Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlock Energy P. Regulatory News (BLOE)

Share Price Information for Block Energy P. (BLOE)

Share Price is delayed by 15 minutes
Get Live Data
1.025    -0.025 (-2.38%)
Bid:
0.95
Ask:
1.10
Spread: 0.15 (15.789%)
Market Cap: £15.06m
BLOE Live PriceLast checked at - London Stock Exchange

Intraday Block Energy P. Share Chart

Drilling Update

12 Nov 2021 07:00

RNS Number : 1608S
Block Energy PLC
12 November 2021
 

12 November 2021

Block Energy plc

("Block" or the "Company")

2021 Drilling Campaign Update

 

Highlights

· Following the interim installation of a rod pump, WR-B1a is currently producing 50 bopd.

· The second well of the campaign, the fully-funded side-track of JKT-01, is due to spud before the end of November.

· Following intensive analysis of Block's 3D-seismic-survey, the JKT-01 horizontal hole will be drilled at a different orientation to that of WR-B1a.

· Post JKT-01, a low-cost side-track will be drilled from WR-B1a to increase production to forecast levels.

 

Well WR-B1a

Block Energy plc, the development and production company focused on Georgia, announces that, following the interim installation of a rod pump, well WR-B1a has produced an average of 50 bopd over the last eight days. At this rate and current oil price, WR-B1a will generate $1.0 million cash revenue to the Company per year. This is in addition to baseline production as detailed in the Q3 Operational Update (Link https://www.londonstockexchange.com/news-article/BLOE/q3-operational-update/15164242).

A rod pump was installed on WR-B1a for the clean-up operations. Following the side-track of JKT-01, downhole operations at WR-B1a will resume with a low-cost side-track from the same well bore. It will target significant fractures and faults, newly identified from attribute analysis of the 3D-seismic survey, at a higher level within the Middle Eocene reservoir. The attribute analysis has been recalibrated from the significant amounts of data acquired through drilling WR-B1a.

WR-B1a was deliberately drilled into a less fractured zone in an attempt to produce more stable oil production rates, and to minimise water production. However, this resulted in oil production also being below targeted levels, and the attribute analysis provides some possible reasons why this may have occurred. This greater understanding of the reservoir has informed the placement of the JKT-01 wellbore, in order to change the orientation to target the larger fractures observed in the attribute analysis.

Well JKT-01

 

Well JKT-01 side-track is fully-funded and on target to commence drilling in the second half of November. The drilling rig is on the newly refurbished wellsite, and undergoing a final planned rehabilitation before drilling operations commence. Analysis of the production data indicates that a volume of some 8 million barrels of oil is present in this area of the reservoir.

 

For a more detailed explanation of the lessons learnt from the drilling of WR-B1a, and how the board of directors believes they increase the chance of success at JKT-01, please see the presentation available at the following link:

https://www.voxmarkets.co.uk/articles/block-energy-discuss-their-latest-technical-drilling-update-2fb7448

Block Energy plc's Chief Executive Officer, Paul Haywood, said:

"Well WR-B1a has not so far produced at the forecast rate, but we have leveraged the new data gathered from the well to greatly enhance the potential production rates from JKT-01 and subsequent wells. Our technical team's new attribute analysis also supports the plan to return to WR-B1a, aimed at delivering production more in-line with initial expectations. I encourage you all to watch the video by Stephen James, our in-house expert on fractured reservoirs."

Jonathan Bedford (Block's Technical Manager) has reviewed the reserve, resource and production information contained in this announcement. Mr Bedford has an MSc in Petroleum Geoscience from the University of Aberdeen and is a petrophysicist.

**ENDS**

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS STIPULATED UNDER THE UK VERSION OF THE MARKET ABUSE REGULATION NO 596/2014 WHICH IS PART OF ENGLISH LAW BY VIRTUE OF THE EUROPEAN (WITHDRAWAL) ACT 2018, AS AMENDED. ON PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE, THIS INFORMATION IS CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

For further information please visit http://www.blockenergy.co.uk/ or contact:

Paul Haywood

(Chief Executive Officer)

Block Energy plc

Tel: +44 (0)20 3468 9891

Neil Baldwin

(Nominated Adviser)

Spark Advisory Partners Limited

Tel: +44 (0)20 3368 3554

Peter Krens

(Corporate Broker)

Tennyson Securities

Tel: +44 (0)20 7186 9030

Philip Dennis / Mark Antelme

(Financial PR)

Celicourt Communications

Tel: +44 (0)20 8434 2643

 

Notes to editors

Block Energy plc is an AIM-listed independent oil and gas company focused on production and development in Georgia, applying innovative technology to realise the full potential of previously discovered fields.

