8 Mar 2022 07:00

RNS Number : 9912D
Blencowe Resources PLC
08 March 2022
Β 

Date: 08 March 2022

Blencowe Resources Plc

("Blencowe" or the "Company")

Β 

Blencowe Provides PFS Update for Orom-Cross Graphite Project in Uganda

Β 

Blencowe moving to complete PFS on Priority Project by mid-year as precursor to implementing First Graphite Production from 2023

Β 

Β 

Highlights

Β· Blencowe acquired world class Orom-Cross graphite project less than 2 years ago; has been on fast-track development towards production ever since.

Β· Extensive infill drilling programme was completed in 2021 to provide updated JORC Resource estimate for use within Pre-Feasibility Study ("PFS")

Β· Phase Three Metallurgical test work near completion to provide fact sheets to users on end products and process flows to achieve them

Β· Work underway in all facets to deliver high quality PFS by mid-year target date

Β 

Blencowe Resources ("Blencowe" or the "Company") is pleased to provide an update on its ongoing Pre-Feasibility Study at its priority Orom-Cross graphite project. Orom-Cross is a substantial graphite deposit with an estimated 2-3 billion tonnes, of which the first 20 years life of mine has already been drilled out. However the deposit is so vast that this represents less than 1% of the estimated graphite within the tenements. Furthermore, the graphite is shallow and Blencowe will be mining to just 25 meters which means low cost mining from a free dig open cut operation.

The Preliminary Economic Assessment ("PEA") for Orom-Cross (completed September 2021) provided the basis for a large scale 75,000tpa graphite operation, however Blencowe has indicated that it will scale this down in the early years to allow for a lower risk, lower capex start-up, around 25,000tpa of high grade concentrate. There will be provision for ramping this plant size and production rate up quickly over the first ten years to accommodate what is expected to be a surge in demand for flake graphite, predominantly for use within lithium-ion batteries for electric vehicles (EVs).

The Company is working closely with its specialist technical partner Battery Limits to deliver a low cost mining operation that will put Orom-Cross in the lowest percentile of worldwide graphite producers, which not only provides more margin and earnings but also de-risks the operation significantly. Low capital costs to implement and low operating costs once in production are massive advantages to any mining operation.

Currently Blencowe is awaiting the revised JORC Resource estimate for Orom-Cross, based on the extensive infill drilling programme from 2021, and its geological partner Minrom will provide this update shortly. This JORC Resource is expected to increment the 16Mt at 6.0% TGC that was announced to market in 2021 and provide additional tonnes that can be utilised for a much longer mine life than previously indicated in the PEA. In parallel work is being completed on Phase Three metallurgical test work to refine the end products that will be delivered as concentrate from Orom-Cross, and these results are also expected shortly. Phase Two met test work indicated a high quality array of end products that should be sought after in the market, and Phase Three is expected to underline this further by confirming the marketable characteristics of the different mesh size products and producing concentrates for consumer testing prior to pilot plant production .

One of the key additions within the PFS (from the 2021 PEA) is the expectation that Blencowe will deliver a pilot plant by 2023 in order to product small quantities of these same end products to pre-qualify sales into end users. This is seen as a necessary and integral step in order to sell higher quantities of graphite concentrate from 2025 onwards when the main plant is expected to be commissioned.

Furthermore, Blencowe is also looking at all options to deliver green graphite products via a project that leans heavily on renewable energy and other sustainable components. This is seen as a very important objective within the PFS and the strategy moving beyond.

All other areas within the PFS are going to plan, with work underway on all key areas including infrastructure, energy, roads, water, tailings, logistics, sales and marketing, plus plant and camp design.

Β 

Cameron Pearce, Blencowe's Executive Chairman commented;

"Blencowe is moving quickly to establish itself as a producer of premier grade green graphite products, delivered at a low operating cost to both de-risk and to ensure highest possible margins. The PFS is exploring all options, including a pilot plant from 2023 as a precursor to the main plant commissioned by 2025. Graphite demand is forecast to expand considerably from 2025 onwards and Blencowe wants to be positioned by then not only as a producer but also ready and able to expand quickly and cost-effectively to take advantage of growing worldwide demand. Events in Eastern Europe over the past month have underlined the importance of supply chain diversification and we aim to provide a high quality alternative supply route for a key battery metal, within a low risk location.

Β 

We have also recently added a highly prospective nickel sulphide project into our portfolio as well, to further expand our upside."

Β 

We have come a long way in the 2 years since we acquired Orom-Cross, and the upswing in demand that we are seeing for the products we will produce has fully justified our strategy. The next important step will be to provide the market with a clear picture of what our production plans ahead look like, including pre-qualification of sales into end users over a longer period so they can all fully understand the characteristics of the products we will deliver prior to expansion into full production mode."

