Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlock Energy P. Regulatory News (BLOE)

Share Price Information for Block Energy P. (BLOE)

Share Price is delayed by 15 minutes
Get Live Data
0.975    0.00 (0.00%)
Bid:
0.95
Ask:
1.00
Spread: 0.05 (5.263%)
Market Cap: £14.33m
BLOE Live PriceLast checked at - London Stock Exchange

Intraday Block Energy P. Share Chart

West Rustavi Update and Board Changes

14 Dec 2018 07:00

RNS Number : 4568K
Block Energy PLC
14 December 2018
 

 

Block Energy Plc / Index: AIM / Epic: BLOE.L / Sector: Oil and Gas

14 December 2018

Block Energy Plc ("the Company", "Block" or "the Group")

Positive Flow and Pressure Test Results at West Rustavi field, Georgia,

and Board and Other Management Changes

 

Highlights

· 200 barrels of oil recovered during a 10 hour flowback on legacy well 16a at West Rustavi

· Achieved key milestone by mobilising and rigging up ZJ40 drilling rig at well 16a as part of the initial stage of a two well sidetrack drilling programme beginning in January targeting 650 bopd by Q1 2019

· Part of dual focused strategy at West Rustavi to restart oil production and re-test a legacy gas well that flowed up to 0.9 MMCF/D from the same geological formation being targeted by Schlumberger on neighbouring field

· Preparation of wellsite equipment to enable production and oil sales to commence as soon as drilling and completions operations at the first sidetrack have been completed

· The 650 bopd targeted at West Rustavi is in addition to the 250 bopd focus at Block's Norio field through an ongoing multi-well workover and sidetrack programme

 

Block Energy Plc, the exploration and production company focused on the Republic of Georgia, is pleased to announce that more than 200 barrels of oil were recovered from the legacy vertical well 16a at its West Rustavi permit during a 10 hour flow period. An additional 300 barrels of light oil flowed to a temporary wellsite production facility over the following days. The results of the test confirm the well lies in an active hydrocarbon system and that the previously producing Middle Eocene reservoir still contains reserves and remains pressurised. The Company will now move forward with its programme to restart production at the field via the drilling of two initial horizontal sidetracks in West Rustavi wells 16a and 38, targeting a combined gross production of 650 bopd by Q1 2019.

 

Block holds a 25% interest in West Rustavi as part of an agreed earn-in to 75%. In addition to holding 38 MMbbls of gross contingent resources ('2C') of oil, West Rustavi holds estimated gross 2C contingent gas resources of 606 BCF which it plans to test in 2019 by re-entering up to two wells that previously flowed gas. West Rustavi is one of three licences Block holds in Georgia, the others being a 100% interest in the producing Norio field, which has gross proven ('2P') oil reserves of 1.631 million barrels, and where a workover and sidetrack programme is underway targeting 250 bopd by Q1 2019; and a 90% interest in the Satskhenisi field, which has estimated 28 MMbbls of gross 2C contingent resources.

 

Block Energy Chief Executive Officer Paul Haywood said: "The recovery of more than 500 barrels of oil from the legacy vertical wellbore at West Rustavi 16a is highly encouraging and bodes well for our horizontal sidetrack programme at the field which is due to begin early next year. Having raised £5 million by the time of our IPO we are fully funded to undertake our work programmes at West Rustavi and Norio, which together target a combined 900 bopd net to Block by Q1 2019. With our existing production at Norio selling for Brent minus US$10, a production rate of 900 bopd has the potential to generate circa US$13 million in annual revenues at current oil prices, a level that far outstrips our existing £7 million market valuation. And we do not intend to stop at 900 bopd. With four more existing wells identified as suitable sidetrack opportunities at West Rustavi, an inventory of historic wells at Norio, and a potential 28 MMbblof contingent resources at Satskhenisi, the opportunity to significantly scale our cash flow further is clear.

 

"Block is not just focused on oil production. West Rustavi also holds an estimated 606 BCF of gross 2C contingent gas resources which we plan to test in 2019. With operating netbacks of around US$2.6/Mcf at current Georgian gas prices of US$5.5/Mcf, and assuming a first phase of gas development producing gross 30 MMCF/D, gas production at West Rustavi has the potential to deliver net annual cash flows of more than US$20 million."

 

Further Information

Following confirmation of the presence of oil and pressure at West Rustavi 16a, the ZJ40 drilling rig has been mobilised and rigged up at the drill site. The rig, which has undergone a comprehensive inspection and upgrade, is expected to spud the Company's first horizontal sidetrack in early Q1 2019. Wellsite production equipment is currently being prepared to ensure rapid oil production once drilling and completion operations at 16a have been carried out. With all relevant permissions already in place, 16a is forecast to commence production as early as Q1 2019, subject to positive results from the sidetrack.

 

Civil works are already underway at West Rustavi 38, the second of the field's wells to be sidetracked. Four other wells have been identified as suitable for re-entry and sidetracking, each of which has the potential to produce at a rate of more than circa 325 bopd. The Company also plans to acquire 3D seismic data for the licence area to identify additional drilling targets in both the oil-bearing Middle Eocene and the gas bearing Lower Eocene and Upper Cretaceous. Preliminary 3D seismic acquisition design has been completed and will go to tender next year.

 

In tandem with the sidetrack programme at West Rustavi, the Company is planning to workover two of the field's other wells in order to test the potential of the Lower Eocene gas zones. Previous well tests achieved rates of up to 0.9 MMCF/d from the Lower Eocene and 1.6 MMCF/d from the Upper Cretaceous. Subject to the results of the tests, the Company will aim to swiftly finalise a field development plan and gas sales contracts and install a gas production infrastructure.

