189:00 amRNSPrice Monitoring Extension
12th Jan 20187:00 amRNSHolding(s) in Company
27th Dec 20177:00 amRNSHolding(s) in Company
21st Dec 20177:00 amRNSOperational, Financial and Management Update
8th Nov 20174:26 pmRNSIssue of Equity and TVR
2nd Nov 20177:00 amRNSResult of Open Offer and Total Voting Rights
16th Oct 20177:00 amRNSHolding(s) in Company
16th Oct 20177:00 amRNSPosting of Open Offer Circular
10th Oct 20177:00 amRNSIssue of Equity and TVR
9th Oct 20177:00 amRNSPlacing, Subscription and Open Offer
29th Sep 20175:42 pmRNSTotal Voting Rights
19th Sep 20177:00 amRNSIssue of Equity and TVR
14th Sep 20172:10 pmRNSResult of AGM
13th Sep 20177:00 amRNSInterim Results for 6 months ended 30 June 2017
12th Sep 20177:00 amRNSGoudron Water Injection Pilot "A" - CEC issued
11th Sep 20177:00 amRNSRe-negotiation of Convertible Security Funding
1st Aug 20177:00 amRNSBoard Change, Notice of AGM and of Interim Results
10th Jul 20177:00 amRNSOperational and Business Update
15th Jun 20177:01 amRNSCompany Update
15th Jun 20177:00 amRNSDirectorate Change, Appointment of CFO
14th Jun 20174:54 pmRNSUpdate on Columbus Energy Resources plc
13th Jun 201712:34 pmRNSChange of name to Columbus Energy Resources plc
8th Jun 20172:45 pmRNSColumbus Energy Resources Launch Event
10th May 20177:00 amRNSDirectorate change, proposed company name change
5th May 20177:00 amRNSAnnual Financial Report
4th May 20177:00 amRNSInvestor Strategy Briefing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.