Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
8.10    0.06 (0.75%)
Bid:
7.90
Ask:
8.30
Spread: 0.40 (5.063%)
Market Cap: £39.85m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

Stage 7 Drill Program Completed

17 Jul 2025 07:00

RNS Number : 3916R
Blencowe Resources PLC
17 July 2025
 

Date: 17 July 2025

Blencowe Resources Plc

("Blencowe" or the "Company")

 

Stage 7 Drill Program Completed at Orom-Cross Graphite Project

Largest campaign to date confirms scale, delivers critical DFS inputs, and supports JORC resource upgrade

 

Blencowe Resources Plc ("Blencowe" or the "Company") is pleased to announce the successful completion of its Stage 7 drilling program at the Orom-Cross Graphite Project in Uganda. This campaign, the largest in the project's history, was a core milestone for the ongoing Definitive Feasibility Study (DFS), both in terms of upgrading and expanding the JORC Resource and fulfilling the requirements for the US$5.0 million Technical Assistance Grant from the US International Development Finance Corporation (DFC).

Highlights:

· 6,750 metres drilled across 239 holes - largest single drilling campaign in Orom-Cross history.

· JORC upgrade underway - data supports conversion of resources from Inferred/Indicated to Measured categories following completion of infill drilling at existing deposits.

· Geotechnical drilling completed - supporting pit wall design and tailings layout for the DFS.

· Exploration success at new 'Beehive' deposit - brand new graphite zone confirmed 3 kms apart from the two existing graphite deposits.

· Deep drill holes at both Beehive and Northern Syncline confirm scale - graphite mineralisation continues over 100 metres, 3 times deeper than previous drilling.

· Permanent exploration camp construction - underway.

· Samples at JORC accredited laboratories - first assay results expected imminently.

 

All rigs from local drilling contractor ADT are now demobilised from site. Final core logging and sampling are underway, with remaining samples from the deep hole drilling now despatched to Kampala for Mines Department inspection prior to being transported to the independent and JORC accredited laboratories in Tanzania to be assayed,

Drilling Program Summary

The Company focussed on four specific phases within the Stage 7 drill program.

Phase 1: Geotechnical (8 holes, 590 metres)

Drilled across Camp Lode and Northern Syncline (East) to gather information on rock strengths and characteristics to support DFS pit design, waste dump wall slopes for stability, and tailings planning.

Phase 2: Infill (39 holes, 1,181 metres)

Targeted both main deposits to upgrade 24.5Mt existing JORC resource into Measured/Indicated categories giving greater confidence in the estimation of both grade and tonnage.

Phase 3: Resource Expansion (186 holes, 5,581 metres)

Drilling new zones at Northern Syncline West (70 holes) and the Beehive deposit (116 holes). Early indications suggest both zones could match or exceed the tonnage of current resources, with the Beehive deposit specifically selected due to higher grade intercepts from drilling and trenching in earlier exploration work.

Resource expansion will deliver additional processing capacity, higher production volumes and a longer mine life, all of which add to the overall Orom-Cross value.

Phase 4: Deep Exploration (6 holes, 721 metres)

Tested mineralisation continuity at 100+ meter depth in both Beehive and Northern Syncline deposits. All holes ended in graphite which highlights the potential for a significantly larger resource.

All previous drilling has been focused on the near surface 'oxide' materials within 30 metres of surface which will be more cost-effective to mine but drilling in all of these 6 deep holes has shown the continuation of ore bearing zones through to end of the holes, indicating the ore zones continue at depth as shown in earlier drill programs.

These deep holes support the view of a potentially multi-billion tonne resource, originally proposed by independent geological consultant Minrom. Further step-out drilling could unlock even more value in future phases.

 

Graphite Quality and Grade

Mineralisation across all 239 holes remains consistent with previous campaigns.

· Higher-grade results are expected from Beehive based on historical evidence.

· Orom-Cross graphite demonstrates exceptional characteristics at 96-97% TGC concentrate, as well as 99.95%-99.99% TGC purified graphite.

· In-situ flake size distribution (~70% large flakes) remains a key competitive advantage.

 

Current JORC Resource (pre-upgrade)

Area

Classification

Millions tonnes

% Total Carbon

Northern Syncline:

Measured

1.0

5.70

Indicated

10.4

5.85

Inferred

10.6

5.78

Sub-Total

21.90

5.80

Camp Lode:

Indicated

1.9

7.40

Inferred

0.6

7.50

Sub-Total

2.5

7.42

TOTALS

Measured

1,0

5.70

Indicated

12.3

6.09

Inferred

11.2

5.87

TOTAL

 

24.5

6.0

As part of the finalisation of the Definitive Feasibility Study and the completion of the Stage 7 drilling program Blencowe intends to deliver a revised JORC Standard Mineral Resource within the near term.