 

Board and other management changes

The Company also announces that Serina Bierer will be stepping down as Finance Director and from the Board of the Company as of June 2019. The Board has appointed Orana Corporate ('Orana'), a London based outsourced finance company to strengthen the finance function and to report to the Board. Orana will cover Block's London headquarters and also the finances of its operations in Georgia. Serina will be assisting Orana during the handover process. The Board would like to thank Serina for her work during the IPO process and wish her well for the future.

 

 

Roger McMechan, Technical Director, has reviewed the reserve, resource and production information contained in this announcement. Mr McMechan is a BSc, Engineering from the University of Waterloo, Canada and is a Professional Engineer registered in Alberta.

 

This announcement contains inside information which is disclosed in accordance with the Market Abuse Regulation which came into effect on 3 July 2016.

 

**ENDS**

 

For further information visit www.blockenergy.co.uk or contact:

 

Paul Haywood

Chief Executive Officer

Block Energy Plc

Tel: +44 (0) 20 3053 3631

Neil Baldwin

(Nominated Adviser)

Spark Advisory Partners Limited

Tel: +44 (0) 203 368 3554

Craig Fraser

(Joint Corporate Broker)

Baden Hill, a trading name of Northland Capital Partners ltd.

Tel: +44 (0) 20 7933 8731

Colin Rowbury

(Joint Corporate Broker)

Novum Securities Ltd

Tel: +44 (0)207 399 9427

Frank Buhagiar / Juliet Earl

(Financial PR)

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

 

Notes:

Block Energy (BLOE.L) is an AIM quoted oil and gas company with a growing portfolio of production, development and exploration assets in the Republic of Georgia. Block holds a 100% Working Interest ('WI') in the producing Norio licence, a 90% WI in the producing Satskhenisi licence and a 25% WI in the West Rustavi licence with the right to farm-in to up to a 75% WI. Block's three licences lie in the heart of Schlumberger's 100% held position in the Kura basin, which at its peak produced circa 70,000 bopd in Georgia and is estimated to hold over seven billion barrels of proven reserves in Azerbaijan and North Caucasus (Russia).

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCFFEFADFASESE
Date   Source Headline
4th Jun 20267:00 amRNSPosting of Annual Report and Notice of AGM
1st Jun 20267:00 amRNSFinal Results
27th May 20267:00 amRNS-RInvestor Presentation
26th May 20267:00 amRNSHolding(s) in Company
20th May 202610:49 amRNSHolding(s) in Company
18th May 202611:53 amRNSResult of General Meeting
29th Apr 202611:44 amRNSPosting of Circular
28th Apr 20267:00 amRNSResult of Bookbuild and WRAP Retail Offer
27th Apr 20265:13 pmRNSWRAP Retail Offer for up to £150,000
27th Apr 20265:04 pmRNSStrategic Entry into Offshore Gabon
14th Apr 20267:00 amRNSBinding Framework Agreement - Project III Farm Out
3rd Mar 20267:00 amRNSHolding(s) in Company
23rd Feb 20267:00 amRNSBonus Shares, Options, PDMR Dealings and Holding
16th Feb 20267:00 amRNSCompletion of CCS Pilot Study
29th Jan 20267:00 amRNSLoan Facility & Related Party Transactions
19th Jan 20267:00 amRNSProject IV (XIQ) Farm-out Completion
22nd Dec 20257:00 amRNSPhase 1 CCS Results
22nd Dec 20257:00 amRNSPhase 1 CCS Results
17th Dec 20257:00 amRNSCapital Structure Simplification Equity Issue
12th Dec 202512:14 pmRNSResults of General Meeting
11th Dec 20257:00 amRNSHolding(s) in Company
8th Dec 20257:00 amRNSProject III Farmout Update
25th Nov 202511:28 amRNSNotice of GM
21st Nov 20257:47 amRNSHolding(s) in Company
17th Nov 20257:00 amRNSHolding(s) in Company
17th Nov 20257:00 amRNSHolding(s) in Company
14th Nov 20257:00 amRNSCapital Structure Simplification
6th Nov 20257:00 amRNSFundraise and Operations Update
24th Sep 20257:00 amRNSHalf-year Report
19th Sep 20257:00 amRNSSpud of KRT-39ST
4th Sep 20257:00 amRNSFarmout of licence XIQ (part of Project IV)
26th Aug 20257:00 amRNSCCS Pilot Injection
12th Aug 20257:00 amRNSOperations Update
25th Jun 202512:29 pmRNSResult of AGM
28th May 202512:00 pmRNSNotice of AGM
22nd May 20257:02 amRNSExercise of Options and Issue of Shares
22nd May 20257:00 amRNSFinal Results
15th May 202510:25 amRNSHolding(s) in Company
15th May 202510:24 amRNSHolding(s) in Company
14th Apr 20257:00 amRNSCCS Project Update
27th Mar 20257:00 amRNSAcquisition
17th Mar 20257:00 amRNSOperations Update
10th Feb 20252:43 pmRNSHolding(s) in Company
7th Feb 20257:00 amRNSDirector/PDMR Shareholding
26th Nov 20247:00 amRNSCCS Update
30th Sep 20247:00 amRNSHalf-year Report
31st Jul 20247:00 amRNSTrading Statement
20th Jun 20243:46 pmRNSResults of Annual General Meeting
7th Jun 20241:55 pmRNSHolding(s) in Company
30th May 20247:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.