We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBHP Group Regulatory News (BHP)

Share Price Information for BHP Group (BHP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2,232.00
Bid: 2,233.00
Ask: 2,235.00
Change: 0.00 (0.00%)
Spread: 2.00 (0.09%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2,232.00
BHP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update - Samarco

30 Nov 2015 07:00

RNS Number : 2883H
BHP Billiton PLC
29 November 2015
 



 

NEWS RELEASE

Release Time

IMMEDIATE

Date

30 November 2015

Number

29/15

UPDATE: SAMARCO

This release provides a further update following the breach of the Fundão tailings dam and Santarém water dam at the Samarco Mineração S.A (Samarco) iron ore operation in Minas Gerais, Brazil which occurred on 5 November 2015. BHP Billiton and Vale each hold a 50 per cent interest in Samarco.

Samarco has advised that, at this stage, there are 13 fatalities and six people who remain unaccounted for. Emergency services continue to search for the six missing people.

Samarco continues to work with the Government authorities in Brazil to relocate displaced people from temporary accommodation to rented housing. Relocation is expected to be completed in February 2016.

Clean-up work has commenced in the Barra Longa area, focusing on access roads, housing and bridge repairs.

Monitoring of the remaining dam structures at Samarco continues. Interim work to repair the damage to the dams and to reinforce parts of the structure has commenced.

Operations at Samarco remain suspended.

Samarco and local authorities continue to assess and monitor water quality in the Rio Doce river system. Where water supplies have been affected, alternative water supplies are being provided by Samarco, working with local authorities.

Samarco has reported that tests on the sediments carried out by the Brazilian Geological Service (CPRM) from samples taken at four points in the Rio Doce river system over the period 14 November to 18 November 2015 indicate that concentrations of metals obtained at these sites do not significantly differ from the results produced by CPRM in 2010.

Samarco reports that analysis by SGS Geosol, a company specialising in environmental geochemistry, has confirmed that the tailings are composed of materials that are not hazardous to human health, based on the hazard classification of the material under Brazilian standards.

Samarco has advised that the tailings material released as a result of the breach of the Fundão and Santarém dams is considered to be non-reactive and would be geochemically stable when introduced to the river system or ocean. As a result of the high volume of sand and clay tailings material that moved through the river system, a large number of fish died due to reduced oxygen uptake. Assessment of these impacts is ongoing.

The tailings plume has reached the Atlantic Ocean and is dispersing. Samarco has developed a program for monitoring the plume in the ocean and authorities have provided direction on the scope of the required testing under the program.

The Brazilian Federal Government and certain State governments have announced that, on 30 November 2015, they intend to commence legal proceedings against Samarco, Vale and BHP Billiton for clean-up costs and damages. The announcement indicates that the legal action will demand that the companies establish a fund of BRL 20 billion in aggregate (approximately US$5.2 billion at current exchange rates) for environmental recovery and compensation. BHP Billiton has not received formal notice of the action at this stage.

BHP Billiton confirms its commitment to supporting Samarco to rebuild the community and restore the environment affected by the breach of the dams. This includes plans, announced by Vale and BHP Billiton on 27 November 2015, to work together with Samarco to establish a voluntary, non-profit fund to support the recovery of the Rio Doce river system. A copy of the joint media statement issued by Vale and BHP Billiton on 27 November 2015 is attached.

As announced at the Annual General Meeting of BHP Billiton Limited on 19 November 2015, the Board of BHP Billiton has established a separate sub-committee to assist the Board in overseeing the governance of BHP Billiton's management and response to the events at Samarco. The members of the sub-committee are John Schubert (as Chairman), Jac Nasser, Lindsay Maxsted and Malcolm Brinded.

