Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

Share Price is delayed by 15 minutes
Get Live Data
24.50    0.00 (0.00%)
Bid:
24.00
Ask:
25.00
Spread: 1.00 (4.167%)
Market Cap: £109.34m
BKY Live PriceLast checked at - London Stock Exchange

Intraday Berkeley Eng Share Chart

Resource Update

8 Aug 2008 08:55

RNS Number : 9423A
Berkeley Resources Limited
08 August 2008
 



8 August 2008

INITIAL RESOURCE OF 9.23 million pounds

at THE GAMBUTA DEPOSIT 

The Directors of Berkeley Resources Limited (AIM: BKY.L) are pleased to announce an initial inferred resource estimate of 9.23 million pounds of U3O8, at an average grade of 371ppm U3O8 (at a 200ppm cutoff), for the Gambuta uranium deposit in the Cáceres Province of Spain. 

The deposit remains open along strike to the north-west however, drilling has ceased during the current fire season.

 

It is anticipated that drilling to test the considerable strike potential beneath Tertiary and Quaternary cover to the northwest will resume in early October. 

Background

The Gambuta deposit occurs within the Caceres VI license and is located 165kms west-southwest of Madrid, about 20kms south of the Badajoz - Madrid freeway and 6 kms east of the village of Bohonal de Ibor. It is typical of a number of perigranitic, shale hosted uranium mineral occurrences within the Caceres VI licence, such as El Zarzal and Ojaranzo, located in the central and eastern part of the tenement respectively. Additional targets for uranium, exploration have been identified in adjacent areas

Gambuta is associated with an area of anomalous radiometrics defined by the Junta de Energia Nuclear (JEN) in the 1960's and briefly explored by CISA (a joint venture between COGEMA (now AREVA) and ENUSA (Empresa Nacional Uranio S.A.)) in the early 1990's. Roto percussion drilling by CISA (24 holes) identified a mineralised, north-westerly trending, structural zone with dimensions of approximately 900m x 400m, including a central untested area of Tertiary cover. 

A 36 hole program by Berkeley has confirmed the CISA results and defined a continuous, structurally controlled, zone of mineralisation which is 250 - 350m wide, up to 94m below surface (see Figure 3) and is continuous for 1,500m in a west-northwesterly direction. This zone appears to extend beneath Tertiary and Quaternary cover to the north-west and about 1,300m of untested strike potential remains within the license.

Uranium mineralisation occurs within a sequence of strongly deformed Proterozoic spotted and banded grey to black phyllites which have been contact metamorphosed by Hercynian granites. The contacts between the phyllites and the granite to the east and northeast are tectonic. The sequence of host phyllites at Gambuta is similar to that hosting the Retortillo deposit in the Salamanca I license.

As at Retortillo, the Gambuta uranium mineralisation is generally sub-horizontal and associated with the weathering profile; a similar model of formation is envisaged. Most mineralisation occurs in the zone of partial oxidation. Deeper mineralisation is associated with oxidation along steeply dipping shears and fractures, dominantly sub-parallel to the mineralised trends. Uranium mineralisation occurs within the schistosity, particularly in zones of shearing and fracturing. The only visible uranium minerals are secondary autunite and torbernite.

The main mineralised horizon averages 9.4m in thickness and occurs at an average depth of 18.0m, beneath Tertiary cover and shales. A lower mineralised horizon averages 2.1m in thickness and is separated from the main horizon by 16.3m of shales. A central, higher grade (+0.1% U3O8,) zone, about 100m wide, is evident in the north-western half of the deposit and is open along strike.

Resource Calculation

All drilling results for the deposit have been previously reported in Stock Exchange announcements on 10 April, 6 June and 31 July 2008. 

Assessment and interpretation of the historical and Berkeley drilling information was undertaken by Company geologists and resource modelling was assisted by McDonald Speijers, a consulting group with more than 15 years experience in resource calculations. Resources were calculated by block modelling methods, using an inverse distance squared method of grade distribution, and cross-checked using kriging methods. The resource classification has been completed in accordance with the JORC Code. Grades were estimated using a calculated U3O8 value from total uranium as determined by Delayed Neutron Count, determined by Actlabs (Canada) with associated duplicates, blanks and standards.

Of necessity, the block model employed large block sizes (25m x 25m x 2m) consistent with the wide-spaced location of drillholes, within a wireframe defined by the interpretation of geological, radiometric and weathering data. This has resulted in some "spreading" of the grade and subsequent infill drilling is expected to result in a more realistic grade distribution. Incorporation of variable densities was based on measurements on selected core samples from diamond drill core, using the wet dry method.

