George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBluebird Mer Regulatory News (BMV)

Share Price Information for Bluebird Mer (BMV)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.60
Bid: 0.55
Ask: 0.65
Change: 0.00 (0.00%)
Spread: 0.10 (18.182%)
Open: 0.60
High: 0.60
Low: 0.60
Prev. Close: 0.60
BMV Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Receives Approval to Advance Batangas Gold Project

15 Jun 2023 07:00

RNS Number : 7869C
Bluebird Merchant Ventures Limited
15 June 2023
 

Bluebird Merchant Ventures Ltd / EPIC: BMV.L / Market: FTSE / Sector: Mining

15 June 2023

Bluebird Merchant Ventures Ltd ('Bluebird' or 'the Company')

Receives Local Community Approval to Advance Batangas Gold Project

 

Bluebird Merchant Ventures Ltd, a gold company primarily focused on bringing historic mines back into production, is pleased to announce that it has received the Certificate of Approval from the Mines and Geosciences Bureau (MGB) for its Two-Year Community Development Plan at its Batangas Gold Project ('Batangas' or 'the Project') in the Philippines. This represents a significant step forward and underlines the importance of the Company's local development partner in navigating the regulatory environment to allow the key project area at Batangas, the Lobo underground mine, to be advanced to a production decision. Importantly the Company already has two 25 year Mineral Production Sharing Agreements ("MPSA") covering the Lobo Project area.

 

Overview

· Community Plan Approval allows for groundwork including supplementary drilling to commence at the highly prospective Lobo project area.

· Demonstrates that the JV is proving successful, and the Project development plan adheres to the relevant protocols required by the new Philippine Government for mining development.

· Lobo has a JORC Compliant Ore Reserves of 171,000 tons at 6.6 g/t for 36,000 oz Au, an 82,000 oz Au inferred resource plus multiple epithermal and high-grade targets identified over 14km of identified mineralised structures.

· Grades include high-grade surface trench intersections of 8.35m @ 18.4 g/t Au, 2.6m @ 28.6 g/t Au and 3m @ 22.2 g/t Au.

· The JV will now implement plans to commence a new drilling campaign to increase the resource and develop potential underground mine plan and work with its environmental consultancy for the application of the Environmental Compliance Certificate.

· JV structure provides Bluebird with a free carry to production decision in return for 60% of the project equity.

 

Bluebird CEO Colin Patterson said, "The approval of the Community Plan is a significant step forward in the development plans for an underground gold mine at Lobo in the Philippines. The JV partner recognised the potential of the Project, with this news highlighting the key role it has in advancing the permitting process and building community relations. The JV will now execute its plan to advance Lobo towards a production decision, where the potential for a high-grade underground mine is clear. The Philippine Government is highly supportive of responsible mining opportunities, which contribute to the economic development of the country, and with a well-trained local workforce, excellent infrastructure, we believe fast-tracking this exciting project is highly achievable."

 

Details

The highly prospective Batangas Gold Exploration Project in the Philippines is being advanced within a joint venture with a Philippine company, which has decades of experience in mining (see RNS dated 7 February 2023). The JV covers the entire Batangas Project area, which has a current JORC compliant resource of 440,000 ounces, including a maiden ore reserve of 128,000 ounces (including silver credits).

 

The current focus of the JV and the two-year Community Development Plan is the Lobo underground mining operation. The Project has an initial Probable JORC Compliant Ore Reserves of 171,000 tons at 6.6 g/t for 36,000 ounces of gold excluding silver credits based primarily on the South West Breccia ('SWB') area of the licence that can be mined in the first 18 months of any operation. There is an Indicated resource of 82,000 oz au that is perceived as easily convertible. Additionally, the Lobo licence area has multiple epithermal and high-grade targets already identified for resource expansion with 14km of identified mineralised structures with grades including high-grade surface trench intersections yielded 8.35m @ 18.4 g/t Au, 2.6m @ 28.6 g/t Au and 3m @ 22.2 g/t Au. The Lobo underground mining operation is similar to Medusa Mining's Philippine project. 

