Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
9.00    3.50 (63.64%)
Bid:
7.00
Ask:
11.00
Spread: 4.00 (57.143%)
Market Cap: £5.82m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Metallurgical Tests Commenced

22 Jun 2009 07:00

RNS Number : 2317U
Beowulf Mining PLC
22 June 2009
 



Beowulf Mining Plc

("Beowulf" or the "Company")

Ruoutevare and Kallak Iron Ore Deposits 

Metallurgical programme developments

Highlights:

Enlarged metallurgical tests have commenced for a potential economic extraction process for the Company's Ruoutevare iron ore deposit
Metallurgical study to start in relation to the Company's Kallak iron ore deposits 

Products to be obtained can be tested for quality by potential clients

Beowulf (AIM: BEM; Aktietorget: BEO), the AIM and Aktietorget traded mineral exploration company which owns several exploration projects in Northern Sweden, is pleased to announce that the Company has commissioned further metallurgical tests, on material from its 100%-owned Ruoutevare magnetite-ilmenite deposit in Northern Sweden, from the Swedish company MINPRO AB's research laboratory at Stråssa, Central Sweden. The deposit, located some 140km west of the Jokkmokk municipality centre, has a JORC compliant inferred mineral resource of 140 million tonnes. Previously announced results have confirmed that by applying reduction techniques in a laboratory scale simulation of a mechanical oven, it is possible to fully extract iron, titanium and vanadium from the Ruoutevare titanium-magnetite ore.

The final product of the initial test programme yielded a high grade sponge iron powder which contained 97% iron (Fe) and less than 0.5% titanium (TiO2), and 0.02% vanadium (V).

The present programme will further validate and optimise the earlier defined process by using a larger ore sample with a weight of 100kg. It is intended that the products obtained will then be tested for their commercial quality by potential clients. The results will provide the basis for a preliminary economic evaluation study of the project, following which pilot plant studies can then be planned.

The present study will also include ore material from the Company's Kallak iron ore deposits, which will undergo qualitative metallurgical testing with an aim to obtain possible commercial products. The two Kallak deposits are separated by a distance of only some several hundred metres and have an estimated total tonnage of more than 120 million tonnes. The Kallak deposits are located along the same major road as Ruoutevare, but only about 40km west of the Jokkmokk municipality centre. The excellent local infrastructure should facilitate their development to commercial stage. The Kallak iron ore deposits are of a conventional quartz banded iron (mainly magnetite) ore type. The ores have grades varying between 35-42% of iron and only low background levels of TiO2 ( (

Clive Sinclair-Poulton, Chairman of Beowulf commented

"Previous metallurgical tests confirmed the potential of the Ruoutevare project - we have an inferred mineral resource of 140 million tonnes at 39% Fe and we anticipate that these new studies will show further positive results that will serve to demonstrate the commercial aspects of the project. With this current study we will also obtain metallurgical results for our attractive Kallak ores, which, like Ruoutevare, have large tonnages of iron, but are very clean from other elements like titanium and phosphorous." 

Dr Jan Ola Larsson (Fil. Kand, PhD, DIC), has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM rules. Dr Larsson is Technical Director of the Company and has over 30 years relevant experience within the natural resources sector. He also is a Competent Person according to the Swedish Mining Society.

22 June 2009

Enquiries:

Beowulf Mining Plc

Clive Sinclair-Poulton, Chairman

Tel: +353 (0) 85 739 2674

Strand Partners Limited

Simon Raggett / Matthew Chandler

Tel: +44 (0) 207 409 3494

Alexander David Securities Limited

David Scott / Nick Bealer

Tel: +44 (0) 207 448 9820

Lothbury Financial Limited

Gary Middleton / Ron Marshman

Tel: +44 (0) 207 011 9411

or visit http://www.beowulfmining.com

Notes to editors:

The Ruoutevare Magnetite Project is 100%-owned by Beowulf and covers 850 hectares. It is located approximately 1,100km north of Stockholm in the Norrbotten County and approximately 13km north-west of the minor village of Kvikkjokk. The 2.3 billion tonne Kiruna iron ore mine, the world's second largest underground mine, is located approximately 150km northeast and the Malmberget iron ore mine is located 120km to the east.

There appears to be good potential to substantially increase the Ruoutevare resource by drilling extensions to the existing resource and by testing other magnetite bearing zones in the vicinity of the deposit.

