Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
8.10    0.06 (0.75%)
Bid:
7.90
Ask:
8.30
Spread: 0.40 (5.063%)
Market Cap: £39.85m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

Bulk Sampling Completed

4 Sep 2023 07:00

RNS Number : 2006L
Blencowe Resources PLC
04 September 2023
 

4 September 2023

Blencowe Resources Plc

 

 

Completion of 100t Bulk Sample underlines high quality graphite product from Orom-Cross

 

Highlights:

· Blencowe has now successfully completed critical pre-qualification metallurgical test work with 100t bulk sample works concluded in China.

· Commercial scale results continue to confirm that a high-grade, low impurity concentrate (95-97% TGC) can be delivered from Orom-Cross graphite project in Uganda.

· Increased coarse flake percentage of final mix, together with higher recoveries, will increment the overall weighted average selling price of the Orom-Cross basket of end products.

· Blencowe now has a considerably larger volume of concentrate product to send to potential end users for further pre-qualification testing.

· Positive feedback received from end users on Blencowe's high-quality 95-97% TGC product with significant interest from established Chinese industry groups in progressing offtake arrangements.

 

Blencowe Resources Plc ("Blencowe" or the "Company"), is pleased to announce that additional metallurgical test work on its Orom-Cross graphite project in Uganda has now been completed by leading graphite technical specialist laboratory, Jilin New Technology ("Jilin") based at Yanji in Northern China, following our recent update on 14 August 2023.

 

This metallurgical test work is critical to understanding the commercial scale process plant components, the quality of the end-product that Orom-Cross can deliver as a high-grade graphite concentrate as well as the flake sizing yield, and the operability of a process plant at Orom-Cross. The 100t bulk sample also provides significantly greater quantum of end product for end user testing which is critical for the Definitive Feasibility Study.

 

Executive Chairman Cameron Pearce commented:

 

"We are very pleased with these results from the 100 tonne bulk sample program. We utilized the services of a very experienced graphite plant operator at Jilin for the pilot testing as we believed this party's extensive knowledge over decades in the industry would deliver superior net concentrate results, and I delighted to say they have delivered us a great outcome."

 

Mr Pearce added: "We now have proof we can deliver a very high quality graphite concentrate from Orom-Cross on a commercial scale, which is a key DFS milestone. In parallel we are testing the upgrade of this concentrate to uncoated battery-ready 99.95% SPG (spheronised, purified graphite) and expandables as the next important step to significantly value-add our end products. 

 

Finally, we also now have larger quantities of concentrate as bulk samples to deliver to potential buyers and engage with strategic groups. These groups can now proceed to test the concentrate and determine their level of interest for binding offtake agreements which will be crucial for our project financing. We believe these results will be attractive to a range of graphite consumers and that Orom-Cross can help deliver the shortfall of graphite expected in the market in the foreseeable future."

 

Background to the Test Work

 

Blencowe commissioned Jilin New Technology in partnership with Wuhan University to undertake metallurgical test work on a 100t bulk sample which covered material from both the Northern Syncline and Camp Lode areas within Orom-Cross. The pilot plant program was designed to deliver the following objectives:

 

1. Confirm the commercial scale viability of processing the Orom-Cross ores.

2. Confirm a 95-97% TGC (Total Graphite Content) pure concentrate is possible with low impurities (in particular thorium and vanadium).

3. Confirm the laboratory testing models.

4. Confirm the liberation process in order to maintain a majority of Jumbo/XL/Large flakes within the concentrate.

5. Confirm the process flow diagram for the pilot plant design as part of the Definitive Feasibility Study.

6. Deliver significant quantum of bulk concentrate to allow Blencowe to initiate discussions with potential off-take partners.

Blencowe is pleased to announce that the pilot plant process has successfully delivered on all of the above objectives.

 

The optimisation of the process (on the basis of the previous laboratory testing) has been very successful with the pilot plant methodology further improved and able to deliver a shorter overall processing of the ore, whilst improving the metrics of the concentrate delivered.

 

A shorter processing cycle has the benefits of lower capital expenditure and lower operating costs, both of which will enhance the overall Orom-Cross project financials.

 

The streamlined processing design has also realised increased recoveries of the more valuable larger +50mesh flake from 6.5% to 9.5% yield (within overall basket of end products), whilst increasing overall large flake yield by approximately 2% and increasing overall concentrate recoveries to over 94%. Again, this will add further value to the project financials.