 

Figure 1: Stage 7 drill holes for two separate deposits (Northern Syncline and Beehive)

 

 

 

Executive Chairman Cameron Pearce commented:

 

"This latest drilling campaign has delivered excellent results against all the objectives. We have always believed in the size, scale and high quality of the Orom-Cross graphite deposit, but this drill program has gone a long way to verifying that we have all these key attributes to establishing a tier one graphite asset. 

We achieved all our objectives - gathering essential geotechnical data to complete mine design, infill drilling to substantially upgrade the existing resource, and exploration to extend an existing deposit and thereafter to locate and discover a brand-new deposit. Importantly, the six deeper holes drilled at the end of the program confirmed graphite mineralisation well beyond 100 metres depth - three times deeper than before - with ore zones still open at depth.

"These results continue to strengthen the case for Orom-Cross as a large, long-life and multi-cycle asset with exceptional product quality. Our focus now turns to integrating this into the DFS to demonstrate the full commercial value of the project within the global graphite supply chain."

 

For further information please contact:

 

 Blencowe Resources Plc

 Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Securities 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

 

Background

 

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is now completing the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLRFMBTMTABTPA
Date   Source Headline
23rd Oct 202510:48 amRNSExercise of Warrants
21st Oct 20257:00 amRNSFurther Drilling Results - Camp Lode
17th Oct 202511:08 amRNS-RInterview with CEO Mike Ralston -DFS Progress
17th Oct 20257:00 amRNSFurther Battery Testing Success
15th Oct 20255:00 pmRNSHolding(s) in Company
8th Oct 202512:24 pmRNSExercise of Warrants
3rd Oct 20257:00 amRNSIssue of DFC Performance Shares and DFS Options
1st Oct 20251:19 pmRNSExercise of Warrants
26th Sep 20259:04 amRNSHolding(s) in Company
25th Sep 20257:00 amRNSDrilling Results
23rd Sep 20257:00 amRNSHolding(s) in Company
12th Sep 20257:00 amRNSFundraise of £1.12m and Exercise of Options at 6p
10th Sep 20257:00 amRNS-RUpdated Corporate Presentation
4th Sep 20257:00 amRNSAppointment of Project Finance Adviser
22nd Aug 20257:00 amRNSCompletion of Orom-Cross DFS Programmes
12th Aug 20257:00 amRNSIssue of Equity
1st Aug 20257:00 amRNSOfftake Agreement Signed
30th Jul 20257:00 amRNSExercise of Warrants
17th Jul 20257:00 amRNSStage 7 Drill Program Completed
8th Jul 202510:48 amRNSExercise of Warrants
8th Jul 20257:00 amRNSReceipt of US$0.75 million from DFC
2nd Jul 20257:00 amRNSDeep Drilling at Northern Syncline
26th Jun 20257:00 amRNSStage 7 Drilling Program Update
13th Jun 20257:00 amRNSSAFELOOP Testing Update
2nd Jun 20253:56 pmRNSInterim Consolidated FS Six Month End 31 Mar 2025
23rd May 20257:00 amRNSFurther US$0.5M Grant Funding Received From DFC
22nd May 20259:36 amRNSHolding(s) in Company
21st May 20257:00 amRNS-RInterview with CEO
7th May 20257:00 amRNSStage 7 Drill Program Nears Completion
22nd Apr 20254:43 pmRNSResults of Retail Offer - Replacement
16th Apr 20258:14 amRNSResults of Retail Offer
15th Apr 20254:40 pmRNSRetail Offer to Raise up to £100,000
15th Apr 20254:35 pmRNSFundraise of £1m to support completion of the DFS
8th Apr 20257:39 amRNSOfftake Agreement with TaiDa
31st Mar 20257:00 amRNSDrilling Update
21st Mar 20257:00 amRNSESIA Approval
19th Mar 20257:00 amRNSOfftake for Purified Graphite
3rd Mar 20257:00 amRNSAFC Expression of Interest
26th Feb 20254:32 pmRNSResult of AGM
20th Feb 20257:00 amRNSHydropower Study
14th Feb 20257:00 amRNS7,000m Drilling Programme
31st Jan 20258:56 amRNSAnnual Financial Report
30th Jan 20257:00 amRNSSAFELOOP Update
28th Jan 20257:00 amRNS-RWebinar 25 February 2025
9th Jan 20257:00 amRNSCommencement of Drilling
19th Dec 202411:02 amRNSResult of Meeting
10th Dec 202410:04 amRNS-RUpdated Corporate Presentation
9th Dec 20247:00 amRNSExercise of Warrants
28th Nov 20247:00 amRNSBlencowe Joins European EV Consortium
26th Nov 202412:12 pmRNSPublication of a Prospectus

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.