Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resou. Regulatory News (BRES)

Share Price Information for Blencowe Resou. (BRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.25
Bid: 5.00
Ask: 5.50
Change: 0.00 (0.00%)
Spread: 0.50 (10.00%)
Open: 5.05
High: 0.00
Low: 0.00
Prev. Close: 5.25
BRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Metallurgical Test Work Update

6 Dec 2022 07:00

RNS Number : 6770I
Blencowe Resources PLC
06 December 2022
 

Date: 06 December 2022 Blencowe Resources

 

Successful Further Metallurgical Test Work for Orom-Cross Graphite Project Sets-Up Bulk Sample Test Phase

Larger sample confirms same high quality end product as previous metallurgical test work

 

Highlights:

· Blencowe successfully completes critical metallurgical test work on substantially up-scaled quantities of Orom-Cross composite mix, as per what was previously tested by SGS in Canada.

· Results continue to highlight a high grade, low impurity concentrate can be delivered from Orom-Cross.

· Duplication of bench scale testing results now completed through to bulk sample test stage.

· Test work completed by leading Australian metallurgical test firm IMO.

· Blencowe now has considerably more volume of end product to send to interested end users for testing.

 

Blencowe Resources Plc ("Blencowe" or the "Company"), is pleased to announce that additional metallurgical test work on its Orom-Cross graphite project in Northern Uganda has been completed by leading technical specialist firm IMO based in Perth, Australia. This work is critical to understanding the quality of the end-product that Orom-Cross can deliver as a high-grade graphite concentrate, as well as what the process flow will look like to achieve this on a pre-commercial scale. It also provides significantly greater quantum of end product for end user testing which is critical for the Definitive Feasibility Study.

Blencowe appointed IMO to undertake metallurgical test work on material gathered from its drilling campaigns which covered both the Northern Syncline and Camp lode areas within Orom-Cross. The program was designed to deliver the following objectives:

1. Confirm a 95-97% TGC (Total Graphite Content) pure concentrate is possible with low impurities (Thorium and Vanadium).

2. Confirm ~90% recovery is achievable for this concentrate.

3. Confirm the liberation process in order to maintain a high percentage of Jumbo/XL/Large flakes within the concentrate.

4. Confirm the process flow diagram for plant design as part of the Definitive Feasibility Study.

5. Deliver bulk concentrate samples to allow Blencowe to initiate discussions with potential off-take partners.

Blencowe is pleased to announce that all 5 objectives have been met or exceeded in this latest round of test work. Open cycle floatation testing produced recoveries between 90-92% and concentrate grades consistently range between 95-98% which are battery grade.

The additional metallurgical test work was commissioned to test the upgradeability of the bench scale test work completed by SGS in Lakefield. A total of 1,400kg was processed (as compared to 100kg within SGS test work) and all metallurgical test-work undertaken to date shows a robust flowsheet capable of repeatable metallurgy for a wide range of feed samples from Orom-Cross.

A total of eight rougher and cleaner flotation tests were carried out on the Master composite that culminated in the flowsheet that is atypical of similar graphite projects. The flowsheet consists of a flash and rougher flotation stage followed by a primary cleaning circuit with a polishing mill followed by three stages of cleaner flotation. The intermediate concentrate is classified and then further upgraded in secondary cleaning circuits with stirred media mills (SMM) followed by cleaner flotation.

The proposed flowsheet was employed in a continuous pilot operation to determine the metallurgical response under typical operating conditions. The final concentrate graded 96.4% C(t) at 90.6% total carbon recovery which exceeded the company's expectations and places the end product recovered at the higher end of the spectrum in comparison to its peers. 

Test work was focussed on the 5 points above and not geared towards optimising the flake size fractions. As the resultant splits using an unoptimised circuit are within 5% of the fractions as determined by the original SGS bench scale works there may be further incremental value to be added by optimising ahead. The key takeaway from these results is that the scaling factors in the metallurgical testing will likely replicate the original test work and results through to commercial scale production.

At the end of this larger scale metallurgical program, approximately 80kg of concentrate was produced (versus 5-8kgs from SGS in Canada) which will be forwarded to potential end-users and project partners for additional test work on screening splits and grade analysis, as well as suitability for further downstream processing of the concentrate.

The design of the processing plant will be based on both the SGS and IMO test-work and best practice in similar operations. Importantly, the process requires no primary crushing or grinding of the ore, thus preserving the larger flake sizes, which is a material advantage over hard-rock graphite deposits.