 

The additional metallurgical test work to date shows a robust flowsheet capable of repeatable metallurgy for a wide range of feed samples from Orom-Cross, which will now be used directly for reference in the actual concentrator engineering design for the Definitive Feasibility Study.

 

 

For further information please contact:

 

 Blencowe Resources Plc

 Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Securities 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavirasecurities.com

 

First Equity Limited

Jason Robertson

Tel: +44(0)20 7330 1833

jasonrobertson@firstequitylimited.com

 

 

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

 

Background

 

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with an estimated 2-3 billion tonnes deposit and a high component of more valuable larger flakes within the deposit.

 

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe has moved through Pre-Feasibility and into the Definitive Feasibility Study phase as it drives towards first production.

 

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUORRRORUKRUR
Date   Source Headline
23rd Oct 202510:48 amRNSExercise of Warrants
21st Oct 20257:00 amRNSFurther Drilling Results - Camp Lode
17th Oct 202511:08 amRNS-RInterview with CEO Mike Ralston -DFS Progress
17th Oct 20257:00 amRNSFurther Battery Testing Success
15th Oct 20255:00 pmRNSHolding(s) in Company
8th Oct 202512:24 pmRNSExercise of Warrants
3rd Oct 20257:00 amRNSIssue of DFC Performance Shares and DFS Options
1st Oct 20251:19 pmRNSExercise of Warrants
26th Sep 20259:04 amRNSHolding(s) in Company
25th Sep 20257:00 amRNSDrilling Results
23rd Sep 20257:00 amRNSHolding(s) in Company
12th Sep 20257:00 amRNSFundraise of £1.12m and Exercise of Options at 6p
10th Sep 20257:00 amRNS-RUpdated Corporate Presentation
4th Sep 20257:00 amRNSAppointment of Project Finance Adviser
22nd Aug 20257:00 amRNSCompletion of Orom-Cross DFS Programmes
12th Aug 20257:00 amRNSIssue of Equity
1st Aug 20257:00 amRNSOfftake Agreement Signed
30th Jul 20257:00 amRNSExercise of Warrants
17th Jul 20257:00 amRNSStage 7 Drill Program Completed
8th Jul 202510:48 amRNSExercise of Warrants
8th Jul 20257:00 amRNSReceipt of US$0.75 million from DFC
2nd Jul 20257:00 amRNSDeep Drilling at Northern Syncline
26th Jun 20257:00 amRNSStage 7 Drilling Program Update
13th Jun 20257:00 amRNSSAFELOOP Testing Update
2nd Jun 20253:56 pmRNSInterim Consolidated FS Six Month End 31 Mar 2025
23rd May 20257:00 amRNSFurther US$0.5M Grant Funding Received From DFC
22nd May 20259:36 amRNSHolding(s) in Company
21st May 20257:00 amRNS-RInterview with CEO
7th May 20257:00 amRNSStage 7 Drill Program Nears Completion
22nd Apr 20254:43 pmRNSResults of Retail Offer - Replacement
16th Apr 20258:14 amRNSResults of Retail Offer
15th Apr 20254:40 pmRNSRetail Offer to Raise up to £100,000
15th Apr 20254:35 pmRNSFundraise of £1m to support completion of the DFS
8th Apr 20257:39 amRNSOfftake Agreement with TaiDa
31st Mar 20257:00 amRNSDrilling Update
21st Mar 20257:00 amRNSESIA Approval
19th Mar 20257:00 amRNSOfftake for Purified Graphite
3rd Mar 20257:00 amRNSAFC Expression of Interest
26th Feb 20254:32 pmRNSResult of AGM
20th Feb 20257:00 amRNSHydropower Study
14th Feb 20257:00 amRNS7,000m Drilling Programme
31st Jan 20258:56 amRNSAnnual Financial Report
30th Jan 20257:00 amRNSSAFELOOP Update
28th Jan 20257:00 amRNS-RWebinar 25 February 2025
9th Jan 20257:00 amRNSCommencement of Drilling
19th Dec 202411:02 amRNSResult of Meeting
10th Dec 202410:04 amRNS-RUpdated Corporate Presentation
9th Dec 20247:00 amRNSExercise of Warrants
28th Nov 20247:00 amRNSBlencowe Joins European EV Consortium
26th Nov 202412:12 pmRNSPublication of a Prospectus

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.