In addition, the Chief Executive Officer, Andrew Mackenzie, has asked BHP Billiton's Forum on Corporate Responsibility to play a role in providing a high-level, strategic overview of the recovery processes and lessons learned for BHP Billiton. For over 15 years, the Forum on Corporate Responsibility has been a key component of BHP Billiton's stakeholder engagement program, providing insight into current and emerging issues on a range of sustainability topics. The Forum comprises eight highly respected international civil society leaders as well as members of BHP Billiton's Group Management Committee.

Further information on BHP Billiton can be found at: www.bhpbilliton.com.

 

 

Media Relations

Australia 

Emily Perry

Tel: +61 3 9609 2800 Mobile: +61 477 325 803

email: Emily.Perry@bhpbilliton.com

 

Paul Hitchins

Tel: + 61 3 9609 2592 Mobile: + 61 419 315 001

email: Paul.Hitchins@bhpbilliton.com

 

Eleanor Nichols

Tel: +61 3 9609 2360 Mobile: +61 407 064 748

email: Eleanor.Nichols@bhpbilliton.com

United Kingdom and Americas

Ruban Yogarajah

Tel: +44 20 7802 4033 Mobile: +44 7827 082 022

email: Ruban.Yogarajah@bhpbilliton.com

 

Jennifer White

Tel: +44 20 7802 7462 Mobile: +44 7827 253 764

email: Jennifer.White@bhpbilliton.com

 

 

 

 

Investor Relations

 

Australia

 

Tara Dines

Tel: +61 3 9609 2222 Mobile: +61 499 249 005

email: Tara.Dines@bhpbilliton.com

 

Andrew Gunn

Tel: +61 3 9609 3575 Mobile: +61 402 087 354 email: Andrew.Gunn@bhpbilliton.com

 

United Kingdom and South Africa

 

Jonathan Price

Tel: +44 20 7802 4131 Mobile: +44 7990 527 726

email: Jonathan.H.Price@bhpbilliton.com

 

Dean Simon

Tel: +44 20 7802 7461 Mobile: +44 7717 511 193

email: Dean.Simon@bhpbilliton.com

 

Americas

 

James Agar

Tel: +1 212 310 1421 Mobile: +1 347 882 3011

email: James.Agar@bhpbilliton.com

 

Joseph Suarez

Tel: +1 212 310 1422 Mobile: +1 646 400 3803

email: Joseph.Suarez@bhpbilliton.com

 

 

BHP Billiton Limited ABN 49 004 028 077

Registered in Australia

Registered Office: Level 16, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

 

BHP Billiton Plc Registration number 3196209

Registered in England and Wales

Registered Office: Neathouse Place

London SW1V 1LH United Kingdom

Tel +44 20 7802 4000 Fax +44 20 7802 4111

 

Members of the BHP Billiton Group which is headquartered in Australia

Follow us on social media

 

 

 

 

 

NEWS RELEASE

Release Time

IMMEDIATE

Date

27 November 2015

 

JOINT STATEMENT ON PLANS TO CREATE RIO DOCE FUND

 

Vale and BHP Billiton announced today plans to work together, with Samarco, to establish a voluntary, non-profit fund to support the rescue and recuperation of the Rio Doce river system, affected by an accident at Samarco's Fundão dam, in the state of Minas Gerais on 5 November 2015.

The Fund would initially be sponsored by Vale and BHP Billiton. The aim is to seek additional financial support from other private, public and non-government organisations. The initial value is still being defined. The objective, however, is that these resources would support the rescue and recuperation effort of the river system for the longer term.

It is proposed that the Fund would have a committee to guide investment and oversee budget approval. The number of participants has yet to be defined, but it would likely include representatives from the private and public entities. A dedicated team would be responsible for its management, according to the targets established. The Fund would also undergo regular independent audits. The sponsors are finalising the governance, scope, financial and stakeholder arrangements associated with the Fund to ensure it can be put into effect as soon as practicable.

The actions to recuperate the Rio Doce river system include the recomposition of riparian forest, water quality and aquatic fauna, as well as helping to rescue the biodiversity of the Rio Doce river basin.