Initial inferred uranium resources for the Gambuta deposit have been calculated as follows:

At a 200ppm U3O8 cut-off, 

11.29Mt of ore at a grade of 371ppm U3O8 containing 9.23Mlbs U3O8

At a 150ppm U3O8 cut-off, 

15.49Mt of ore at a grade of 318ppm U3O8 containing 10.85Mlbs U3O8

At a 100ppm U3O8 cut-off, 

19.46Mt of ore at a grade of 278ppm U3O8 containing 11.95Mlbs U3O8

.

Future work

The next round of RC and diamond drilling will commence at the end of the high risk fire season, which is anticipated to be early in October. This program will focus on defining the north-westerly extent of the deposit, where topography indicates potential for extensions beneath Tertiary and Quaternary cover for a further 1.3km

Infill drilling will be undertaken as required to better define the limits of mineralisation, in particular, the central zone of higher grade mineralisation. 

Diamond drilling will initially be directed to acquiring material for metallurgical testwork.

Enquiries - Managing Director: Matt Syme Tel: +61 417 906 717

RBC Capital Markets:  Martin Eales Tel: +44 20 7029 7881

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSDSWASASEIA
Date   Source Headline
27th Sep 20199:04 amRNSNotice of AGM
26th Sep 20197:55 amRNSAnnual report to shareholders
14th Aug 20199:31 amRNSHolding(s) in Company
31st Jul 20197:00 amRNSQuarterly Report June 2019
12th Jul 20198:00 amRNSFinal Director's Interest Notice
11th Jul 20197:00 amRNSStrategy and Management Changes
4th Jul 20197:55 amRNSDirector/PDMR Shareholding
1st Jul 20196:00 pmRNSHolding(s) in Company
25th Jun 20197:00 amRNSDrill programme for critical battery and EV metals
14th Jun 20197:55 amRNSIssue of shares and Appendix 3B
11th Jun 201911:05 amRNSSecond Price Monitoring Extn
11th Jun 201911:00 amRNSPrice Monitoring Extension
11th Jun 20197:00 amRNSElection result and award of three licences
28th May 20199:05 amRNSSecond Price Monitoring Extn
28th May 20199:00 amRNSPrice Monitoring Extension
28th May 20197:00 amRNSASX Response to Price and Volume Query
24th Apr 20197:55 amRNSQuarterly Report March 2019
8th Apr 20197:00 amRNSRecent Spanish Media Reports
11th Mar 20197:00 amRNSHalf-year Report
23rd Jan 201911:06 amRNSSecond Price Monitoring Extn
23rd Jan 201911:00 amRNSPrice Monitoring Extension
23rd Jan 20197:00 amRNSQuarterly Report December 2018
17th Jan 20194:40 pmRNSSecond Price Monitoring Extn
17th Jan 20194:35 pmRNSPrice Monitoring Extension
14th Jan 20192:06 pmRNSSecond Price Monitoring Extn
14th Jan 20192:01 pmRNSPrice Monitoring Extension
11th Jan 201911:05 amRNSSecond Price Monitoring Extn
11th Jan 201911:00 amRNSPrice Monitoring Extension
11th Jan 20197:00 amRNSBerkeley notes recent Spanish media reports
10th Jan 20194:35 pmRNSPrice Monitoring Extension
7th Jan 20197:59 amRNSASX Response to Price and Volume Query
4th Jan 20194:41 pmRNSSecond Price Monitoring Extn
4th Jan 20194:36 pmRNSPrice Monitoring Extension
4th Jan 201911:00 amRNSPrice Monitoring Extension
4th Jan 20197:55 amRNSChange of Director's Interest Notice x2
2nd Jan 20194:40 pmRNSSecond Price Monitoring Extn
2nd Jan 20194:35 pmRNSPrice Monitoring Extension
28th Dec 20187:59 amRNSReport on Payments to Govts
24th Dec 20187:55 amRNSHolding(s) in Company
20th Dec 20187:55 amRNSHolding(s) in Company
17th Dec 20187:55 amRNSHolding(s) in Company
30th Nov 20187:00 amRNSIssue of Incentive Performance Rights
22nd Nov 20187:32 amRNSResult of AGM
9th Nov 20188:00 amRNSChange of interests of substantial holder
29th Oct 20187:00 amRNSResponse to recent media reports
19th Oct 20187:00 amRNSNotice of AGM
18th Oct 20182:00 pmRNSPrice Monitoring Extension
17th Oct 20189:28 amRNSBerkeley responds to Spanish media reports
17th Oct 20189:06 amRNSSecond Price Monitoring Extn
17th Oct 20189:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.