Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCALL.L Regulatory News (CALL)

  • There is currently no data for CALL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

American Electric Power FCL Agreement

23 Sep 2009 07:00

RNS Number : 4991Z
Zenergy Power PLC
23 September 2009
 

 

 

Zenergy Power plc

('Zenergy Power' or the 'Group')

 

American Electric Power FCL Agreement

 Zenergy Power (AIM:ZEN.L), the superconductor energy technology company, is pleased to announce that American Electric Power ('AEP') has entered into a collaborative agreement with the Group to become the first utility company to install and operate a transmission-voltage Fault Current Limiter ('FCL') on the United States Electricity Grid. 

AEP owns the United States' largest electricity transmission system, comprising of nearly 39,000 miles of transmission lines, and is one of the country's largest generators of electricity, owning nearly 38,000 megawatts of generating capacity. The FCL is expected to be installed at the 138-kilovolt Tidd substation near Steubenville, Ohio, in late 2011.

Zenergy Power's FCL is a newly developed and proprietary 'smart grid' device that helps to suppress the excess energy associated with 'fault currents' and, in doing so, protects essential large-scale grid equipment, including cables, transformers, capacitor banks and switchgear. Accordingly, Zenergy Power's FCL not only increases the reliability of the electricity supply but also mitigates significant capital expenditure by minimizing the incidence of electrical damage to grid equipment. In addition, it is anticipated that the use of FCLs in certain grid locations could defer the need to upgrade substation infrastructure which, depending on individual circumstances, can cost up to tens or hundreds of millions of dollars. 

Prior to entering into this agreement, AEP conducted a thorough evaluation of the FCL business case with respect to its own grid requirements.

The construction and installation of the high-voltage device will be partially funded by the U.S. Department of Energy ('DOE') as part of Zenergy Power's ongoing US$11 million project initially announced on June 29, 2007. As recently announced by the DOE, the availability of funding through this project has been accelerated as a result of the American Recovery and Reinvestment Act of 2009. Accordingly, Zenergy Power is particularly pleased to secure this agreement with AEP as it allows it to progress towards the completion of its DOE programme for the development of a high-voltage FCL product based upon the newly developed and tested compact design. 

Michael Heyeck, Senior Vice President of Transmission, AEP, commented:

"As we expand and rebuild the transmission grid of the future to enable renewables and other forms of new generation, superconducting FCLs can provide a smart means to avoid capital investment as we integrate newer grid elements into the existing grid. An economical and reliable application of FCL would be useful in addressing these challenges."

A distribution-voltage FCL from Zenergy Power was installed and commissioned earlier this year by Southern California Edison in its Avanti 'Circuit of the Future' near Los Angeles. This latest agreement with AEP means that Zenergy Power is now positioned to become the first company to install and operate superconductor FCLs on the United States Electricity Grid in both the medium-voltage range (used for urban distribution of power) as well as the high-voltage range (used for longer distance transmission of power).

 

 

-Ends-

 

Further information

 

Andrew Tan

Zenergy Power

+ 44 207 602 7420

 

 

 

David Bick

Square1 Consulting Ltd

+ 44 207 929 5599

 

 

 

Andrew Godber/Katherine Roe

Panmure Gordon & Co

+ 44 207 459 5742

 

 

 

Kam Bansil/Rory Scott

Mirabaud Securities Limited

+ 44 207 866 0244

 

 

About Zenergy Power

Zenergy Power is a superconductor energy technology company, quoted on the AIM market of the London Stock Exchange and comprising three operating subsidiaries located in Germany, USA and Australia. The Group's commercial focus is the innovation and manufacture of clean energy superconductor solutions that are capable of delivering huge efficiency and cost improvements to the generation, distribution and consumption of electrical energy.

Today, the Group's groundbreaking superconductive solutions are already delivering energy savings to industrial users of electrical energy and providing cutting-edge protection from electrical power surges to the United States electricity grid. Looking to the near future, the Group is currently developing a range of highly energy efficient superconductor components for a new class of electricity generator capable of delivering significant cost savings to the renewable energy industry. These cost savings will enable renewable energy to more effectively compete with traditional thermal power generation; leading to a greater reduction in carbon emissions and a more sustainable economic future.

In 2007, Zenergy Power became the first company in the world to complete a commercial sale of an industrial scale superconductor application and has subsequently developed products capable of addressing several multi-billion dollar global markets. Following this in the first quarter of 2009, the Group proudly became the first company to install and operate a superconductor smart grid device, capable of significantly reducing the damaging effects of large-scale power surges, into the United States electricity grid. In line with this leading industry position, Zenergy Power is also manufacturing core components for what is due to be the world's first superconductor electricity generator which is due for installation into E.ON AG's commercial hydro power station in early 2010.

About superconductivity

Superconductive materials are capable of conducting electricity without any resistance and were first discovered in 1911 in what was to prove to be one of the most significant scientific breakthroughs of the 20th Century.

