Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Labrador Iron Mines Annual Results, Plans for Houston

30 Jun 2021 14:25

ANGLESEY MINING PLC - Labrador Iron Mines Annual Results, Plans for Houston

ANGLESEY MINING PLC - Labrador Iron Mines Annual Results, Plans for Houston

PR Newswire

London, June 30

30th June 2021 LSE:AYM

Labrador Iron Mines Annual Financial Results Plans for Houston

Anglesey Mining plc (“Anglesey”) is pleased to report that Labrador Iron Mines Holdings Limited (“LIMH”) in which Anglesey has a 12% holding has released its financial results for the year ending 31st March 2021 which includes commentary on LIMH’s operational and funding plans for the Houston Project.

This release can be found on LIMH’s website at www.labradorironmines.ca

The key points in the Houston plans are:

Houston Operations

(i) Complete metallurgical test work of drill core collected from the Houston Project in a 2013 bulk sample, which is currently in storage. Results of the test work will be used to refine the product specifications and process flowsheet assumed in the Preliminary Economic Assessment. Among other things, this analysis will yield important product characterisation information which could be helpful in marketing the product.

(ii) Complete a trade-off study on use of LIM’s Redmond property rail right-of-way for the Houston Project’s rail loading operations. Although a longer truck haul is required (approximately 1.5 km greater), the Redmond property rail right-of-way was formerly used for loading iron ore trains (by IOC) and includes an existing rail bed with a rail loop at the end to turnaround, versus the current proposed Houston rail siding operation, which requires the train to be split multiple times.

(iii) Update the surface water management plan for the mine site based on the proposed localized handling and treatment of surface contact water.

(iv) Reactivate all necessary regulatory permits and approvals for construction.

(v) Continue engagement with adjacent First Nations communities.

(vi) Advance commercial negotiations with construction contractors, equipment vendors, rail, port and logistics counterparties.

(vii) Further refine the environmental and health and safety plans.

(viii) Further develop the human resources and recruitment plans.

(ix) Complete an off-take contract, including construction financing and product sale components.

LIMH believes successful completion of these initiatives will favourably impact the terms of construction financing, which will be required in 2022.

Houston Funding

In order to fund its planned near-term initiatives, the Company plans to complete a working capital financing of approximately $2.5-$5 million. The Company is exploring various working capital financing alternatives including a potential private placement of equity. Various future construction financing alternatives being considered for 2022 include, without limitation, an advance payment component of an off-take contract, equipment leasing arrangement(s), potential project partners, potential government funding and potential equity financing.

Anglesey Annual Report

Anglesey has been working on completion and auditing of its Annual Report for the year ended 31st March 2021. This will be published shortly and will contain updates on operational and funding progress at the Companies Parys Mountain copper-zinc-lead project in North Wales.

About Anglesey Mining plcAnglesey Mining is listed on the London Stock Exchange and currently has 225,475,732 ordinary shares in issue.

Anglesey is developing its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2020 reported resource of 5.2 million tonnes at 4.3% combined base metals in the Indicated category and 11.7 million tonnes at 2.8% combined base metals in the Inferred category. 

Anglesey holds an almost 20% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

Anglesey continues to review other compatible base metal projects at advanced stages suitable for incorporation into the Anglesey Group.

 For further information, please contact: 

Bill Hooley, Chief Executive +44 (0)7785 572517

Danesh Varma, Finance Director +44 (0)7740 932766

Date   Source Headline
18th Apr 202411:25 amPRNBlocklisting - Interim Review
18th Apr 20247:00 amPRNAppointment of new CEO
13th Mar 20247:00 amPRNFurther drilling results confirm scale of Northern Copper Zone at Parys Mountain
20th Feb 20247:00 amPRNNorthern Copper Zone Drilling Update - Broad Zone of Sulphides Intersected in Hole NCZ002
19th Jan 20247:00 amPRNParys Mountain drilling returns strong assays including 22.0m at 3.7% CuEq
19th Dec 202312:01 pmPRNHalf-year Report
13th Dec 20238:45 amPRNParys Mountain - Northern Copper Zone Drilling Update
7th Dec 202310:54 amPRNHolding(s) in Company
7th Dec 202310:52 amPRNHolding(s) in Company
5th Dec 20237:00 amPRNParys Mountain - Northern Copper Zone Drilling Update
4th Dec 20237:00 amPRNParys Mountain - Positive Preliminary Results from Metallurgical Testwork
29th Nov 20237:00 amPRNHolding(s) in Company
14th Nov 20237:00 amPRNDirectorate Change
27th Oct 20233:21 pmPRNResult of AGM
26th Oct 20239:48 amPRNParys Mountain - Exploration and Drilling Update
5th Oct 20237:00 amRNSResignation of Chief Executive Officer
2nd Oct 20239:00 amPRNBlocklisting - Interim Review
25th Sep 20237:00 amPRNAnnual Financial Report
23rd Aug 20239:28 amPRNNotification of Major Holding(s)
3rd Aug 202310:29 amPRNHolding(s) in Company
3rd Aug 20237:00 amPRNParys Mountain - Exploration and Drilling Update
25th Jul 202312:44 pmPRNResult of Placing
25th Jul 20237:00 amPRNProposed Placing to raise approximately £0.5m
28th Jun 202311:42 amPRNHolding(s) in Company
5th Jun 20231:30 pmRNSHolding(s) in Company
24th May 20237:00 amRNSHolding(s) in Company
28th Mar 20232:05 pmRNSSecond Price Monitoring Extn
28th Mar 20232:00 pmRNSPrice Monitoring Extension
10th Jan 202311:05 amRNSSecond Price Monitoring Extn
10th Jan 202311:00 amRNSPrice Monitoring Extension
10th Jan 20239:05 amRNSSecond Price Monitoring Extn
10th Jan 20239:00 amRNSPrice Monitoring Extension
6th Jan 20234:40 pmRNSSecond Price Monitoring Extn
6th Jan 20234:35 pmRNSPrice Monitoring Extension
6th Jan 20232:05 pmRNSSecond Price Monitoring Extn
6th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 202311:05 amRNSSecond Price Monitoring Extn
6th Jan 202311:00 amRNSPrice Monitoring Extension
13th Dec 20224:35 pmRNSPrice Monitoring Extension
22nd Aug 20222:05 pmRNSSecond Price Monitoring Extn
22nd Aug 20222:00 pmRNSPrice Monitoring Extension
8th Jun 20227:00 amRNSDeath of Bill Hooley - Deputy Chairman & Director
17th May 20224:41 pmRNSSecond Price Monitoring Extn
17th May 20224:36 pmRNSPrice Monitoring Extension
17th May 20227:00 amRNSResult of Placing and Subscription
16th May 20225:15 pmRNSProposed Placing and Subscription
13th Apr 20227:00 amPRNDirector/PDMR Shareholding
8th Apr 20228:00 amRNSRemoval- ANGLESEY MINING PLC
8th Apr 20227:00 amPRNAnglesey Mining - Admission to AIM
5th Apr 20225:30 pmRNSAnglesey Mining PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.