 

Executive Chairman Cameron Pearce commented:

"We are delighted with these IMO met test results as they not only continue to underpin Orom-Cross concentrate as high quality in all key areas relevant to end users but the test work has highlighted that we can now deliver these end results on a much greater scale of raw material as processed. This is a key steps towards commercial stage production testing in a pilot plant facility. It also highlights the potential to increase the percentage of the more valuable coarse flake products through further optimisation of the processing circuits and this will be considered in the next round of testing. 

This latest set of results sets us up nicely for the bulk sample trial we will be conducting on 100 tonnes of Orom-Cross composite in 1H 2023 and if these same results are produced from that exercise we will be largely pre-qualified in terms of end products delivered as concentrate."

 

 

 

 

 

 

 

For further information please contact:

 

 Blencowe Resources Plc

 Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is moving into the Definitive Feasibility Study phase shortly as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDTABTTMTJMTTT
Date   Source Headline
21st Jul 202210:00 amRNSResearch Note
19th Jul 20227:00 amRNSUpdated Corporate Presentation
19th Jul 20227:00 amRNSPre-Feasibility Study Results for Orom-Cross
23rd Jun 20227:00 amRNSHalf-year Report
6th Jun 20227:00 amRNSFinal Metallurgical Test Work Results
30th May 20227:00 amRNSAirborne EM Survey at Akelikongo
6th May 20222:09 pmRNSInvestor Evening
3rd May 20227:00 amRNSESG Consultants Appointed
26th Apr 20229:34 amRNSHolding(s) in Company
19th Apr 20221:43 pmRNSHolding(s) in Company
11th Apr 20227:30 amRNSUpdated Presentation
11th Apr 20227:30 amRNSPlacing
11th Apr 20227:00 amRNSUpdated JORC Resource
6th Apr 202210:30 amRNSInvestor Webinar Call
21st Mar 20227:00 amRNSAkelikongo Exploration Programme
8th Mar 20227:00 amRNSPFS Update
25th Feb 202211:00 amRNSInvestor Webinar Recording
23rd Feb 202210:34 amRNSResult of AGM
23rd Feb 20227:00 amRNSPresentation & Investor Webinar
22nd Feb 20227:00 amRNSAcquisition of Nickel Sulphide Project in Uganda
17th Feb 20227:00 amRNSRescheduling of Investor Webinar
16th Feb 20224:40 pmRNSSecond Price Monitoring Extn
16th Feb 20224:36 pmRNSPrice Monitoring Extension
10th Feb 20229:30 amRNSInvestor Call
8th Feb 20227:00 amRNSDrilling Results Northern Syncline
31st Jan 20223:32 pmRNSNotice of AGM
31st Jan 20227:00 amRNSCamp Lode Drilling Results
28th Jan 20227:00 amRNSAnnual Financial Report
26th Jan 20227:28 amRNSWork Programme
17th Jan 20222:30 pmRNSHolding(s) in Company
17th Jan 20221:00 pmRNSConsolidated Africa Holding & Joint Broker
13th Jan 20227:00 amRNSAppointment of Battery Limits
17th Dec 20211:04 pmRNSIssue of Options
16th Dec 20217:00 amRNSGraphite Sales and Marketing Expert Appointed
10th Dec 20213:35 pmRNSPublication of a Prospectus
8th Dec 202110:11 amRNSResult of General Meeting
8th Dec 20218:28 amRNSWebinar Call
15th Nov 202111:56 amRNSAMENDED Notice of General Meeting
15th Nov 202111:37 amRNSNotice of GM
12th Nov 20218:33 amRNSOver-Subscribed £2m Capital Raise
4th Oct 20217:00 amRNSCorporate Presentation
29th Sep 20217:00 amRNSOrom Cross PEA
20th Sep 20217:00 amRNSOrom Cross Update
17th Sep 20219:19 amRNSTR-1: Standard form notification of major holdings
16th Aug 20217:00 amRNSSecond Drilling Program at Orom-Cross Project
20th Jul 20212:01 pmRNSInvitation to Webinar
14th Jul 20217:00 amRNSIssue of Equity
13th Jul 20217:34 amRNSResults of Metallurgical Test Work
5th Jul 20217:00 amRNSDrill Program Ahead of Schedule
24th Jun 20214:00 pmRNSTR-1: Standard form notification of major holdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.