George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE
George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’
George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’View Video
Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America
Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin AmericaView Video

Latest Share Chat

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Labrador Iron Mines – Preliminary Economic Assessment

9 Mar 2021 14:00

ANGLESEY MINING PLC - Labrador Iron Mines – Preliminary Economic Assessment

ANGLESEY MINING PLC - Labrador Iron Mines – Preliminary Economic Assessment

PR Newswire

London, March 9

9th March 2021 LSE:AYM

Labrador Iron Mines

Houston Preliminary Economic Assessment

Anglesey Mining plc (“Anglesey”) is pleased to report that Labrador Iron Mines Holdings Limited (“LIMH”) in which Anglesey has a 12% holding has released the details of a Preliminary Economic Assessment (“PEA”) on its 52% owned Houston Project.

Analysis

The Houston PEA which was prepared by Roscoe Postle Associates Inc of Toronto reviewed the development of the Houston and Malcolm deposits in Newfoundland and Labrador and in Quebec, Canada. The PEA suggests a production time frame of 12 years after an 18-month construction period. Iron ore production would amount to approximately 2 million tonnes per annum of 62% iron lump and sinter direct shipping ore. Initial capital cost including contingency is forecast at a relatively low US$65 million.

The forecast after tax financial results are strong with an NPV8 and an IRR at US$90 per tonne for 62% Fe ore of C$109 million and 39% respectively.

Using the current 62% Fe ore prices of US$160 per tonne increases these financial results to C$459 million and 209% respectively.

Further details can be found on the LIMH website at www.labradorironmines.ca

About Anglesey Mining plcAnglesey Mining is listed on the London Stock Exchange and currently has 221,975,732 ordinary shares in issue.

Anglesey is developing its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2020 reported resource of 5.2 million tonnes at 4.3% combined base metals in the Indicated category and 11.7 million tonnes at 2.8% combined base metals in the Inferred category. 

Anglesey holds an almost 20% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

Anglesey is currently reviewing other compatible base metal projects at advanced stages suitable for incorporation into the Anglesey Group.

 For further information, please contact: Bill Hooley, Chief Executive +44 (0)7785 572517Danesh Varma, Finance Director +44 (0)7740 932766

Date   Source Headline
29th Mar 20224:24 pmPRNBlocklisting - Interim Review
11th Mar 202210:00 amRNSSchedule One - Anglesey Mining plc
11th Mar 202210:00 amPRNAppendix to Schedule One
9th Mar 20225:57 pmPRNProposed Move to AIM
9th Mar 20227:00 amPRNAppendix to Schedule 1 announcement
9th Mar 20227:00 amPRNSchedule 1
8th Mar 202211:31 amPRNGeneral meeting approves move to AIM
23rd Feb 20222:22 pmPRNShare purchase by chief executive
17th Feb 20227:00 amPRNOperations and Corporate Update
11th Feb 202211:05 amPRNAnglesey Mining - Proposed Move to AIM
20th Dec 202111:42 amPRNAppointment of two new Non-Executive directors
13th Dec 20217:00 amPRNHolding(s) in Company
9th Dec 20217:00 amPRNGrängesberg Iron Ore Pre-Feasibility Study Commenced
26th Nov 20217:00 amPRNDrilling commences at Parys Mountain
12th Nov 20217:00 amPRNInterim report at 30 September 2021
20th Oct 20217:00 amPRNDrilling to commence at Parys Mountain in November
18th Oct 20211:00 pmPRNMajor shareholder notification
15th Oct 20214:41 pmRNSSecond Price Monitoring Extn
15th Oct 20214:35 pmRNSPrice Monitoring Extension
8th Oct 20217:00 amPRNAdditional funding secured and work programmes approved
30th Sep 20211:58 pmPRNChairman's AGM Statement - September 2021
30th Sep 20211:00 pmPRNResults of September AGM, Voting and Total Voting Rights
24th Sep 20211:03 pmPRNBlocklisting - Interim Review
8th Sep 20217:00 amPRNAnglesey Mining Financial Results and way forward
3rd Sep 20217:00 amPRNFinal Results for year ended 31 March 2021
18th Aug 20214:41 pmRNSSecond Price Monitoring Extn
18th Aug 20214:35 pmRNSPrice Monitoring Extension
4th Aug 20214:36 pmRNSPrice Monitoring Extension
29th Jul 20212:06 pmRNSSecond Price Monitoring Extn
29th Jul 20212:00 pmRNSPrice Monitoring Extension
29th Jul 20219:42 amPRNNew Chief Executive, Annual Report & Operations Updates
30th Jun 20212:25 pmPRNLabrador Iron Mines Annual Results, Plans for Houston
14th May 20217:00 amPRNCorrection : Director/PDMR Shareholding
10th May 20214:53 pmPRNDirector/PDMR Shareholding
10th May 20219:05 amRNSSecond Price Monitoring Extn
10th May 20219:00 amRNSPrice Monitoring Extension
28th Apr 20212:00 pmRNSPrice Monitoring Extension
6th Apr 20214:41 pmRNSSecond Price Monitoring Extn
6th Apr 20214:36 pmRNSPrice Monitoring Extension
1st Apr 20211:04 pmPRNTotal Voting Rights
16th Mar 20213:27 pmPRNIssue of shares and director/PDMR Shareholding
10th Mar 20214:41 pmRNSSecond Price Monitoring Extn
10th Mar 20214:36 pmRNSPrice Monitoring Extension
10th Mar 20212:05 pmRNSSecond Price Monitoring Extn
10th Mar 20212:00 pmRNSPrice Monitoring Extension
10th Mar 202111:05 amRNSSecond Price Monitoring Extn
10th Mar 202111:00 amRNSPrice Monitoring Extension
9th Mar 20214:41 pmRNSSecond Price Monitoring Extn
9th Mar 20214:36 pmRNSPrice Monitoring Extension
9th Mar 20212:00 pmPRNLabrador Iron Mines – Preliminary Economic Assessment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.