Q1 2019 Operations Update

10 Apr 2019 07:00

RNS Number : 6836V
Central Asia Metals PLC
10 April 2019
Β 

10 April 2019

Β 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

Q1 2019 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q1 2019 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

Highlights

- Production, on track to meet full year guidance for copper, zinc and lead

o Q1 2019 Kounrad

Β§ Copper produced, 2,952 tonnes

o Q1 2019 Sasa

Β§ Zinc in concentrate produced, 5,639 tonnes

Β§ Lead in concentrate produced, 7,212 tonnes

- Preparation of updated SRK Consulting (UK) Limited ('SRK') Mineral Resource Estimate ('updated MRE') for Sasa in accordance with Joint Ore Reserves Committee ('JORC') guidelines

o Total combined Indicated and Inferred Mineral Resources of 22.5 million tonnes with a zinc grade of 2.87% and a lead grade of 4.23%, containing 646,000 tonnes of zinc and 953,000 tonnes of lead

o Despite 18 months of mining depletion since previous Mineral Resource Estimate as of 1 July 2017 ('2017 MRE'), minimal reduction in contained metal of approximately 6,000 tonnes of zinc and 7,000 tonnes of lead due to higher resource grades (informed by recent drilling programmes)

o Golema Reka deposit Indicated Mineral Resources of 1.3 million tonnes, at a zinc grade of 1.61% and a lead grade of 3.80%, converted from Inferred Mineral Resources through the successful 2018 infill drilling programme

o Resource base to support a long mine life at Sasa of at least 19 years

Β 

CAML production summary

Metal production (tonnes)

Q1 2019

Q1 2018

Copper

2,952

3,070

Zinc

5,639

5,518

Lead

7,212

7,020

Β 

Nigel Robinson, Chief Executive Officer, commented:

"These production results reflect a good start to the year at Kounrad and Sasa, both of which are on track to achieve 2019 production targets. Base metals production guidance for 2019 is 12,500 to 13,500 tonnes of copper cathode, plus 22,000 to 24,000 tonnes of zinc in concentrate and 28,000 to 30,000 tonnes of lead in concentrate.

"The updated MRE underscores our belief that in Sasa we have a long-life asset with a high-quality resource base. Since the 2017 MRE, we have, in the updated MRE, demonstrated higher overall zinc and lead grades at our current mining area of Svinja Reka. At Golema Reka, our resource was previously all within the Inferred category and we now have 1.3 million tonnes within the higher confidence Indicated category out of a total Golema Reka combined Indicated and Inferred Mineral Resource of 7.6 million tonnes.

"In 2019, we will continue to drill at Svinja Reka, with the primary objective being to increase our understanding of the mineralisation at depth. We will also drill some exploratory holes into the Kozja Reka area that lies between Svinja Reka and Golema Reka, which was mined between 1966 and 1989."

Kounrad

Kounrad Q1 2019 copper production was 2,952 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 85,426 tonnes.

Total copper recovered from the Western Dumps in 2019 is 1,958 tonnes, equating to approximately 66% of the amount plated.

Copper sales during Q1 2019 were 2,894 tonnes.

Sasa

Production and sales

In Q1 2019, mined and processed ore were 197,836 tonnes and 199,489 tonnes respectively. The average head grades for the Q1 2019 period were 3.26% zinc and 3.84% lead. Q1 metallurgical recoveries were 86.8% for zinc and 94.0% for lead.

Sasa produces a zinc concentrate and a separate lead concentrate. In Q1 2019, 11,447 tonnes of concentrate containing 49.3% zinc and 9,870 tonnes of concentrate containing 73.1% lead were produced.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q1 2019 payable production was 4,723 tonnes of zinc and 6,851 tonnes of lead. Given that deliveries from Sasa to the smelters occur on a daily basis, payable base metal in concentrate sales for the quarter were very similar at 4,754Β tonnes of zinc and 6,921 tonnes of lead.

During Q1 2019, Sasa sold 88,392 ounces of payable silver that were recovered in the lead concentrate. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

Β 

Units

Β Q1 2019

Q1 2018

Ore mined

t

197,836

192,372

Plant feed

t

199,489

196,364

Zinc grade

%

3.26

3.32

Zinc recovery

%

86.8

84.6

Lead grade

%

3.84

3.83

Lead recovery

%

94.0

93.3

Zinc concentrate

t (dry)

11,447

11,385

- Grade

%

49.3

48.5

- Contained zinc

t

5,639

5,518

Lead concentrate

t (dry)

9,870

9,587

- Grade

%

73.1

73.2

- Contained lead

t

7,212

7,020

Β 

SRK Mineral Resource Statement

During 2018, CAML undertook diamond drilling at both Svinja Reka, the location of current Sasa mining operations, and Golema Reka, which was mined between 1981 and 2010. The assay results of these holes were released on 9 January 2019. Approximately 3,000 metres of drilling were undertaken at each deposit, with the aim of verifying previous exploration programmes and converting a portion of the Inferred Mineral Resources into the Indicated category.

