focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.50
Bid: 1.40
Ask: 1.60
Change: 0.13 (9.49%)
Spread: 0.20 (14.286%)
Open: 1.50
High: 1.50
Low: 1.50
Prev. Close: 1.37
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grangesberg NI 43-101 Resource Estimate

29 Sep 2014 10:00

ANGLESEY MINING PLC - Grangesberg NI 43-101 Resource Estimate

ANGLESEY MINING PLC - Grangesberg NI 43-101 Resource Estimate

PR Newswire

London, September 26

Anglesey Mining plc 29 September 2014 LSE:AYM Grangesberg NI 43-101 Resource Estimate Anglesey Mining plc ("Anglesey") is pleased to report that Grangesberg Iron AB("GIAB") has received an NI 43-101 Technical Report from Roscoe PostleAssociates Inc ("RPA") showing a compliant resource estimate for theGrangesberg Mine. In May 2014 Anglesey announced that it had entered into agreements giving itthe right to acquire a controlling interest in the Grangesberg Iron project incentral Sweden including a direct 6% interest in GIAB and an option exercisableuntil 30th June 2015 to acquire an additional 51% in GIAB. Anglesey alsoentered into shareholder and cooperation agreements such that during the termof the option Anglesey holds management control and operatorship of GIAB andhas appointed three out of five directors to the board of GIAB including theChairman. The Technical Report which was prepared by RPA and was dated 26th Septembercontains the following summary table: Mineral Resource Estimate Summary - August 22, 2014 Grängesberg Iron AB - Grängesberg Iron Mine Category Tonnes %Fe %P Contained Fe (tonnes) Indicated 115,200,000 40.2 0.78 46,300,000 Inferred 33,100,000 45.2 0.91 15,000,000 Notes: CIM definitions were followed for Mineral Resources. The values for tonnages, grades and contained iron have been rounded. Mineral Resources are estimated at a cut-off grade of approximately 20% Fe. A minimum mining width of approximately 10 m was used. RPA concluded that the Grängesberg iron ore deposit hosts a significant ironresource that has excellent potential for expansion at depth. Geophysicalinterpretations from the 1960s suggest that the ore body continues to at least1,700 m below surface. Diamond drill holes confirm the mineralization continuesto at least 1,100 m to 1,200 m below surface. In RPA's opinion, moregeotechnical, metallurgical, and other engineering studies are warranted toadvance this Project. "We are very pleased with the compliant resource estimate contained within theRPA report", said Bill Hooley, Chief Executive of Anglesey, "This confirms ourbelief in the inherent fundamentals of Grangesberg and we look forward tomoving the project through the next development stages with a target ofrestarting production around 2018 when we believe that the global iron oresupply-demand will be in a more balanced position than currently. We remainencouraged by the support being shown for the project at all levels in Sweden." A programme is currently being developed to look closely at geo-mechanical andhydro-geological aspects of the site which will be critical components of thepermitting regime required for the dewatering and reopening of the mine. Theprincipal consultant who will oversee this work has commenced activities;drilling quotations have been obtained; and permit applications for thenecessary work have been submitted to the relevant authorities. Theseactivities will include drilling boreholes into the general mine area and thecapture and interpretation of key data on the physical aspects of the groundand hydrological conditions. It is expected that all the drilling and analysiswill be completed during the autumn and will allow the first stage of permitapplications for mine development to be prepared and submitted. The full RPA report can be found at https://app.box.com/GIABreportSep14 and will also be published shortly on the Anglesey website at www.angleseymining.co.uk The Annual General Meeting of Anglesey will be held at 11am on Tuesday 30thSeptember at the offices of DLA Piper, 1 London Wall EC2Y 5EA, London.Shareholders are invited to attend. About Anglesey Mining plc Anglesey is also carrying out exploration and development work at its 100%owned Parys Mountain zinc-copper-lead deposit in North Wales, UK where a JORCCode-compliant resource of 2.1mt at 6.9% combined base metals in the indicatedcategory and 4.1mt at 5.0% combined in the inferred category was published inNovember 2012. The Company has received a detailed review of the resource basefor the entire site which has recently been completed by Micon Internationaland is evaluating these results. The company continues to review the futuredemand predictions for base metal concentrates particularly zinc ahead of anydecision to move to development and production. In May 2014 Anglesey acquired the rights to earn a 57% interest in theGrangesberg iron ore mine. The Grangesberg iron ore mine is situated in themineral-rich Bergslagen district of central Sweden about 200 kilometresnorth-west of Stockholm. Until its closure in 1989 due to prevailing marketconditions, the Grangesberg mine was the third largest iron ore mine in Sweden,with in excess of 150 million tonnes of iron ore having been mined down toaround 500 metres deep. Anglesey holds 15.3% of the shares of Labrador Iron Mines Holdings Limitedwhich over the three years 2011 to 2013 produced about 3.5 million tonnes ofiron ore from its operations in Canada, all of which was sold in the China spotmarket. For further information, please contact: Bill Hooley, Chief Executive +44 (0)1492 541981; Danesh Varma, Finance Director +44 (0)207 6539881;

