Adam Davidson, CEO of Trident Royalties, discusses offtake milestones and catalysts to boost FY24. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.00 (0.00%)
Spread: 0.05 (16.667%)
Open: 0.325
High: 0.325
Low: 0.325
Prev. Close: 0.325
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

First Drilling Completed at Vutomi Project

6 Apr 2017 07:00

RNS Number : 7188B
Botswana Diamonds PLC
06 April 2017
 

6th April 2017

 

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

First Drilling Programme Completed at Vutomi Project

 

Botswana Diamonds plc, the AIM listed diamond explorer (AIM: BOD) has completed the first phase of drilling at the flagship Vutomi project in Frischgewaagt, 280km north of Johannesburg.

 

Highlights:

 

v 34 percussion and 9 diamond drill holes drilled completed on the kimberlite dyke

v Two "blows" discovered on the kimberlite dyke system from this drill programme

v High interest olivines, G10 and G9 garnets recovered

v Samples submitted for microdiamond analysis, results are expected within two months

v The geology is very similar to the high value Marsfontein mine, located 20km away

v Another round of drilling to be completed in April/May will identify the area for bulk sampling

v Modelled per carat value of US$259/ct on diamonds recovered from earlier drilling

 

John Teeling, Chairman, commented "Frischgewaagt is turning into a very exciting project. What we see in the drilling we like. To date we have discovered two "blows" on the kimberlite dyke system. We are moving to delineate the size of each one. The drilling samples contain high quantities of diamond indicator minerals of similar profile to the highly profitable Marsfontein mine some 20km away.

 

In the next two months we should have results from the microdiamond analyses and further information on the size and composition of the kimberlite dykes."

 

Further information:

 

The purpose of this first phase of drilling was to increase the geological confidence in the c. 6km long kimberlite dyke/blow system, which is east of, and on strike with, the former De Beers / Southern Era operated Marsfontein Mine. Marsfontein was operated for two years in the late 1990's with economics which allowed the entire capital cost to be recouped in under four days. Marsfontein's run of mine grade was 172cpht at a bottom cut off of +1.2mm.

 

34 percussion holes (totalling 1,459m) and 9 diamond drill holes (totalling 432m) have been drilled along a 1,580m strike length of the c. 6km dyke/blow complex. The width of the kimberlite dyke/blow system is between 1.0 and 2.7m with two wider areas or "blows" identified. To test the vertical continuity of the system, a single 104m hole was drilled chiefly in kimberlite. Petrographic analysis of the samples has resulted in classification of the dyke as a Group 2 Olivine Phlogopite rich magmatic kimberlite with the blows being volcanoclastic kimberlite. The size and abundance of olivines which are diamond indicator minerals is very positive.

 

A population of over 200 garnets have been microprobed with 38 probed as G10 (Harzburgitic paragenesis) and 17 as G10D (diamond inclusion garnets). A total of 18 garnets have been probed as Group 1 Eclogitic type which suggests a strong Eclogitic diamond paragenesis. The remaining garnets are high interest G9 along with some megacrysts. These G10 and G9 garnets are important diamond indicators and have similar mineral chemistry to the nearby Marsfontein Mine. A 200-kg core sample has been consigned for microdiamond analyses with results available within two months.

 

In previous work, 467 diamonds yielding 247 carats were recovered from the processing of surface material. The largest diamond was 3.66 carats and the parcel had an average size of 0.53cts/stone. The sale of these diamonds achieved a rough diamond value of US$180/ct and a modelled value of US$259/ct at a bottom cut off of +2mm.

 

Detailed ground geophysical test work has also been undertaken by Geofocus to determine the most effective technique to delineate the further lateral extension of the system. This work will select targets to be drilled during April and May. The results of the next drilling phase will determine the areas of Frischgewaagt, which will be subject to bulk sampling.

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the South African Institute of Mining and Metallurgy, a Fellow of Materials, Metals and Mining with over 31-years' experience in the diamond sector.