 

Accordingly, a drill programme is being planned at Lobo and discussions are underway with drilling contractors. Furthermore, the Company's environmental consultancy is undertaking groundwork for the application of the Environmental Compliance Certificate, which is a key step towards obtaining a Mineral Production Sharing Agreement ('MPSA') with the Philippine National Government.

 

The granting of the Community Plan Approval is a significant step in the development plans for Batangas. The Administration of President Ferdinand R. Marcos, Jr. is focussing on improving mining standards in country. The Company's local JV partner understand the regulatory framework and is working closely with Bluebird to ensure that all Environmental, Social and Governance standards are adhered to, and the Project is developed for the benefit of all stakeholders.

 

**ENDS**

 

For further information please visit https://bluebirdmv.com or contact:

Colin Patterson Bluebird Merchant Ventures Ltd Email: colin@bluebirdmv.com

Nick Emmerson SI Capital Tel: 01483413500

 

About Bluebird

Bluebird Merchant Ventures Ltd (BMV.L) is a London listed South Korea-focused resources company centred on bringing historically producing gold mines back into production. The Company, led by a team of proven mine rehabilitation experts, currently has two 100% owned licensed high grade narrow vein mining projects, the Kochang Gold and Silver Project ('Kochang') and the Gubong Gold Project ('Gubong'), which each have a defined route to low cost/ low capex production with a cumulative target of producing 100,000 oz + Au per annum. 

 

The management team has invested cUS$2 million personally into the Company and believe, following analysis of historic production and exploration data, as well as extensive sampling, geological, geophysical, and engineering studies, there is potential for in excess of 1.5 million oz of mineable gold in its Korean projects alone.

 

Kochang is an epithermal vein deposit with parallel vertical ore bodies covering 8.3 sq km that reportedly produced 110,000 oz of gold and 5.9 million oz of silver between 1961 and 1975. Consisting of a gold and silver mine, there are currently four main veins and a number of parallel subsidiary veins vein which have been identified, as well as a newly identified cross-cutting vein. Historic drilling indicates the veins continue to depth below the current 150m mine and mapping shows the veins on surface providing potential above and below the old workings. The veins extend to the NE providing a strike length of 2.5km with 600m between the two mines not exploited. There is potential to expand operations to the southwest/northeast and to depth, as well as exploit the already mined areas. The total resource potential is between 550,000 and 700,000 tonnes, with a range of grades between 5.2 g/t to 6.6 g/t gold, and 27.3 g/t to 34.8 g/t silver. Following the granting of a Mountain Use permit, there is an estimated 6-to-9-month development time to trial mining.

 

Gubong, which was historically the second largest gold mine in South Korea has 9 granted tenements covering c.25 sq km. Gubong is moderately dipping with 9 veins extending 500m below surface and known to extend at least a further 250m. However, the production opportunity for Bluebird prior to looking at deepening the mine is the 25 levels already developed with all the remnants and unmined areas left by the original miners. The 25 levels extend over 120km in total length which indicates the size of the opportunity. The Korea Resources Corporation ('KORES') estimated 2.34M tonnes at some 7.3g/t Au garnered from 57 drill holes over 17,715.3 metres. With additional sampling, mapping, pit modelling and grade analysis, plus the fact that Gubong is an orogenic deposit, which typically have a depth of 2km compared to the current depth of 500m, the Board believe it has a geological potential of 1 million + oz Au in-situ, plus an estimated additional 300,000 oz Au from satellite ore bodies.

