If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
7.00    -0.10 (-1.41%)
Bid:
6.80
Ask:
7.20
Spread: 0.40 (5.882%)
Market Cap: £34.47m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

Drilling Update

31 Mar 2025 07:00

RNS Number : 8341C
Blencowe Resources PLC
31 March 2025
 

Date: 31 March 2025

Blencowe Resources Plc

("Blencowe" or the "Company") 

Infill Drilling Phase Successfully Completed

Drilling progresses on 6,750m program to expand Orom-Cross Resources and Reserves

 

Blencowe Resources (LSE: BRES) is pleased to provide an update on its 6,750m drilling program at its Orom-Cross graphite project in Uganda. The campaign, which commenced in January is focussed on:

· Stage 1 - Gathering geotechnical information to support mine design

· Stage 2 - Infill drilling on the existing two deposits aiming to convert significant volumes of existing Resources to Reserves

· Stage 3 - Step-out exploration at two new exploration targets to expand the overall Resource base.

Orom-Cross currently holds a JORC Resource of 24.5Mt @ 6.0% TGC, and the Company is targeting a substantial upgrade.

Following the successful completion of Stage 1 (geotechnical drilling) in February, Blencowe is pleased to report that Stage 2 (infill drilling) is now also complete.

 

Highlights:

· Infill drilling on both Northern Syncline and Camp Lode deposits - completed

· Geotechnical drilling for pit slope parameters - completed

· Access roads upgrade for all weather use - completed

· Permanent exploration camp construction underway

· Third rig mobilised to fast-track step-out drilling

 

Drilling continues to progress on schedule with two rigs from Ugandan contractor ADT operating on site with a third soon to be mobilised to accelerate exploration at the Northern Syncline Western Limb and new GT-01 targets.

28 infill holes at the Northern Syncline deposit have been drilled, logged, and sampled, with 26 now ready for assay. A further 11 holes at the Camp Lode deposit are complete, with sampling and logging underway. Initial observations suggest consistent geology in line with existing resource models which supports the goal of significantly increasing the Orom-Cross Resources and Reserves classifications to underpin longer mine life and higher production volumes in the ongoing DFS. It is anticipated that work thus far will have a materially positive impact on DFS results.

Blencowe has also completed 8 geotechnical holes for pit slope assessment, with samples now being tested in South Africa.

 

All drilling on the in-fill resources upgrade is completed. The third rig will commence on additional resource extensions to the Northern Syncline (Western Limb) and the new southern GT-01 target, both of which are in Stage Three (new exploration) of the program.

Meanwhile, the Company has commenced construction of a permanent on-site exploration camp, with prefabricated units imported from Turkey now being installed. This tangible step demonstrates visible project advancement to key stakeholders, including the Ugandan Government.

 

Executive Chairman Cameron Pearce commented:

"This latest drilling program continues to progress well, with both geotechnical and infill drilling now completed. We are encouraged by the consistent, high-quality graphite being intersected, and excited to begin testing new targets at Northern Syncline and GT-01.

Independent estimates suggest Orom-Cross deposit could hold 2-3 billion tonnes of graphite. While we don't need to drill all this out at once it does show that we have scale, and we know our graphite quality is very high so future demand will always be there. This scale means we can drill out additional Resources and Reserves in the future to meet accelerated demand forecast as the energy transition gathers pace. 

With high-quality product, scale, and a fast-track development strategy, Orom-Cross is increasingly standing out as one of the most compelling graphite projects globally."

 

Figure 1: 2025 drilling campaign at Orom-Cross

 

 

 

Figure 2: day-night drilling campaign at Orom-Cross

 

Figure 3: Logging core samples at Orom-Cross

For further information please contact:

 

For further information please contact:

Blencowe Resources Plc

www.blencoweresourcesplc.com

Sam Quinn

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha.sethi@blencoweresourcesplc.com

 

 

Tavira Financial

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

Twitter 

www.twitter.com/BlencoweRes

 

LinkedIn 

www.linkedin.com/company/blencowe-resources/

 

 

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is completing the Definitive Feasibility Study phase shortly as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFLFETVSIIVIE
Date   Source Headline
17th Jan 20221:00 pmRNSConsolidated Africa Holding & Joint Broker
13th Jan 20227:00 amRNSAppointment of Battery Limits
17th Dec 20211:04 pmRNSIssue of Options
16th Dec 20217:00 amRNSGraphite Sales and Marketing Expert Appointed
10th Dec 20213:35 pmRNSPublication of a Prospectus
8th Dec 202110:11 amRNSResult of General Meeting
8th Dec 20218:28 amRNSWebinar Call
15th Nov 202111:56 amRNSAMENDED Notice of General Meeting
15th Nov 202111:37 amRNSNotice of GM
12th Nov 20218:33 amRNSOver-Subscribed £2m Capital Raise
4th Oct 20217:00 amRNSCorporate Presentation
29th Sep 20217:00 amRNSOrom Cross PEA
20th Sep 20217:00 amRNSOrom Cross Update
17th Sep 20219:19 amRNSTR-1: Standard form notification of major holdings
16th Aug 20217:00 amRNSSecond Drilling Program at Orom-Cross Project
20th Jul 20212:01 pmRNSInvitation to Webinar
14th Jul 20217:00 amRNSIssue of Equity
13th Jul 20217:34 amRNSResults of Metallurgical Test Work
5th Jul 20217:00 amRNSDrill Program Ahead of Schedule
24th Jun 20214:00 pmRNSTR-1: Standard form notification of major holdings
2nd Jun 20219:54 amRNSHalf-year Report
1st Jun 20217:00 amRNSTR-1: Standard form notification of major holdings
24th May 20217:00 amRNSMetallurgical Test Work
19th May 202111:34 amRNSUpdated Corporate Presentation
14th May 202112:00 pmRNSTransaction in Shares
4th May 20217:00 amRNSStage Two Drilling Program Commences
29th Apr 20212:12 pmRNSDirector/PDMR Shareholding
26th Apr 20211:26 pmRNSHolding(s) in Company
13th Apr 20217:30 amRNSInvestor Webinar
13th Apr 20217:00 amRNSMaiden JORC Mineral Resource
7th Apr 20212:30 pmRNSWarrant Exercise
31st Mar 202110:08 amRNSResult of AGM
24th Mar 202111:30 amRNSWarrant Exercise
8th Mar 20214:30 pmRNSNotice of AGM
1st Mar 20217:00 amRNSDrilling Results
12th Feb 20217:00 amRNSTR-1: Standard form notification of major holdings
8th Feb 20212:12 pmRNSWarrant Exercise
8th Feb 20217:07 amRNSDrilling Results at Camp Lode
26th Jan 20217:00 amRNSAnnual Financial Report
22nd Jan 20211:07 pmRNSInvestor Conference Call
18th Jan 20217:00 amRNSPlacing to Raise £500,000
16th Dec 20207:00 amRNSPlacing to Raise £300,000
9th Dec 20209:52 amRNSTR-1: Standard form notification of major holdings
1st Dec 202011:01 amRNSBlock Listing Application Update
27th Nov 202012:11 pmRNSBlock Listing Application Update
26th Nov 20207:16 amRNSJORC Resource Update
25th Nov 20201:59 pmRNSBlock Listing Application & Issue of Equity
23rd Nov 20207:00 amRNSDirector Warrant Exercise and Purchase of Shares
5th Nov 20207:00 amRNSPublication of New Research Note
14th Oct 20202:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.