Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
9.00    3.50 (63.64%)
Bid:
7.00
Ask:
11.00
Spread: 4.00 (57.143%)
Market Cap: £5.82m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Grafintec Update

1 Oct 2025 07:00

RNS Number : 4996B
Beowulf Mining PLC
01 October 2025
Β 

Β 

Β 

01 October 2025

Beowulf Mining Plc

Β 

("Beowulf" or the "Company")

Β 

Grafintec update

Β 

Beowulf (AIM: BEM; Spotlight: BEO) and its wholly owned Finnish subsidiary, Grafintec Oy ("Grafintec"), are pleased to provide an update on the development of Grafintec's Graphite Anode Materials Plant ("GAMP") and exploration portfolio in Finland.

Highlights

Β 

Β· Initial public meeting held in Keltakallio to present GAMP to local residents

Β· Visited potential sites for the development of the demonstration plant in the Kotka area

· Aitolampi and RÀÀpysjÀrvi projects visited to review historic, and plan future activity

· RÀÀpysjÀrvi exploration licence renewed from 30 September 2025 for three years

Β 

Ed Bowie, Chief Executive Officer of Beowulf, commented:

Β 

"The Grafintec team and I had a full and productive week in Finland.

Β 

"Our first public meeting in Keltakallio represents an important milestone for the GAMP project. The process of disseminating information, listening to feedback and addressing questions and concerns is a critical step in building local support for any development project. The event was well-organised by the Municipality of Kotka and the Cursor team and was co-hosted by Easpring. I would like to thank all three groups for their ongoing support and collaboration and all participants for attending.

"Preparations are underway for the next phase of development of the GAMP. The team visited a number of potential sites for the development of the demonstration plant and had further meetings with consultants ahead of the initiation of the site-specific Environmental Impact Assessment.

Β 

"It is pleasing to receive the renewal for the RÀÀpysjÀrvi exploration licence, and I enjoyed visiting our two flagship exploration assets to better understand the historic work completed and begin the planning process for the next phases of exploration."

GAMP update

Β 

The initial public meeting for the GAMP was held on 23 September in Keltakallio. The event was hosted by Cursor Ltd. ("Cursor"), the organisation focused on regional economic development, with presentations from Easpring Finland New Materials Oy ("Easpring"), the Municipality of Kotka, and Grafintec. Rasmus Blomqvist, Grafintec's Managing Director, presented the Company's plans for the site and answered questions. Easpring have demonstrated significant progress since initiating construction of their Cathode Active Materials plant in April 2025.

Figure 1: Rasmus Blomqvist presenting at public meeting

Β 

Grafintec will participate in a number of public events during the development and operation of the GAMP to ensure local stakeholders are kept appraised of activities and have a forum to ask questions and raise concerns. The Company's objective is to be open, transparent and accountable, listening to our local stakeholders so that their concerns can be addressed or mitigated.

Β 

Figure 2: Construction progress at Easpring site, viewed from the GAMP site

Whilst in the Kotka area, the team visited several brownfield sites to assess suitability for the development of the demonstration plant for the GAMP. Pilot testing is the next key technical step for the project to demonstrate the technology is scalable and to produce sufficient material for qualification with potential customers. A number of the options visited appear to be suitable, so further assessments will follow.

Β 

In parallel with the pilot testing phase, the Company will initiate the site-specific Environmental Impact Assessment ("EIA") and permitting process for the GAMP. The Company has had a series of meetings with consultants and intends to appoint the lead consultant for the EIA work in due course.

Β 

Exploration projects update

Β 

The Grafintec team visited the Aitolampi and RÀÀpysjÀrvi projects in Eastern Finland.

Β 

Figure 3: Graphite mineralisation from RÀÀpysjÀrvi project

Β 

Aitolampi, with a Mineral Resource Estimate of 26.7 million tonnes at 4.8 per cent total graphic carbon ("TGC") for 1,275,000 tonnes of contained graphite, is one of Europe's largest flake graphite resources. Metallurgical test-work has demonstrated the ability to produce a high-grade flotation concentrate, the potential feedstock for GAMP, that the particle size distribution for the project is amenable to Coated Spherical Graphite ("CSPG") production, and that the concentrate can be purified to over the 99.95% TGC level required for use in anodes.

Β 

Figure 4: Aitolampi project showing electromagnetic anomalism, drillhole collars and resource envelope

Β 

The RÀÀpysjÀrvi project, which lies 8 km to the north of Aitolampi, has not been drilled so has no defined resource. However, extensive surface sampling including trenching and geophysics has been undertaken. Results from this exploration activity indicate that RÀÀpysjÀrvi has the potential to be at least as large as the Aitolampi project, and the grades of surface material indicate that it may also be higher grade, with some samples exceeding 50% TGC, the limit of the analyses methodology. Metallurgical test-work of surface samples indicates it is similar to Aitolampi and amenable to use in anode manufacture.