Samantha Harrison: RFC Ambrian +44 (0)20 3440 6800;

Date   Source Headline
29th Sep 201410:00 amPRNGrangesberg NI 43-101 Resource Estimate
30th Jul 20143:27 pmPRNAnnual Financial Report
2nd Jul 20143:38 pmPRNProjects update; LIM releases year end financials
29th May 20147:00 amPRNAcquisition of controlling interest in Grangesberg Iron
1st Apr 20145:00 pmPRNBlocklisting - Interim Review
4th Dec 201311:10 amPRNLIM completes third operating year
25th Nov 20137:00 amPRNHalf-yearly Report 30 September 2013
15th Nov 201311:37 amPRNLabrador Iron Mines Reports Second Quarter Results
7th Oct 20137:00 amPRNBlocklisting - Interim Review
25th Sep 20137:34 amPRNResult of AGM
19th Sep 20131:09 pmPRNLIM - Annual General Meeting
18th Sep 201311:23 amPRNLIM finalises joint venture agreement with Tata
15th Aug 201311:12 amPRNInterim Management Statement and LIM results
1st Aug 201310:26 amPRNDirectorate Change
23rd Jul 20133:02 pmPRNAnnual Financial Report
3rd Jul 201311:15 amPRNLIM March 2013 year-end results and operational update
27th Jun 20137:51 amPRNLIM reschedules conference call
24th Jun 201311:03 amPRNLIM - Elizabeth taconite resource
7th Jun 201312:08 pmPRNLIM First iron ore shipments of 2013
23rd May 201312:25 pmPRNLIM – 33% increase in year-end mineral resource
14th May 201311:13 amPRNLIM signs new sales and off-take agreements
8th Apr 20131:49 pmPRNHolding(s) in Company
2nd Apr 201312:57 pmPRNBlocklisting - Interim Review
12th Mar 201311:13 amPRNLIM arrangement with Tata Steel Minerals Canada
15th Feb 201312:19 pmPRNIMS and LIM third quarter results
13th Feb 20132:10 pmPRNLIM completes C$29 million equity financing
21st Jan 20137:00 amPRNLIM equity financing
18th Jan 201310:44 amPRNLIM Announces Unit Equity Financing
17th Jan 20138:58 amPRNLIM announces equity financing
3rd Jan 20134:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20134:35 pmRNSPrice Monitoring Extension
31st Dec 201212:40 pmRNSSecond Price Monitoring Extn
31st Dec 201212:35 pmRNSPrice Monitoring Extension
18th Dec 201212:05 pmPRNLIM Completes 2012 Exploration Program
30th Nov 20127:00 amPRNNew JORC compliant resource estimate for Parys Mountain
26th Nov 20127:00 amPRNAnglesey half yearly report and management statement
21st Nov 20124:39 pmPRNLIM appoints new CFO and director
15th Nov 201212:07 pmPRNLIM second quarter results
6th Nov 20121:48 pmPRNLIM C$30 million financing - Anglesey subscribes C$1.5m
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
2nd Oct 20127:00 amPRNLIM announces C$30 million equity financing
24th Sep 20124:40 pmRNSSecond Price Monitoring Extn
24th Sep 20124:35 pmRNSPrice Monitoring Extension
14th Sep 20127:00 amPRNLIM AGM and Operations Update
11th Sep 20122:15 pmPRNDirector/PDMR Shareholding
7th Sep 201212:20 pmPRNResult of AGM held 6 Sept 12
4th Sep 201211:09 amPRNLIM Operations Update and Outlook
15th Aug 201212:09 pmPRNIMS and LIM first quarter results
10th Aug 201212:15 pmPRNLIM new rail feasibility study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.