Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

Share Price is delayed by 15 minutes
Get Live Data
2.10    0.00 (0.00%)
Bid:
2.00
Ask:
2.20
Spread: 0.20 (10.00%)
Market Cap: £49.48m
CASP Live PriceLast checked at - London Stock Exchange

Intraday Caspian Sunrise Share Chart

BNG Operational Update

16 Sep 2010 07:00

RNS Number : 7836S
Roxi Petroleum Plc
16 September 2010
 



For immediate release 16 September 2010

 

 

Roxi Petroleum plc

BNG Operational Update

 

Roxi Petroleum ("Roxi" or "the Company"), the Central Asian oil and gas company with a focus on Kazakhstan, announces the following drilling and testing results on South Yelemes field:

 

·; Well 805 flows 226 bopd from Middle Jurassic Sandstone.

·; Confirmation of mobile hydrocarbons on Lower Cretaceous dolomites.

·; Well 806 drilled to total depth of 2557m, with likely residual oil shows.

 

BNG (Roxi Interest 23.41%)

South Yelemes

Well 805 which was drilled in June 2010, began testing operations on 5 August 2010. The well has tested two hydrocarbon bearing zones between 1965m and 2230m. From the lower zone , a stabilised flow rate of 226 barrels of 29o API oil per day was achieved on a 6mm choke from a 4m pay interval in the Middle Jurassic sandstone reservoir. Following successful flow-test and build-up, the interval was isolated and the completion string, re- set to test the overlying Lower Cretaceous Dolomites. A 9m pay interval was perforated across the dolomite section and oil was initially swabbed into the borehole. The well flowed 29o API oil, intermittently to surface. Following acidizing, enhanced inflow of oil was recorded, however no stablised flow to surface was achieved. Preliminary evaluation of the test results indicates that the interval should be capable of producing 150 barrels of oil per day on pump.

The well will now be prepared for test production of the Middle Jurassic in preparation for BNG receiving Pilot Production consent for South Yelemes.

Well 806, spudded on the 31st July 2010 to appraise the Middle Jurassic and Lower Cretaceous accumulations, has reached a total depth of 2557m. There are good oil shows over a 12m interval in the Middle Jurassic with a further 16m of possible pay in the over lying Lower Cretaceous. Preliminary log results indicate that these could be residual oil shows, and the well may not be capable of producing oil. The core and log data will be further evaluated to determine the potential for testing well 806. In the meantime, casing will be run and the SNGS ZJ-40 drilling rig will move to the well 135 pad on MJ-A (North Yelemes) prospect.

 

David Wilkes CEO commented:

"We are pleased with the confirmation of the Lower Cretaceous reservoir in well 805, which could add significant value to the project. The results of well 806 will have to be fully evaluated, following which, we will start to delineate the distribution of these reservoirs, and assign reserves, using the high quality core, log and test data we acquired in these appraisal wells"

 

 

Qualified Person

 

Duncan McDougall, Technical Director of Roxi Petroleum and a Fellow in the Geological Society, London, has reviewed and approved the technical disclosure in this announcement. He holds a BSc in Geology and has 25 years international experience of exploration, appraisal, and development of oilfields in a variety of environments

 

Enquiries

 

Roxi Petroleum plc

David Wilkes CEO +7 727 244 0920

 

Matrix Corporate Capital LLP (NOMAD and broker)

Alastair Stratton / Anu Tayal +44 203 206 7000

 

Buchanan Communications (Financial PR)

Tim Thompson / Ben Romney / Chris McMahon +44 207 466 5000

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLAMLTMBTBBTM
Date   Source Headline
18th May 20269:00 amRNSUpdate
23rd Mar 20267:00 amRNSAcquisition of Mineral Assets
13th Mar 20267:33 amRNSUpdate
13th Mar 20267:33 amRNSUpdate
3rd Mar 202611:07 amRNSFirst oil from the West Shalva Contract Area
10th Feb 20267:00 amRNSTesting at the West Shalva Contract Area
2nd Feb 20267:00 amRNSGeneral Meeting Results
28th Jan 20267:00 amRNSCompletion of the acquisition of the Block 8
7th Jan 20267:00 amRNSNotice of GM
30th Dec 20257:00 amRNSRe-issue of BNG Contract Area licences
30th Dec 20257:00 amRNSRe-issue of BNG Contract Area licences
22nd Dec 202511:15 amRNSReplacement: Acquisition of Tau-Cen
22nd Dec 202511:15 amRNSReplacement: Acquisition of Tau-Cen
22nd Dec 20257:00 amRNSAcquisition of Tau-Cen
22nd Dec 20257:00 amRNSAcquisition of Tau-Cen
4th Dec 20251:00 pmRNSPosting of Annual Report & Accounts
4th Dec 20258:32 amRNSExemption from future Historic Costs at the BNG
3rd Dec 20257:00 amRNSAward of licence at the BNG Contract Area
2nd Dec 20257:00 amRNSIssue of shares
1st Dec 20258:55 amRNSReplacement 2025 Interim Results
1st Dec 20257:30 amRNSRestoration - Caspian Sunrise Plc
1st Dec 20257:07 amRNSInterim results for six months ended 30 June 2025
1st Dec 20257:00 amRNSAnnual report for the year ended 31 December 2024
31st Oct 20257:00 amRNSGeneral update
3rd Oct 20257:00 amRNSFirst well spudded at West Shalva Contract Area
30th Sep 20254:01 pmRNSDelay to the publication of results
27th Aug 20258:43 amRNSCorporate update
26th Aug 20256:00 pmRNSSuspended Companies Notice - Deletion
23rd Jul 20258:36 amRNSUpdate regarding the sale of MJF & South Yelemes
11th Jul 20259:23 amRNSUpdate on Block 8 Well Tests
9th Jul 20257:00 amRNSUpdate regarding sale of MJF and South Yelemes
1st Jul 20257:30 amRNSSuspension - Caspian Sunrise PLC
25th Jun 202512:57 pmRNSResult of AGM and matters discussed
18th Jun 20257:00 amRNSProduction and Testing from Block 8 Contract Area
16th Jun 20257:00 amRNSGeneral Update
30th May 20257:00 amRNSNotice of AGM
23rd May 20251:21 pmRNSAward of production licence at BNG Contract Area
1st May 20257:35 amRNSCorporate Update
15th Apr 202510:20 amRNSCompletion of West Shalva acquisition
1st Apr 20257:00 amRNSUpdate on the disposal of MJF & South Yelemes
3rd Mar 20257:00 amRNSCorporate & Operational update
26th Feb 20257:00 amRNSBNG deep structures conditional funding
21st Feb 20257:00 amRNSWest Shalva update
2nd Jan 20257:00 amRNSUpdate on the disposal of MJF & South Yelemes
21st Nov 202412:43 pmRNSDisposal of the BNG shallow MJF & South Yelemes
5th Nov 20247:00 amRNSUpdate on acquisition of West Shalva Contract Area
31st Oct 20247:00 amRNSUpdate on the disposal of MJF & South Yelemes
26th Sep 202412:59 pmRNSGeneral Meeting Results
25th Sep 20247:00 amRNSInterim results for six months ended 30 June 2024
4th Sep 20247:00 amRNSDisposal of the shallow MJF & Notice of GM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.