Today just four per cent of the original coverage of the Atlantic Forest remains in the river basin. Approximately 80 per cent of the area is made up of degraded pastureland. The deforested earth hinders the infiltration of rainwater, which sustains groundwater levels. The flow of the Rio Doce in the dry months, which historically was 300m3 per second, fell in the region of Colatina (Espírito Santo state) in 2015 to 80m3 per second.

Announcing the Fund plans, the CEO of Vale, Murilo Ferreira, and the CEO of BHP Billiton, Andrew Mackenzie, made the following joint statements of support: "Vale and BHP Billiton are committed to supporting the rehabilitation of those areas of the Rio Doce system impacted by the recent tragedy.

"The immediate focus for Samarco has been securing the safety of the operations and supporting the humanitarian and environmental response. Plans must also be made for the recovery and rehabilitation of the affected environment.

"The Fund would focus on supporting the remediation of the river as part of the commitment of Vale, BHP Billiton and Samarco to the aquatic environment following the release of the tailings into the Doce basin.

"We see this Fund as part of a positive contribution to the people of Brazil, who owe much to this river system."

Further information on BHP Billiton can be found at: www.bhpbilliton.com.

 

Media Relations

Australia

Emily Perry

Tel: +61 3 9609 2800 Mobile: +61 477 325 803

email: Emily.Perry@bhpbilliton.com

 

Paul Hitchins

Tel: + 61 3 9609 2592 Mobile: + 61 419 315 001

email: Paul.Hitchins@bhpbilliton.com

 

Eleanor Nichols

Tel: +61 3 9609 2360 Mobile: +61 407 064 748

email: Eleanor.Nichols@bhpbilliton.com

United Kingdom and Americas

Ruban Yogarajah

Tel: +44 20 7802 4033 Mobile: +44 7827 082 022

email: Ruban.Yogarajah@bhpbilliton.com

 

Jennifer White

Tel: +44 20 7802 7462 Mobile: +44 7827 253 764

email: Jennifer.White@bhpbilliton.com

 

 

 

 

Investor Relations

 

Australia

 

Tara Dines

Tel: +61 3 9609 2222 Mobile: +61 499 249 005

email: Tara.Dines@bhpbilliton.com

 

Andrew Gunn

Tel: +61 3 9609 3575 Mobile: +61 402 087 354 email: Andrew.Gunn@bhpbilliton.com

 

United Kingdom and South Africa

 

Jonathan Price

Tel: +44 20 7802 4131 Mobile: +44 7990 527 726

email: Jonathan.H.Price@bhpbilliton.com

 

Dean Simon

Tel: +44 20 7802 7461 Mobile: +44 7717 511 193

email: Dean.Simon@bhpbilliton.com

 

Americas

 

James Agar

Tel: +1 212 310 1421 Mobile: +1 347 882 3011

email: James.Agar@bhpbilliton.com

 

Joseph Suarez

Tel: +1 212 310 1422 Mobile: +1 646 400 3803

email: Joseph.Suarez@bhpbilliton.com

 

 

BHP Billiton Limited ABN 49 004 028 077

Registered in Australia

Registered Office: Level 16, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

 

BHP Billiton Plc Registration number 3196209

Registered in England and Wales

Registered Office: Neathouse Place

London SW1V 1LH United Kingdom

Tel +44 20 7802 4000 Fax +44 20 7802 4111

 