 

Superconductors enable: 

Energy intensive industrial applications capable of reducing energy consumption by 50% 

The protection of national power grids from blackouts

The production of revolutionary light-weight, efficient 10MW class renewable wind generators capable of reducing the cost of offshore wind power by 25%

The production of a new class of compact and efficient hydro generators capable of significantly increasing electrical power output from existing and new hydro dam structures

 

About American Electric Power

American Electric Power is one of the largest electric utilities in the United States, delivering electricity to more than 5 million customers in 11 states. AEP ranks among the nation's largest generators of electricity, owning nearly 38,000 megawatts of generating capacity in the U.S. AEP also owns the nation's largest electricity transmission system, a nearly 39,000-mile network that includes more 765-kilovolt extra-high voltage transmission lines than all other U.S. transmission systems combined. AEP's transmission system directly or indirectly serves about 10 percent of the electricity demand in the Eastern Interconnection, the interconnected transmission system that covers 38 eastern and central U.S. states and eastern Canada, and approximately 11 percent of the electricity demand in ERCOT, the transmission system that covers much of Texas. AEP's utility units operate as AEP Ohio, AEP Texas, Appalachian Power (in Virginia, West Virginia), AEP Appalachian Power (in Tennessee), Indiana Michigan Power, Kentucky Power, Public Service Company of Oklahoma, and Southwestern Electric Power Company (in Arkansas, Louisiana and east Texas). AEP's headquarters are in Columbus, Ohio.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCILFSTATIFFIA
Date   Source Headline
14th Oct 20207:00 amRNSTrading on the New York OTCQX® Best Market
7th Oct 20207:00 amRNSCorrection: Holding(s) in Company
6th Oct 20205:15 pmRNSHolding(s) in Company
6th Oct 20207:00 amRNSNotice of Capital Markets Day
5th Oct 20207:00 amRNSHolding(s) in Company
2nd Oct 20207:00 amRNSIntegration with Eclipse Software
23rd Sep 20207:00 amRNSInterim results for the six months to 30 June 2020
18th Sep 20208:00 amRNSHolding(s) in Company
11th Sep 20207:00 amRNSNotice of Results
10th Aug 202012:40 pmRNSBlock Listing Review
29th Jul 20207:00 amRNSIntegration with recruitment CRM TrackerRMS
22nd Jul 20207:00 amRNSInterim Trading Update
16th Jul 20207:00 amRNSCloudCall announces partnership with Informunity
13th Jul 20207:00 amRNSCloudCall announces new integration for Zoho
7th Jul 20207:00 amRNSPost Close Update and Investor Presentation
30th Jun 20206:00 pmRNSTotal Voting Rights
3rd Jun 20204:45 pmRNSDirector/PDMR Shareholding
1st Jun 20201:40 pmRNSResult of AGM
1st Jun 20207:00 amRNSAGM trading update and investor meeting
27th May 20201:30 pmRNSAnnual General Meeting and Covid-19 Trading Update
30th Apr 20205:50 pmRNSPosting of Annual Report and Notice of AGM
8th Apr 202012:15 pmRNSInvestor Communications
8th Apr 20207:00 amRNSFinal Results for the Year Ended 31 December 2019
24th Mar 20207:00 amRNSFY 19 results publication date and trading update
12th Mar 20207:00 amRNSAppointment of Chief Technology Officer
4th Mar 20207:00 amRNSCloudCall Launches in Australia
3rd Mar 20207:00 amRNSAppointment of Chief Revenue Officer
2nd Mar 20207:00 amRNSTotal Voting Rights
25th Feb 20204:35 pmRNSHolding(s) in Company
25th Feb 20208:15 amRNSHolding(s) in Company
24th Feb 20207:00 amRNSContract Win with Vaco
17th Feb 20207:00 amRNSCloudCall and Vincere partnership
12th Feb 20206:20 pmRNSBlock Listing Return
16th Jan 20207:00 amRNSTrading update for the year ended 31 December 2019
4th Dec 20197:00 amRNSCloudCall and TargetRecruit partnership
22nd Nov 20197:00 amRNSDirectorate Change
19th Nov 20193:10 pmRNSHolding(s) in Company
11th Nov 20197:00 amRNSCloudCall and Mercury xRM partnership
5th Nov 20195:45 pmRNSHolding(s) in Company
28th Oct 20195:15 pmRNSHolding(s) in Company
28th Oct 20197:00 amRNSHolding(s) in Company
24th Oct 20195:19 pmRNSHolding(s) in Company
21st Oct 20191:45 pmRNSResult of General Meeting and Open Offer
10th Oct 20197:00 amRNSHolding(s) in Company
4th Oct 20192:00 pmRNSHolding(s) in Company
2nd Oct 201912:00 pmRNSPosting of Circular and Notice of General Meeting
1st Oct 20194:00 pmRNSHolding(s) in Company
30th Sep 20195:30 pmRNSOpen Offer Information
30th Sep 20197:01 amRNSConditional Placing and Open Offer
30th Sep 20197:00 amRNSInterim Results Announcement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.