The Svinja Reka and Golema Reka deposits have been explored and sampled using appropriate methodologies and are sufficiently understood to support the estimation of Indicated and Inferred Mineral Resources.

The Mineral Resource Statement below demonstrates Sasa's resources as of 31 December 2018. The statement has been prepared in accordance with JORC (2012) guidelines by Competent Person, Mr Guy Dishaw (P.Geo.). Mr Dishaw is a consultant employed by SRK who is independent of CAML.

SRK Mineral Resource Statement for combined Svinja Reka and Golema Reka deposits of the Sasa mine, as of 31 December 2018, reported at $35.0 and $40.0 per tonne net smelter return ('NSR') cut-off for each deposit respectively.

Classification

Deposit

Tonnage (mt)

Pb grade (%)

Pb contained (kt)

Zn grade (%)

Zn contained (kt)

Ag grade (g/t)

Ag contained (koz)

Indicated Mineral Resources

Svinja Reka

12.3

4.80

592

3.80

468

25

9,857

Golema Reka

1.3

3.80

48

1.61

20

13

528

Total Indicated

13.6

4.71

640

3.60

489

24

10,385

Inferred Mineral Resources

Svinja Reka

2.7

3.55

96

2.64

71

18

1,545

Golema Reka

6.3

3.47

217

1.38

86

12

2,444

Total Inferred

9.0

3.49

313

1.76

157

14

3,989

Total Indicated and Inferred Mineral Resources

22.5

4.23

953

2.87

646

20

14,374

Β 

Β· CAML owns 100% of the Sasa mine and is the operator

Β· All Indicated Mineral Resources are reported within the Exploitation Licence, although approximately 600kt (22%) of reported Inferred Resources at Svinja Reka exist outside the current Exploitation Licence

Β· Mineral Resources are reported as undiluted. No mining recovery has been applied in the Statement.

Β· Tonnages are reported in metric units, grades in per cent (%) or grammes per tonne (g/t), and the contained metal in metric units. Tonnages, grades, and contained metal totals are rounded appropriately. Rounding, as required by reporting guidelines, may result in apparent summation differences between tonnes, grade and contained metal content.

Svinja Reka

The updated MRE has demonstrated a 4% increase in overall zinc grade to 3.59% and a 7% increase in lead grade to 4.58% when compared to the 2017 MRE. This improvement in reported grades is largely a result of the intersection of mineralisation that was both thicker and higher grade than expected in the drilling between the 830 metre and 750 metre levels. This increase in grade has resulted in only a relatively small decrease in contained metal since the 2017 MRE of approximately 7,000 tonnes of lead and 6,000 tonnes of zinc, despite production during the period of 33,378 tonnes of zinc and 44,390 tonnes of lead.Β 

The total Svinja Reka combined Indicated and Inferred Resources of 15.1 million tonnes reflects removal from the model of 1.46 million tonnes of material that was mined or not recovered, 0.45 million tonnes of Inferred Resources that were converted to Indicated Resources and 0.45 million tonnes of new Inferred Resources that were identified through the drilling programme.

Golema Reka

At Golema Reka, combined Indicated and Inferred Mineral Resources of 7.6 million tonnes reflect an increase of 0.2 million tonnes since the 2017 MRE as a result of the drilling programme. 1.3 million tonnes of the total have been upgraded from the Inferred to Indicated category, demonstrating an increased level of confidence in this material, as a result of the 2018 drilling programme.

Β 

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson, CEO

Β 

Gavin Ferrar, CFO

Β 

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

Β 

Β 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

Β 

James Bavister

Β 

David McKeown

Β 

Β 

Β 

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Jeff Couch

Β 

Thomas Rider

Β 

Neil Elliot

Β 

Β 

Β 

Blytheweigh (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

Β 

Camilla Horsfall

Β 

Megan Ray

Β 

Review by Competent Person:

Β 

The Mineral Resource Estimate has been completed by Guy Dishaw, a Principal Consultant (Mining Geology) with SRK Consulting (UK) Ltd., who is a Member of the Association of Professional Engineers and Geologists of Saskatchewan. Guy Dishaw has some twenty years' experience in the exploration, definition and mining of precious and base metal Mineral Resources. Guy Dishaw has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the type of activity which he is undertaking to qualify as a "Competent Person" as defined by JORC and as required by the June 2009 Edition of the AIM Note for Mining and Oil & Gas Companies. Guy Dishaw has reviewed, and consents to, the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading. The technical information contained within this announcement has also been reviewed and approved by Scott Yelland, CAML COO, a qualified Chartered Engineer and Fellow of the Institute of Materials, Minerals and Mining (FIMMM).

