We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Anglesey Mining Financial Results and way forward

8 Sep 2021 07:00

ANGLESEY MINING PLC - Anglesey Mining Financial Results and way forward

ANGLESEY MINING PLC - Anglesey Mining Financial Results and way forward

PR Newswire

London, September 7

8 September 2021

Anglesey Mining plc

(“Anglesey” or “the Company”)

Anglesey Mining Financial Results and way forward

Anglesey Mining plc (LSE:AYM), the global minerals exploration and development company, is pleased to announce the release of its full year financial result for 2021, for the year ending 31 March 2021, and provide an update for investors on the Company’s plans for the coming year.

Highlights

Comprehensive profit of £3.7m compared to the prior year comprehensive loss of £0.3m Successful fund raisings totalling £1.1m Completion of key operating milestones at Parys Mountain, including the release of an updated PEA During the current financial year, the Company will commence work on a Feasibility Study at the Parys Mountain Cu-Zn-Pb-Ag-Au project and update the Pre-Feasibility Study on the Grängesberg Iron Ore Project in Sweden

Jo Battershill, the recently appointed CEO & Managing Director of Anglesey Mining, commented: “Both the Parys Mountain project and the Grängesberg project have all the hallmarks of long life, highly cash generative mine developments. At Parys Mountain, the natural sequence of events through to a decision to mine and financing will require a Feasibility Study, including the environmental baseline studies, which we aim to commence very shortly.

The initial steps of the study will include infill drilling to convert inferred resources within the White Rock and Engine Zones into the higher confidence indicated category and geotechnical drilling to assist with mine optimisation planning together with the provision of bulk samples for confirmatory metallurgical testwork. The exploration upside at the project remains significant and we very much look forward to completing a review of the historical data over the next few months and pushing ahead with further exploratory programmes.

I am very excited about the development opportunity here at Parys Mountain with a project that will generate significant employment on Anglesey and the greater region for a generation. All of the commodities available for extraction at Parys Mountain are critical to the supply chain for the global push of decarbonisation and electrification of the economy and will remain in strong demand over the coming decades.

Given that the green economy cannot be advanced without the extractive industries, we will maintain a continued focus on the sustainable development of our resource projects with the use of appropriate environmentally friendly solutions where possible. We also believe the development of our projects will enable the shortening of global supply chains with the commensurate reductions in carbon emissions – particularly the high-grade iron ore concentrate that will be produced from the Grängesberg iron ore project in Sweden.”

Anglesey Mining plc (“Anglesey”) announces the recent publication of its Annual Report and Accounts for the year ended 31 March 2021.

Anglesey is pleased to report comprehensive income for the year of £3.7 million and the achievement of several key operational milestones over the past year, including significant progress on the Parys Mountain copper-zinc-lead project on the island of Anglesey in North Wales, in our iron ore projects in Sweden and Canada, and in raising new financing of £1,068,200.

Financial results

There were no revenues from the operation of the properties. The Company recorded a gain of £4,053,506 in the value of the group’s holding in Labrador Iron Mines and this has been reported in other comprehensive income, resulting in total comprehensive profit for the year of £3,714,921, compared to a comprehensive loss for the prior year of £327,860.

The loss before other comprehensive income for the year ended 31 March 2021 after tax was £328,518 compared to a loss of £304,510 in the 2020 fiscal year. The administrative and other costs excluding investment income and finance charges were £162,824 compared to £134,796 in the previous year. 

The successful placement of shares during the year resulted in a cash inflow of £1,068,200, after fees and expenses. The cash balance at 31 March 2021 was £891,767. These funds will be used for ongoing work on the Parys Mountain project, as well as for general corporate purposes.

Financial position

At 31 March 2021 the Group held mineral property exploration and evaluation assets with a carrying value of £15.3 million.

These carrying values are supported by the results of the 2021 Preliminary Economic Assessment of the Parys Mountain project which estimated a pre-tax net present value, discounted at 10%, of £96 million under Case C, which assumed very conservative commodity prices including US$2.81/lb Cu, US$1.20/lb Zn and US$16.67/oz Ag compared to current prices of US$4.28/lb, US$1.36/lb and US$24.68/oz respectively, but may not reflect the realizable value of the properties if they were offered for sale at this time.

At 31 March 2021 there were 225,475,732 ordinary shares in issue (2020 – 186,975,732), the increase being due to the financing events referred to above. At 2 September 2021 there were 225,475,732 ordinary shares in issue. We are pleased to provide the following review and update on the projects and prospects for the Group.

The Way Forward - Future Steps

The PEA demonstrates that a major copper-zinc-lead mine can be developed at Parys Mountain. The results show that once in production Parys Mountain should be able to make very positive financial returns. Nevertheless, as always in the mining industry, there are a number of sequential steps that need to be taken to move any project from the PEA to a full committed decision to proceed to production and these steps do take some time to reach fruition. 

The key to this development is now securing the necessary finance to continue to move the project towards production. The PEA indicated a pre-production capital expenditure of $99 million. This together with all other pre-decision project costs as well as ongoing corporate costs needs to be financed.

From the feedback received, it has become clear that financing opportunities would be enhanced with some additional work to further de-risk the project and it can be expected that a project financing route will require the delivery of a feasibility study. Micon made recommendations regarding further technical studies to better quantify some aspects of the mining and processing operations, and trade-off studies to determine the best overall mining schedules, metallurgical flowsheet and infrastructure design to further optimise the project, which should lead to improved economics to be included in a feasibility study and improve the overall financial capability of the project.