Members of the BHP Billiton Group which is headquartered in Australia

Follow us on social media

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURPKCDPBBDBODB
Date   Source Headline
2nd May 20245:52 pmRNSForm 8.5 (EPT/RI)-Replacement of BHP Group Limited
2nd May 20245:47 pmRNSForm 8.5 (EPT/RI)-Replacement of BHP Group Limited
2nd May 20245:44 pmRNSForm 8.5 (EPT/RI)-Replacement of BHP Group Limited
2nd May 20245:42 pmRNSForm 8.5 (EPT/NON-RI)- Replacement of BHP Group
2nd May 20245:19 pmRNSForm 8.5 (EPT/RI)-Replacement of BHP Group Limited
2nd May 20245:11 pmRNSForm 8.5 (EPT/RI) - BHP Group Limited
2nd May 20245:11 pmRNSForm 8.5 (EPT/RI) - BHP Group Limited
2nd May 20245:10 pmRNSForm 8.5 (EPT/RI) BHP Group Limited
2nd May 20244:38 pmRNSForm 8.5 (EPT/RI)- Replacement of BHP Group
2nd May 20243:43 pmRNSForm 8.3 - BHP Group Limited
2nd May 20243:39 pmRNSForm 8.3 - Anglo American plc
2nd May 20243:25 pmRNSForm 8.3 - BHP Group Limited
2nd May 20243:20 pmRNSForm 8.3 - BHP Group Limited
2nd May 20242:45 pmRNSForm 8.3 - BHP Group Limited
2nd May 20242:32 pmRNSForm 8.3 - BHP Group Limited
2nd May 20242:32 pmEQSForm 8.3 - The Vanguard Group, Inc.: BHP Group Limited
2nd May 20242:30 pmRNSForm 8.3 - BHP Group Ltd
2nd May 20242:16 pmRNSForm 8.3 - BHP Group Ltd
2nd May 20241:57 pmGNWInvesco Ltd: Form 8.3 - BHP Group Ltd
2nd May 20241:44 pmRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 20241:29 pmRNSForm 8.3 - BHP Group Limited
2nd May 20241:12 pmRNSForm 8.3 - BHP GROUP LTD
2nd May 20241:05 pmRNSForm 8.3 - ANGLO AMERICAN PLC
2nd May 202412:58 pmRNSForm 8.3 - BHP Group Limited
2nd May 202412:45 pmRNSForm 8.3 - BHP Group Ltd
2nd May 202412:39 pmRNSForm 8.3 - BHP Group Limited
2nd May 202412:06 pmRNSForm 8.5 (EPT/RI) - BHP
2nd May 202412:02 pmRNSForm 8 (DD) - [offeree/ror] - BHP
2nd May 202411:58 amRNSForm 8.3 - BHP Group Ltd
2nd May 202411:58 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 202411:55 amRNSForm 8 (DD) - BHP GROUP LIMITED
2nd May 202411:51 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 202411:11 amRNSForm 8.3 - BHP Group Limited
2nd May 202411:01 amRNSForm 8.3 - BHP Group Ltd
2nd May 202410:27 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 202410:27 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 202410:25 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 202410:24 amRNSForm 8.5 (EPT/NON-RI)
2nd May 202410:20 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
2nd May 202410:10 amRNSForm 8.5 (EPT/NON-RI)- BHP Group Limited
2nd May 202410:08 amRNSForm 8.5 (EPT/NON-RI)- BHP Group Limited
2nd May 20249:54 amPRNForm 8.3 - BHP Group Limited
2nd May 20249:28 amRNSForm 8.5 (EPT/RI)
2nd May 20249:20 amRNSForm 8.5 (EPT/RI)-BHP Group Limited
2nd May 20248:53 amRNSForm 8.5 (EPT/RI)-BHP Group Limited
2nd May 20248:51 amRNSForm 8.5 (EPT/RI)-BHP Group Limited
2nd May 20248:19 amRNSForm 8.3 - BHP GROUP LTD/ANGLO AMERICAN PLC
1st May 20245:13 pmRNSForm 8.5 (EPT/RI)-Replacement of BHP Group Limited
1st May 20244:26 pmRNSForm 8.5 (EPT/NON-RI)- Replacement of BHP Group
1st May 20244:06 pmRNSForm 8.5 (EPT/NON-RI)- Replacement of BHP Group

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.