Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
5.50    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 3.00 (75.00%)
Market Cap: £3.56m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Metallurgical Tests Commenced

22 Jun 2009 07:00

RNS Number : 2317U
Beowulf Mining PLC
22 June 2009
 



Beowulf Mining Plc

("Beowulf" or the "Company")

Ruoutevare and Kallak Iron Ore Deposits 

Metallurgical programme developments

Highlights:

Enlarged metallurgical tests have commenced for a potential economic extraction process for the Company's Ruoutevare iron ore deposit
Metallurgical study to start in relation to the Company's Kallak iron ore deposits 

Products to be obtained can be tested for quality by potential clients

Beowulf (AIM: BEM; Aktietorget: BEO), the AIM and Aktietorget traded mineral exploration company which owns several exploration projects in Northern Sweden, is pleased to announce that the Company has commissioned further metallurgical tests, on material from its 100%-owned Ruoutevare magnetite-ilmenite deposit in Northern Sweden, from the Swedish company MINPRO AB's research laboratory at Stråssa, Central Sweden. The deposit, located some 140km west of the Jokkmokk municipality centre, has a JORC compliant inferred mineral resource of 140 million tonnes. Previously announced results have confirmed that by applying reduction techniques in a laboratory scale simulation of a mechanical oven, it is possible to fully extract iron, titanium and vanadium from the Ruoutevare titanium-magnetite ore.

The final product of the initial test programme yielded a high grade sponge iron powder which contained 97% iron (Fe) and less than 0.5% titanium (TiO2), and 0.02% vanadium (V).

The present programme will further validate and optimise the earlier defined process by using a larger ore sample with a weight of 100kg. It is intended that the products obtained will then be tested for their commercial quality by potential clients. The results will provide the basis for a preliminary economic evaluation study of the project, following which pilot plant studies can then be planned.

The present study will also include ore material from the Company's Kallak iron ore deposits, which will undergo qualitative metallurgical testing with an aim to obtain possible commercial products. The two Kallak deposits are separated by a distance of only some several hundred metres and have an estimated total tonnage of more than 120 million tonnes. The Kallak deposits are located along the same major road as Ruoutevare, but only about 40km west of the Jokkmokk municipality centre. The excellent local infrastructure should facilitate their development to commercial stage. The Kallak iron ore deposits are of a conventional quartz banded iron (mainly magnetite) ore type. The ores have grades varying between 35-42% of iron and only low background levels of TiO2 ( (

Clive Sinclair-Poulton, Chairman of Beowulf commented

"Previous metallurgical tests confirmed the potential of the Ruoutevare project - we have an inferred mineral resource of 140 million tonnes at 39% Fe and we anticipate that these new studies will show further positive results that will serve to demonstrate the commercial aspects of the project. With this current study we will also obtain metallurgical results for our attractive Kallak ores, which, like Ruoutevare, have large tonnages of iron, but are very clean from other elements like titanium and phosphorous." 

Dr Jan Ola Larsson (Fil. Kand, PhD, DIC), has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM rules. Dr Larsson is Technical Director of the Company and has over 30 years relevant experience within the natural resources sector. He also is a Competent Person according to the Swedish Mining Society.

22 June 2009

Enquiries:

Beowulf Mining Plc

Clive Sinclair-Poulton, Chairman

Tel: +353 (0) 85 739 2674

Strand Partners Limited

Simon Raggett / Matthew Chandler

Tel: +44 (0) 207 409 3494

Alexander David Securities Limited

David Scott / Nick Bealer

Tel: +44 (0) 207 448 9820

Lothbury Financial Limited

Gary Middleton / Ron Marshman

Tel: +44 (0) 207 011 9411

or visit http://www.beowulfmining.com

Notes to editors:

The Ruoutevare Magnetite Project is 100%-owned by Beowulf and covers 850 hectares. It is located approximately 1,100km north of Stockholm in the Norrbotten County and approximately 13km north-west of the minor village of Kvikkjokk. The 2.3 billion tonne Kiruna iron ore mine, the world's second largest underground mine, is located approximately 150km northeast and the Malmberget iron ore mine is located 120km to the east.

There appears to be good potential to substantially increase the Ruoutevare resource by drilling extensions to the existing resource and by testing other magnetite bearing zones in the vicinity of the deposit.

