Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resou. Regulatory News (BRES)

Share Price Information for Blencowe Resou. (BRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.05
Bid: 4.70
Ask: 5.40
Change: 0.05 (1.00%)
Spread: 0.70 (14.894%)
Open: 5.00
High: 5.05
Low: 5.00
Prev. Close: 5.00
BRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Camp Lode Drilling Results

31 Jan 2022 07:00

RNS Number : 0597A
Blencowe Resources PLC
31 January 2022
 

31 January 2022

Blencowe Resources Plc("Blencowe" or the "Company") 

Blencowe confirms Near Surface High-Grade Camp Lode at Orom-Cross Project

Blencowe is pleased to provide a further update to the comprehensive JORC Resource diamond drilling program that was completed in 2021 on its Orom-Cross Graphite Project in Northern Uganda

 

 

Highlights

· Drilling at Camp Lode delivers consistent outstanding high grade graphite results in the oxide zone including:

o OREA-L1302, 11 metres at 9.73%TGC from 3 metres including 6 metres at 10.97%TGC

o OREA-L1401, 5 metres at 10.30% TGC from surface

o OREA-L1501, 14 metres at 11.81% TGC from 4 metres

o OREA-L701, 19 metres at 9.78%TGC from 2 metres

o OREA-L1201, 17 metres at 10.35% TGC from 2 metres including 7m @12.21% TGC

o OREA-L401, 19 metres at 9.49% TGC from surface

 

· These results will form part of an updated JORC Standard Mineral Resource Estimate and Reserve Determination for the Orom-Cross project scheduled for late February 2022

 

Blencowe Resources Plc ("Blencowe Resources") (LSE: BRES) is pleased to announce exceptional high-grade drilling results at the Camp Lode deposit which forms part of the Orom-Cross project.

These results will allow the Company to bring Camp Lode into the wider Orom-Cross JORC Resource and Reserve Estimate update scheduled to be released in February 2022.

Camp Lode Resource Drilling

The results, which come from the weathered, close-to or at-surface zone of the Camp Lode deposit, highlight the quality of the project's mineralisation and ultimately its ability to be a low-cost producer.

The drilling targeted both infill zones and strike extensions to existing high-grade oxide mineralisation. The spectacular near-surface intercepts confirm the geological interpretations as well as grade continuity over the strike length of the Camp Lode.

The Camp Lode Deposit has been subjected to a diamond drill hole program on a 25 metre by 12.5 metre grid. The drilling was designed to provide sufficient information to enable the classification of Resources at the Camp Lode into the indicated category and enable a Resource Estimate on the Camp Lode to be reported and to qualify the initial production area for the deposit as a high-grade supplement to the main Northern Syncline deposit.

Northern Syncline Resource Drilling

Blencowe Resources continues to receive the sample assays for the additional 24 diamond drill hole program undertaken on the Northern Syncline Lode and QA/QC checks are expected to be completed shortly enabling the company to proceed to finalising the Orom-Cross JORC Resource Estimate.

The holes to date have returned visible grade graphite over the majority of 30m of intersection, with weathering extending to within 5m of the base of the holes in most cases. This may present Blencowe with a high-grade ore for initial mining which could have significant advantages to both mining costs and product quality.  Subsequent logging by company geologists has also identified zones of large to jumbo flakes in the core.

The core has been assayed at SGS in Perth, Western Australia using the method C-IR18. The method is appropriate for understanding graphite deposits and is a total method.

 

Executive Chairman, Cameron Pearce commented;

"We have always believed that Camp Lode offered us a very valuable source of graphite to mine in the initial phase of development. The latest drill results at Camp Lode will allows us to add new high grade resources to the wider project. We are finalising resource estimation work at the Northern Syncline and look forward to releasing the updated JORC Resource for the Orom-Cross project.

 

The updated JORC Resource will be used for developing the mine and we continue to see buoyant demand for graphite given the growth of the EV market. We are working hard to build Orom-Cross into a valuable mine that can deliver significant tonnes of high quality end-product into several key markets."

 

 

For further information please contact:

 

Blencowe Resources Plc

Sam Quinn

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Securities Limited

Jonathan Evans

Tel: +44 (0)20 7100 5100

jonathan.evans@tavirasecurities.com

 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

 

 

 

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger coarse flakes within the deposit. A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is moving into the studies phase shortly as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 16.3Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLDBLFXLFLZBBZ
Date   Source Headline
4th May 20209:29 amRNSDrill Programme to Restart at Orom-Cross Project
30th Apr 20205:31 pmRNSHolding(s) in Company
30th Apr 20203:58 pmRNSInitiation Report
28th Apr 20207:00 amRNSAcquisition of the Orom-Cross Graphite Project
23rd Apr 202010:42 amRNSResult of AGM
30th Mar 20204:37 pmRNSPublication of Prospectus & Notice of AGM
30th Jan 20202:54 pmRNSAnnual Financial Report
22nd Jan 20209:27 amRNSConditional Placing and Acquisition Update
28th Oct 20194:19 pmRNSAcquisition of the Orom Graphite Project in Uganda
30th Aug 20197:00 amRNSHalf-year Report
13th May 20197:30 amRNSSuspension - Blencowe Resources Plc
13th May 20197:30 amRNSProposed Acquisition Of Orom Graphite Project
23rd Apr 20197:00 amRNSHolding(s) in Company
18th Apr 20197:00 amRNSAdmission to Trading and First Day of Dealings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.