Β 

Β 

Β 

Β 

Β 

Β 

For further information please contact:

Β 

Blencowe Resources Plc

Sam Quinn

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Β 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

Β 

Tavira Securities

Jonathan Evans

Tel: +44 (0)20 7100 5100

jonathan.evans@tavirasecurities.com

Β 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

Β 

TwitterΒ https://twitter.com/BlencoweRes

Β 

LinkedInΒ https://www.linkedin.com/company/72382491/admin/

Β 

Β 

Background

Β 

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit. A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is moving through the Feasibility Study phase as it drives towards first production targeted for 2023.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 16.3Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

Β 

Akelikongo Nickel Project

Akelikongo is a highly prospective nickel sulphide exploration project that has previously had considerable work completed by Rio Tinto and Sipa to establish three mineralised lenses to date. It represents an opportunity for Blencowe to add further value through a targeted work programme that will seek to delineate higher grade and thicker intercepts of nickel.

Nickel sulphide deposits are rare and valuable and the prospect of further exploration success gives Blencowe suitable incentive to develop this asset under a structured earn-in agreement, whereby 100% of the asset can ultimately be acquired for US$1.5m, all payable in shares.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
MSCUPUQWWUPPUQR
Date   Source Headline
23rd Oct 202510:48 amRNSExercise of Warrants
21st Oct 20257:00 amRNSFurther Drilling Results - Camp Lode
17th Oct 202511:08 amRNS-RInterview with CEO Mike Ralston -DFS Progress
17th Oct 20257:00 amRNSFurther Battery Testing Success
15th Oct 20255:00 pmRNSHolding(s) in Company
8th Oct 202512:24 pmRNSExercise of Warrants
3rd Oct 20257:00 amRNSIssue of DFC Performance Shares and DFS Options
1st Oct 20251:19 pmRNSExercise of Warrants
26th Sep 20259:04 amRNSHolding(s) in Company
25th Sep 20257:00 amRNSDrilling Results
23rd Sep 20257:00 amRNSHolding(s) in Company
12th Sep 20257:00 amRNSFundraise of £1.12m and Exercise of Options at 6p
10th Sep 20257:00 amRNS-RUpdated Corporate Presentation
4th Sep 20257:00 amRNSAppointment of Project Finance Adviser
22nd Aug 20257:00 amRNSCompletion of Orom-Cross DFS Programmes
12th Aug 20257:00 amRNSIssue of Equity
1st Aug 20257:00 amRNSOfftake Agreement Signed
30th Jul 20257:00 amRNSExercise of Warrants
17th Jul 20257:00 amRNSStage 7 Drill Program Completed
8th Jul 202510:48 amRNSExercise of Warrants
8th Jul 20257:00 amRNSReceipt of US$0.75 million from DFC
2nd Jul 20257:00 amRNSDeep Drilling at Northern Syncline
26th Jun 20257:00 amRNSStage 7 Drilling Program Update
13th Jun 20257:00 amRNSSAFELOOP Testing Update
2nd Jun 20253:56 pmRNSInterim Consolidated FS Six Month End 31 Mar 2025
23rd May 20257:00 amRNSFurther US$0.5M Grant Funding Received From DFC
22nd May 20259:36 amRNSHolding(s) in Company
21st May 20257:00 amRNS-RInterview with CEO
7th May 20257:00 amRNSStage 7 Drill Program Nears Completion
22nd Apr 20254:43 pmRNSResults of Retail Offer - Replacement
16th Apr 20258:14 amRNSResults of Retail Offer
15th Apr 20254:40 pmRNSRetail Offer to Raise up to £100,000
15th Apr 20254:35 pmRNSFundraise of £1m to support completion of the DFS
8th Apr 20257:39 amRNSOfftake Agreement with TaiDa
31st Mar 20257:00 amRNSDrilling Update
21st Mar 20257:00 amRNSESIA Approval
19th Mar 20257:00 amRNSOfftake for Purified Graphite
3rd Mar 20257:00 amRNSAFC Expression of Interest
26th Feb 20254:32 pmRNSResult of AGM
20th Feb 20257:00 amRNSHydropower Study
14th Feb 20257:00 amRNS7,000m Drilling Programme
31st Jan 20258:56 amRNSAnnual Financial Report
30th Jan 20257:00 amRNSSAFELOOP Update
28th Jan 20257:00 amRNS-RWebinar 25 February 2025
9th Jan 20257:00 amRNSCommencement of Drilling
19th Dec 202411:02 amRNSResult of Meeting
10th Dec 202410:04 amRNS-RUpdated Corporate Presentation
9th Dec 20247:00 amRNSExercise of Warrants
28th Nov 20247:00 amRNSBlencowe Joins European EV Consortium
26th Nov 202412:12 pmRNSPublication of a Prospectus

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.