Block has a 100% working interest in Georgian onshore licence blocks IX and XIB. Licence block XIB is Georgia's most productive block, with 2P oil and gas reserves of 64 MMboe, which is comprised 2P oil reserves of 36 MMbbls and 2P gas reserves of 28 MMboe (Source: CPR Bayphase Limited: 1 July 2015) and historic production of over 180 MMbbls of oil from the Middle Eocene, peaking in the mid-1980s at 67,000 bopd.

The Company has a 100% working interest in the highly prospective West Rustavi onshore oil and gas field with multiple wells that have tested oil and gas from a range of geological horizons. The field has so far produced 50 Mbbls of light sweet crude and has 0.9 MMbbls of gross 2P oil reserves in the Middle Eocene. It also has 38 MMbbls of gross unrisked 2C contingent resources of oil and 608 Bcf of gross unrisked 2C contingent resources of gas in the Middle, Upper and Lower Eocene formations (Source: CPR Gustavson Associates: 1 January 2018).

Block also holds 100% and 90% working interests respectively in the onshore oil producing Norio and Satskhenisi fields.

The Company offers a clear entry point for investors to gain exposure to Georgia's growing economy and the strong regional demand for oil and gas.

Glossary

1. bbls: barrels. A barrel is 35 imperial gallons.

2. boe: barrels of oil equivalent.

3. bopd: barrels of oil per day.

4. Mbbls: thousand barrels.

5. MMbbls: million barrels.

6. MMboe: million barrels of oil equivalent.

7. Bcf: billion cubic feet.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLDKDBKDBDBCDD
Date   Source Headline
1st Jun 20267:00 amRNSFinal Results
27th May 20267:00 amRNS-RInvestor Presentation
26th May 20267:00 amRNSHolding(s) in Company
20th May 202610:49 amRNSHolding(s) in Company
18th May 202611:53 amRNSResult of General Meeting
29th Apr 202611:44 amRNSPosting of Circular
28th Apr 20267:00 amRNSResult of Bookbuild and WRAP Retail Offer
27th Apr 20265:13 pmRNSWRAP Retail Offer for up to £150,000
27th Apr 20265:04 pmRNSStrategic Entry into Offshore Gabon
14th Apr 20267:00 amRNSBinding Framework Agreement - Project III Farm Out
3rd Mar 20267:00 amRNSHolding(s) in Company
23rd Feb 20267:00 amRNSBonus Shares, Options, PDMR Dealings and Holding
16th Feb 20267:00 amRNSCompletion of CCS Pilot Study
29th Jan 20267:00 amRNSLoan Facility & Related Party Transactions
19th Jan 20267:00 amRNSProject IV (XIQ) Farm-out Completion
22nd Dec 20257:00 amRNSPhase 1 CCS Results
22nd Dec 20257:00 amRNSPhase 1 CCS Results
17th Dec 20257:00 amRNSCapital Structure Simplification Equity Issue
12th Dec 202512:14 pmRNSResults of General Meeting
11th Dec 20257:00 amRNSHolding(s) in Company
8th Dec 20257:00 amRNSProject III Farmout Update
25th Nov 202511:28 amRNSNotice of GM
21st Nov 20257:47 amRNSHolding(s) in Company
17th Nov 20257:00 amRNSHolding(s) in Company
17th Nov 20257:00 amRNSHolding(s) in Company
14th Nov 20257:00 amRNSCapital Structure Simplification
6th Nov 20257:00 amRNSFundraise and Operations Update
24th Sep 20257:00 amRNSHalf-year Report
19th Sep 20257:00 amRNSSpud of KRT-39ST
4th Sep 20257:00 amRNSFarmout of licence XIQ (part of Project IV)
26th Aug 20257:00 amRNSCCS Pilot Injection
12th Aug 20257:00 amRNSOperations Update
25th Jun 202512:29 pmRNSResult of AGM
28th May 202512:00 pmRNSNotice of AGM
22nd May 20257:02 amRNSExercise of Options and Issue of Shares
22nd May 20257:00 amRNSFinal Results
15th May 202510:25 amRNSHolding(s) in Company
15th May 202510:24 amRNSHolding(s) in Company
14th Apr 20257:00 amRNSCCS Project Update
27th Mar 20257:00 amRNSAcquisition
17th Mar 20257:00 amRNSOperations Update
10th Feb 20252:43 pmRNSHolding(s) in Company
7th Feb 20257:00 amRNSDirector/PDMR Shareholding
26th Nov 20247:00 amRNSCCS Update
30th Sep 20247:00 amRNSHalf-year Report
31st Jul 20247:00 amRNSTrading Statement
20th Jun 20243:46 pmRNSResults of Annual General Meeting
7th Jun 20241:55 pmRNSHolding(s) in Company
30th May 20247:00 amRNSDirector/PDMR Shareholding
28th May 20247:00 amRNSAnnual Financial Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.