Β 

Note to editors:

Β 

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and the Sasa zinc-lead mine in North Macedonia. For further information, please visit www.centralasiametals.com.

Β 

Glossary:

Ag

Chemical symbol for silver

Assay

Laboratory test conducted to determine the proportion of a mineral within a rock or other material

Grade

The proportion of a mineral within a rock or other material. For zinc and lead mineralisation this is usually reported as a percentage of zinc and lead per tonne of rock

g/t

Grammes per tonne

Indicated Mineral Resource

An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Ore Reserve

Inferred Mineral Resource

An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to an Ore Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration

JORC

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia

Mineral Resource

A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling

NSR cut off

The lowest net smelter return ('NSR') value of mineralised material that qualifies as potentially economically mineable

Pb

Chemical symbol for lead

Zn

Chemical symbol for zinc

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
Β 
END
Β 
Β 
UPDDKLFBKZFFBBB
Date   Source Headline
24th Apr 20177:30 amRNSGrant of Options
13th Apr 20174:26 pmRNSDirector/PDMR Shareholding
5th Apr 20174:01 pmRNSHolding(s) in Company
4th Apr 20177:00 amRNSQ1 2017 Production Update
4th Apr 20177:00 amRNSFinal Results
15th Mar 20177:00 amRNSNotice of Preliminary Results
19th Jan 20174:08 pmRNSHolding(s) in Company
18th Jan 20177:00 amRNSResults of the Copper Bay DFS
5th Jan 20177:00 amRNS2016 Operations Update
12th Dec 201612:46 pmRNSDirector/PDMR Shareholding
22nd Nov 20163:13 pmRNSAgreement signed to acquire Shuak copper property
5th Oct 20167:00 amRNSQ3 2016 Operations Update
13th Sep 20163:03 pmRNSUpdate research from QuotedData
12th Sep 20167:00 amRNSHalf-year Report
22nd Aug 201610:00 amRNSNew corporate website
22nd Aug 20167:00 amRNSNotice of Results
4th Jul 201612:34 pmRNSHolding(s) in Company
4th Jul 20167:00 amRNSOperations Update to 30 June 2016
8th Jun 20161:05 pmRNSResult of AGM
9th May 20168:00 amRNSExercise of Options and Directors' Dealings
27th Apr 20165:57 pmRNSAnnual Report and Accounts 2015 and Notice of AGM
21st Apr 201610:47 amRNSUpdate research from QuotedData
19th Apr 20167:30 amRNSGrant of Options
11th Apr 20168:09 amRNSNet Asset Value(s)
11th Apr 20167:00 amRNSFinal Results
7th Apr 20167:00 amRNSQ1 2016 Production Update
23rd Mar 20169:18 amRNSNotice of Results
9th Mar 20167:45 amRNSInitiation Research from QuotedData
15th Jan 201612:36 pmRNSHolding(s) in Company
6th Jan 20167:00 amRNS2015 Production Update and 2016 Outlook
8th Dec 20153:29 pmRNSAppointment of Non-Executive Director
30th Nov 201511:00 amRNSHolding(s) in Company
23rd Nov 20157:00 amRNSKounrad Update
5th Oct 20157:00 amRNSQ3 2015 Production Update
14th Sep 20157:00 amRNSHalf Yearly Report
28th Aug 201510:00 amRNSNotification of Major Interest in Shares
27th Aug 201510:30 amRNSNotice of Results
26th Aug 201512:57 pmRNSNotification of Major Interest in Shares
3rd Jul 20157:00 amRNSKounrad Production Update
29th Jun 20157:00 amRNSKounrad Production Update
25th Jun 20157:30 amRNSExercise of Options and Directors' Dealings
24th Jun 20157:00 amRNSUpdate on Copper Bay Investment
17th Jun 20151:20 pmRNSResult of AGM
21st May 20157:00 amRNSKounrad Expansion Update
20th May 20154:30 pmRNSPosting Notice of Meeting and Dividend Timetable
23rd Apr 20157:31 amRNSDirector Shareholding
23rd Apr 20157:30 amRNSGrant of Options
21st Apr 20154:48 pmRNSAnnual Report and Accounts 2014
15th Apr 201511:21 amRNSProposed Share Premium Cancellation& result of EGM
7th Apr 20157:00 amRNSQ1 2015 Production Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.