In August 2008, Beowulf announced an Inferred Mineral Resource estimate compliant with JORC standards on Ruoutevare showing 140 million tonnes (Mt) grading 39.1% iron (Fe), 5.7% titanium (Ti) and 0.2% vanadium (V) (cut-off grade of 30% Fe).

In addition, the Company also owns the nearby Kallak Magnetite Project, which has total target iron mineralisation of more than 120 million tonnes across two deposits at grades varying between 35-42% Fe. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZGGMVVLGGLZM
Date   Source Headline
29th May 20267:00 amRNSFinancial Results for Period Ended 31 March 2026
30th Apr 20267:00 amRNSTotal Voting Rights
27th Apr 20267:00 amRNSNordicPipe to proceed independently of EIT
27th Apr 20267:00 amRNSGrafintec Activities Update
24th Apr 202612:10 pmRNSUpdate on Financial Position
23rd Apr 20267:00 amRNSConversion of Loan Notes
20th Apr 20267:00 amRNS-RSwedish Government Support for Infrastructure
31st Mar 20267:00 amRNSUpdate on Financial Position & Total Voting Rights
25th Mar 20267:00 amRNSConversion of Loan Notes
18th Mar 20267:00 amRNSConsortium secure conditional €1.1m EIT funding
9th Mar 20267:00 amRNSConversion of Loan Notes
27th Feb 20267:00 amRNSTotal Voting Rights
27th Feb 20267:00 amRNSUnaudited Results for year ended 31 December 2025
24th Feb 20267:00 amRNSConversion of Loan Notes
6th Feb 20267:00 amRNSConversion of Loan Notes
30th Jan 20267:00 amRNSTotal Voting Rights & 2026 Financial Calendar
22nd Jan 20267:00 amRNSConversion of Loan Notes
21st Jan 20267:00 amRNSCorporate update
14th Jan 20267:00 amRNSConversion of Loan Notes
22nd Dec 20257:00 amRNSConvertible Loan and Corporate Adviser Appointment
28th Nov 20257:00 amRNSUnaudited Financial Results
26th Nov 20257:00 amRNSUpdate on financial position and funding strategy
1st Oct 20257:00 amRNSGrafintec Update
22nd Sep 20257:00 amRNSKallak Iron Ore Project Update
15th Sep 20257:00 amRNSTax Credit Application to support GAMP development
10th Sep 20258:55 amRNS-RUpdated Corporate Presentation
29th Aug 20257:00 amRNSUnaudited Results for Period Ended 30 June 2025
17th Jul 20257:00 amRNSGrant of Options
1st Jul 20259:06 amRNSGrafintec Secures GAMP Site Reservation in Kotka
25th Jun 20257:00 amRNS-RCEO Interview
24th Jun 20253:00 pmRNSResult of Annual General Meeting
19th Jun 20251:36 pmRNS-RSP Angel Research Note
10th Jun 20257:00 amRNS-RUpdated Corporate Presentation
4th Jun 20259:25 amRNS-RAlternative Resource Capital Research Note
30th May 20257:00 amRNSTotal Voting Rights and PDMR Shareholdings
29th May 20257:00 amRNSUnaudited Results for Period Ended 31 March 2025
23rd May 20257:00 amRNSFinancial Results for the year ended 31 Dec 2024
20th May 20257:00 amRNSLast day trading in Paid Subscribed SDRs and TVR
14th May 20257:05 amRNS-RGAMP PFS Delivers Outstanding Economics
14th May 20257:00 amRNS-RKallak Iron Ore Project Summary
8th May 20257:00 amRNSBeowulf announces outcome of Capital Raise
17th Apr 20257:00 amRNS-RInvestor Presentation and Q&A via IMC
16th Apr 20257:00 amRNSSubscription period in Rights Issue of SDRs begins
16th Apr 20257:00 amRNSWRAP Retail Offer for up to £738,000
16th Apr 20257:00 amRNSPublication of Prospectus
15th Apr 20257:00 amRNSStatement of Financial Position
8th Apr 202512:05 pmRNSResult of General Meeting
4th Apr 20257:00 amRNSBeowulf announces final terms of capital raise
2nd Apr 202510:30 amRNS-RBeowulf live investor Q&A
31st Mar 20257:00 amRNS-RCEO Interview

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.