 

Additionally, the Company has the highly prospective Batangas Gold Exploration Project in the Philippines, where it has an agreement with a Philippine company, whose owners have decades of experience in mining, to develop the Project. The JV covers the entire Batangas Project area, which has a current JORC compliant resource of 440,000 ounces, including a maiden ore reserve of 128,000 ounces (including silver credits). Exploration expenditure to the tune of c.$20m has already been invested. Work is focused on completing Exploration and Environmental Work Programmes initially targeting the high-grade Lobo area, although there is excellent exploration potential across the licence with high-grade targets already identified and 14km of identified mineralised structures. The staged agreement is based on the JV partner achieving defined development goals and provides Bluebird with a free carry on the development of Batangas with a view to advancing to construction. 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKZGMVMKDGFZG
Date   Source Headline
2nd Apr 20247:00 amRNSJV model approach for South Korean gold mine
4th Mar 20247:00 amRNSEnvironmental Impact Study at Batangas to Commence
27th Feb 20247:00 amRNSTR-1 Notification
26th Feb 20247:00 amRNSResult of AGM
1st Feb 20247:00 amRNSNotice of AGM
15th Jan 20247:00 amRNSTR-1 Notification
10th Jan 20247:00 amRNSTR-1 Notification
5th Jan 20247:00 amRNSTR-1 Notification
22nd Dec 20237:00 amRNSTR-1 Notification
8th Dec 20237:00 amRNSTR-1 Notification
16th Nov 20237:00 amRNSProject Interview: Confidence Levels Increasing
27th Sep 20237:00 amRNSHigh Grade Lobo Gold Prospect To Be Drilled
4th Sep 20237:00 amRNSTR-1 Notification
29th Aug 20237:00 amRNSTR-1 Notification
29th Aug 20237:00 amRNSInterim Results
23rd Aug 20237:00 amRNSShare Purchase Agreement Removes Market Overhang
10th Aug 20237:00 amRNSTR-1 Notification
10th Jul 20237:00 amRNSSouth Korean Update
15th Jun 20237:00 amRNSReceives Approval to Advance Batangas Gold Project
10th May 20237:00 amRNSFurther re New Corporate Presentation
9th May 20237:00 amRNSNew Corporate Presentation
2nd May 20237:00 amRNSTR-1 Notification
26th Apr 20237:00 amRNSFinal Results
18th Apr 20237:00 amRNSTR-1 Notification
17th Apr 20237:00 amRNSSouth Korean Update
20th Mar 20237:00 amRNSFunds Received and Admission of Shares to Trading
6th Mar 202310:00 amRNSRaises £1.215m To Fund South Korean Gold Projects
28th Feb 20232:05 pmRNSSecond Price Monitoring Extn
28th Feb 20232:00 pmRNSPrice Monitoring Extension
27th Feb 20237:00 amRNSInitial Scoping Study: South Korean Gold Projects
7th Feb 20237:00 amRNSJV with Filipino Mining Group to develop Batangas
31st Jan 20237:00 amRNSResults of Annual General Meeting
16th Jan 20232:06 pmRNSSecond Price Monitoring Extn
16th Jan 20232:00 pmRNSPrice Monitoring Extension
16th Jan 20239:05 amRNSSecond Price Monitoring Extn
16th Jan 20239:00 amRNSPrice Monitoring Extension
9th Jan 20237:00 amRNSNotice of AGM
29th Dec 20227:00 amRNSQ&A with CEO Colin Patterson
8th Dec 20227:00 amRNSRaise to advance Korean projects and streaming
22nd Nov 20227:00 amRNSUpdate: South Korea Trip and Batangas Gold Project
7th Nov 20224:41 pmRNSSecond Price Monitoring Extn
7th Nov 20224:36 pmRNSPrice Monitoring Extension
31st Oct 20227:00 amRNSLand Secured for Temporary Mountain Use Permit
28th Oct 20227:00 amRNSInvestor Presentation on Investor Meet Platform
27th Oct 20227:00 amRNSWebsite Upgrade
6th Oct 20227:35 amRNSDirector Dealing
4th Oct 20227:00 amRNSLicence Extension Received: Batangas Gold Project
3rd Oct 202211:06 amRNSSecond Price Monitoring Extn
3rd Oct 202211:01 amRNSPrice Monitoring Extension
3rd Oct 20229:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.