In August 2008, Beowulf announced an Inferred Mineral Resource estimate compliant with JORC standards on Ruoutevare showing 140 million tonnes (Mt) grading 39.1% iron (Fe), 5.7% titanium (Ti) and 0.2% vanadium (V) (cut-off grade of 30% Fe).

In addition, the Company also owns the nearby Kallak Magnetite Project, which has total target iron mineralisation of more than 120 million tonnes across two deposits at grades varying between 35-42% Fe. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZGGMVVLGGLZM
Date   Source Headline
31st Mar 20257:00 amRNS-RCEO Interview
27th Mar 20257:00 amRNS-RUpdated Corporate Presentation
21st Mar 20257:00 amRNSPlacing and Notice of General Meeting
10th Mar 20257:00 amRNSGAMP PFS Demonstrates Robust Project Economics
28th Feb 20256:14 pmRNSUnaudited Results for year ended 31 December 2024
16th Dec 20247:00 amRNSPortfolio update
2nd Dec 20247:00 amRNSChange of Auditor
29th Nov 20247:00 amRNSUnaudited Financial Results
26th Nov 20247:00 amRNSBusiness Finland Commits Additional Grant Funding
31st Oct 20247:00 amRNSCompletion of Business Finland Project
30th Sep 20247:00 amRNSInitiation of the Consultation Process for Kallak
5th Sep 20247:00 amRNSTest-work confirms high grade product at Kallak
30th Aug 20247:00 amRNSUnaudited Results for Period Ended 30 June 2024
28th Aug 20247:00 amRNSGraphite Anode Materials Plant update
22nd Jul 20247:00 amRNSChief Executive Share Purchase
16th Jul 20247:00 amRNSGállok/ Kallak Iron Ore Project Update
28th Jun 20243:45 pmRNSChief Executive Share Purchase
25th Jun 20249:48 amRNSUpdate on the Kallak Iron Ore Project
14th Jun 202410:40 amRNSResult of Annual General Meeting
10th Jun 20247:00 amRNSGraphite Anode Materials Plant update
3rd Jun 20247:00 amRNSGállok/ Kallak Iron Ore Project Update
29th May 20247:00 amRNSUnaudited Results for Period Ended 31 March 2024
20th May 20247:00 amRNSPosting of Annual Report and Notice of AGM
20th May 20247:00 amRNSFinancial Results for the year ended 31 Dec 2023
30th Apr 20247:00 amRNSTotal Voting Rights
25th Apr 202411:45 amRNSSP Angel Research Note
23rd Apr 20247:00 amRNSAlternative Resource Capital Research Note
18th Apr 20247:00 amRNSGrant of Options
11th Apr 20247:00 amRNSLast day of trading in Paid Subscribed SDRs
10th Apr 20247:00 amRNSIssue of SDRs to underwriters
9th Apr 20247:00 amRNSCompletion of Vardar Minerals Ltd Consolidation
3rd Apr 20247:00 amRNSBeowulf announces outcome of Capital Raise
26th Mar 20247:00 amRNSProspective Exploration Targets at Parkijaur nr 7
20th Mar 202410:05 amRNSCapital Raise Update
20th Mar 20249:43 amRNSCapital Raise Update
15th Mar 20247:00 amRNSUpdate on Consolidation of Vardar Minerals Limited
14th Mar 202410:30 amRNSPrimaryBid Offer
14th Mar 20247:06 amRNSSubscription period in Rights Issue of SDRs begins
13th Mar 20244:37 pmRNSPublication of Prospectus
12th Mar 20244:50 pmRNSPostponement of Subscription period
8th Mar 20242:10 pmRNSBörsveckan Presentation and Interview
7th Mar 20247:00 amRNSProject Director appointed for Kallak
5th Mar 20241:40 pmRNSResult of General Meeting
4th Mar 20247:00 amRNSBeowulf announces final terms for capital raise
4th Mar 20247:00 amRNSVardar Consolidation of Ownership and Update
29th Feb 20247:00 amRNSParkijaur nr 8 Exploration Permit Awarded
29th Feb 20247:00 amRNSUnaudited Preliminary Financial Results
19th Feb 20247:00 amRNSExtension of Site Reservation in GigaVaasa Area
16th Feb 20247:00 amRNSProposed fundraise and Notice of General Meeting
5th Feb 20247:00 amRNSProject Director appointed for Kallak

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.