Β 

Figure 5: RÀÀpysjÀrvi project showing electromagnetic anomalism, specific target areas and trench results

Β 

The primary focus of the next phase of exploration, when financial resources allow, will be to drill and define a mineral resource at RÀÀpysjÀrvi, with the objective of demonstrating the scale potential and confirming the surface grades extend to depth. If RÀÀpysjÀrvi proves to be a higher-grade deposit than Aitolampi, this has potentially significant implications for reducing operating costs, with lower volumes of ore to be mined and processed, and less tailings material produced for the same volume of product.

On 30 September 2025, the renewal of the RÀÀpysjÀrvi exploration licence came into full legal force. The licence, number ML2017:0104-02, covers an area of 479 hectares and remains valid for three years.

Β 

Enquiries:

Β 

Beowulf Mining plc

Ed Bowie, Chief Executive Officer ed.bowie@beowulfmining.com

Β 

SP Angel

(Nominated Adviser & Joint Broker)

Ewan Leggat / Stuart Gledhill / Adam Cowl Tel: +44 (0) 20 3470 0470

Β 

Alternative Resource Capital

(Joint Broker)

Alex Wood Tel: +44 (0) 20 4530 9160

BlytheRay

Tim Blythe / Megan Ray / Alastair Roberts Tel: +44 (0) 20 7138 3204

beowulf@blytheray.com

Β 

Β 

About Beowulf Mining plc

Β 

Beowulf Mining is a mining company with main activities in exploration and development in Sweden, Finland, and Kosovo. Beowulf's portfolio is diversified by commodity, geography, and stage of development of the projects, and consists primarily of iron ore, graphite, gold, and base metals. Beowulf Mining is headquartered in London, England.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
UPDDBLFXEKLFBBX
Date   Source Headline
3rd Dec 202111:06 amRNSSecond Price Monitoring Extn
3rd Dec 202111:00 amRNSPrice Monitoring Extension
3rd Dec 20219:06 amRNSSecond Price Monitoring Extn
3rd Dec 20219:01 amRNSPrice Monitoring Extension
2nd Dec 20212:06 pmRNSSecond Price Monitoring Extn
2nd Dec 20212:01 pmRNSPrice Monitoring Extension
2nd Dec 202111:06 amRNSSecond Price Monitoring Extn
2nd Dec 202111:00 amRNSPrice Monitoring Extension
2nd Dec 20217:00 amRNSLetter to Minister of Enterprise and Innovation
1st Dec 20219:01 amRNSShare Price Movement
29th Nov 20217:00 amRNSUnaudited Results Ended 30 September 2021
26th Nov 20214:02 pmRNSCEO Video Presentation
18th Nov 202112:15 pmRNSBeowulf Investor Q&A
9th Nov 20217:00 amRNSBeowulf live investor Q&A
22nd Oct 20217:00 amRNSKallak Update
14th Sep 20217:00 amRNSLetter to Minister Baylan
31st Aug 20217:00 amRNSSubmission to the Swedish Government
27th Aug 20217:00 amRNSUnaudited Financial Results Ended 30 June 2021
2nd Aug 20217:00 amRNS£100,000 investment in Vardar Minerals
15th Jul 20217:00 amRNSCEO Interview
14th Jul 20217:00 amRNSKallak Iron Ore Project Update
8th Jul 20217:00 amRNSExercise of Share Options
5th Jul 20217:00 amRNSShare Information
18th Jun 202112:05 pmRNSAGM Results and Annual Report Publication
15th Jun 20217:00 amRNSKallak Iron Ore Project, Letter to Minister Baylan
10th Jun 20217:00 amRNSShare Information
10th Jun 20217:00 amRNSFennoscandian receives Business Finland funding
9th Jun 20217:00 amRNSKallak Iron Ore Project – UNESCO comments
8th Jun 202111:05 amRNSKallak Iron Ore Project – UNESCO comments
28th May 20217:00 amRNSResults for the Period Ended 31 March 2021
25th May 20217:00 amRNSKallak MRE and Exploration Target Upgrade
17th May 20217:00 amRNSResults for the year ended 31 December 2020
14th May 20217:00 amRNSUpdated Corporate Presentation
20th Apr 20217:00 amRNSBeowulf publishes letter to Minister Baylan
12th Mar 20217:00 amRNSAitolampi Scoping Study Contract Awarded
8th Mar 20217:00 amRNSMemorandum of Understanding with EAMPL
26th Feb 20217:00 amRNSUnaudited Preliminary Financial Results
8th Feb 20217:00 amRNS£200,000 investment in Vardar Minerals
4th Feb 20214:40 pmRNSSecond Price Monitoring Extn
4th Feb 20214:35 pmRNSPrice Monitoring Extension
22nd Jan 20214:41 pmRNSSecond Price Monitoring Extn
22nd Jan 20214:36 pmRNSPrice Monitoring Extension
22nd Jan 20212:06 pmRNSSecond Price Monitoring Extn
22nd Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Jan 202111:06 amRNSSecond Price Monitoring Extn
22nd Jan 202111:00 amRNSPrice Monitoring Extension
21st Jan 20217:00 amRNSCEO Interview
14th Jan 20214:40 pmRNSSecond Price Monitoring Extn
14th Jan 20214:35 pmRNSPrice Monitoring Extension
14th Jan 202111:06 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.