 

ENDS

 

 

Enquiries:

 

Botswana Diamonds PLC

John Teeling, Chairman

+353 1 833 2833

James Campbell, Managing Director

+27 83 457 3724

Jim Finn, Director

Northland Capital Partners Limited

David Hignell/Gerry Beaney (Corporate Finance)

+44 (0) 203 861 6625

John Howes (Broking)

Dowgate Capital Stockbrokers Limited

Jason Robertson

+44 (0) 129 351 7744

Blytheweigh

+44 (0) 207 138 3204

Camilla Horsfall

+44 (0) 781 784 1793

Nick Elwes

+44 (0) 783 185 1855

Kristina Kazerani

+44 (0) 207 138 3206

Rachael Brooks

PSG Plus

Ciaran Flynn

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

www.botswanadiamonds.co.uk

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEASLSELLXEFF
Date   Source Headline
30th Mar 20209:00 amRNSPrice Monitoring Extension
25th Mar 202010:56 amRNSInterim Statement and Financial Results
18th Mar 20207:00 amRNSBulk sampling to commence on Marsfontein
2nd Mar 20205:01 pmRNSTotal Voting Rights
24th Feb 202012:27 pmRNSKimberlite intersected on Marsfontein
11th Feb 20201:13 pmRNSDrilling on Thorny River & Marsfontein Concessions
5th Feb 20202:51 pmRNSAppointment of Joint Broker
28th Jan 20207:00 amRNSPlacing to raise £250,000
12th Dec 201912:30 pmRNSResult of AGM
29th Nov 20194:54 pmRNSTotal Voting Rights
28th Nov 20197:00 amRNSZimbabwe Update
18th Nov 20194:49 pmRNSExercise of Warrants
15th Nov 20197:00 amRNSAnnual Results for the Year Ended 30 June 2019
12th Nov 201911:18 amRNSFirst diamonds recovered from Marsfontein Permit
28th Oct 20197:00 amRNSMarsfontein Mining Permit Granted
24th Sep 20192:05 pmRNSSecond Price Monitoring Extn
24th Sep 20192:00 pmRNSPrice Monitoring Extension
24th Sep 20197:00 amRNSMarsfontein Mining Contract Signed
12th Sep 20197:00 amRNSEnvironmental Authorisation - Marsfontein Gravels
2nd Sep 20197:00 amRNSKimberlite Pipe Potential at Thorny River
22nd Aug 20197:00 amRNSStrategic Licences Extended in Botswanan Kalahari
5th Aug 20195:04 pmRNSChange of adviser (broker)
1st Aug 20193:30 pmRNSTotal Voting Rights
18th Jul 20199:49 amRNSPlacing to raise £250,000
11th Jun 201910:30 amRNSDiamonds recovered from Thorny River Bulk Sampling
4th Apr 20197:00 amRNSUpdate on Thorny River project development
25th Mar 20197:00 amRNSInterim Results for the 6 Months Ended 31 Dec 18
28th Feb 201910:27 amRNSUpdate on Thorny River project development
18th Feb 201910:12 amRNSIntensification drilling on Thorny River
14th Feb 20192:50 pmRNSMarange Diamond Fields Grant of Right to Mine
23rd Jan 20197:00 amRNSPlacing to raise £370,000
3rd Jan 20197:00 amRNSChange of Nominated Adviser
14th Dec 20183:31 pmRNSVast Resources plc - Marange Diamond Field
14th Dec 201812:45 pmRNSBotswana Diamonds PLC - Results of AGM
28th Nov 20183:25 pmRNSHolding(s) in Company
19th Nov 20187:00 amRNSAnnual Results for the Year Ended 30 June 2018
15th Nov 20187:00 amRNSUpdate on Sunland Minerals JV
7th Nov 20187:00 amRNSAdvancements Towards Diamond Production
30th Oct 20183:33 pmRNSHolding in Company
17th Oct 20187:00 amRNSInitial assessment of the T1A Marange concession
4th Oct 20187:38 amRNSDiamond Concession Development Agreement Reached
25th Sep 20187:00 amRNSFree State Kimberlite Exploration Project Update
23rd Aug 20189:30 amRNSAccess Awarded for Diamond Concession in Zimbabwe
31st Jul 20187:00 amRNSUpdate on South African Exploration Projects
11th Jul 20189:20 amRNSKalahari Desert Exploration Update
6th Jun 20187:00 amRNSUpdate on South African Exploration Projects
1st May 20187:00 amRNSMoU for Exploitation of Diamonds in Zimbabwe
21st Mar 20187:00 amRNSInterim Results for the 6 Months Ended 31 Dec 17
13th Mar 20187:00 amRNSDrilling commenced on Ontevreden Kimberlite Pipe
15th Feb 20187:00 amRNSThorny River Project - Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.