Following the Micon PEA recommendations, a step series of activities have been identified that will form the necessary preparatory work as a prelude to the commissioning of a feasibility report. These include a surface diamond drilling programme to increase the confidence in some parts of the White Rock zone ahead of first underground development in some of those areas of the resource that are currently classified as Inferred. Such increased data would be aimed at converting parts of the resource to the Indicated category and thereby increasing the bankability of those parts of the resources. Simultaneously drill core samples would be collected for metallurgical testing purposes and these samples would then be subject to process testing to improve the flow-sheet design that has currently been developed. 

Whilst Anglesey holds the necessary planning permissions to build a mine at the site, these must be supported by the grant of various environmental operating licenses. This will require collection of further environmental base-line data and a programme of environmental base line data collection is planned, both for inclusion in a formal feasibility report and as a pre-requisite ahead of any formal decision to commence operations.

The Parys Mountain property has a high potential for the discovery of additional mineral resources. There are drill intercepts outside of the planned mining blocks indicating mineralisation may extend into other areas of sparse drilling immediately adjacent to the reported Mineral Resources. Micon included additional exploration costs of $1.6 million for Cases A and B and $7.5 million for Case C. However, much of this additional drilling recommended for Case C, to upgrade the category of the resource in the second half of the project mine life from Inferred to Indicated, should ideally be carried out from an underground drill drive from the area around the bottom of the shaft and would not necessarily be undertaken until some years into the project.

At the end of March 2021, the group had cash resources of £892,000. Following a careful review of the financial resources currently available and considering the normal on-going costs of corporate and site operations, it has been decided that these three activities will be commenced forthwith, and as additional funding become available this programme will be accelerated.

Performance

The Group holds interests in exploration and evaluation properties and, until a mine is placed into production, there are no standardised performance indicators which can usefully be employed to gauge performance. The publication of the independent Preliminary Economic Assessment on the Parys Mountain project in January 2021, which built upon the optimisation studies successfully completed over the previous two years, and included a new expanded mineral resource estimate, with a financial model for an expanded case at 3,000 tpd which indicated a pre-tax NPV10% of £96 million and a 26% IRR, demonstrated a significant improvement on previous studies and steady progress.

The chief external factors affecting the ability of the Company to move its projects forward are primarily the demand for metals and minerals, levels of metal prices and the market sentiment for investment in mining and mineral exploration companies.

A unique and timely opportunity

Development of a new mine at Parys Mountain, producing copper, zinc and lead with gold and silver credits, can deliver economic growth in the UK, regional jobs for the community and business opportunities for local service providers. Hardly any of these critical and strategic metals, essential for reduction in our carbon footprint and transition to a green economy, are currently produced in the UK leaving the country entirely dependent on imports. This creates a unique and timely opportunity, both for Anglesey Mining and for the UK, to develop a new, modern, mine at Parys Mountain in an environmentally sustainable manner.

About Anglesey Mining plc

Anglesey Mining is listed on the London Stock Exchange and currently has 225,475,732 ordinary shares in issue.

Anglesey is developing its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2020 reported resource of 5.2 million tonnes at 4.3% combined base metals in the Indicated category and 11.7 million tonnes at 2.8% combined base metals in the Inferred category. 

Anglesey holds an almost 20% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

For further information, please contact:

Jo Battershill, CEO/MD +44 (0)7540 366000

John Kearney, Chairman + 1 416 362 6686

Date   Source Headline
26th Oct 201112:31 pmPRNHolding(s) in Company
4th Oct 20117:00 amPRNFirst shipment of LIM iron ore sails to China
23rd Sep 20118:30 amPRNLIM reviews mine start-up at its AGM
13th Sep 20117:00 amPRNLIM added to S & P / TSX smallcap index
8th Sep 20119:11 amPRNResult of AGM
6th Sep 201111:00 amPRNLIM production update - second ore train operating
25th Aug 20111:42 pmPRNAnnual Report and Accounts
19th Aug 20113:00 pmPRNInterim Management Statement & LIM update
19th Aug 20112:12 pmPRNInterim Management Statement
15th Aug 201112:09 pmPRNLIM signs iron ore sales agreement
28th Jul 20117:00 amPRNFinal Results
5th Jul 201112:16 pmPRNTransfer of part of director's shareholding
30th Jun 201112:12 pmPRNLIM operations update & annual financial results
7th Jun 20112:42 pmPRNLIM agreement with Innu Matimekush
27th May 20111:23 pmPRNLIM mining & plant commissioning underway
19th May 20111:17 pmPRNChange of Adviser - Ambrian appointed as broker
28th Apr 20111:13 pmPRNLIM rail agreement with Genesee
27th Apr 20117:08 amPRNLIM equity financing C$110m completed
21st Apr 20112:30 pmPRNHolding(s) in Company
5th Apr 20115:03 pmPRNLIM equity financing of C$110 million
5th Apr 20113:56 pmPRNIssue of equity & director's share dealing
5th Apr 20112:55 pmPRNApplication for Block Listing
5th Apr 201110:02 amPRNEquity financing for Labrador Iron
29th Mar 201112:15 pmPRNLIM's Houston deposit shows increased resources
18th Mar 20117:00 amPRNLIM technical report on iron ore projects
10th Mar 201112:26 pmPRNLIM Signs Rail Transportation Agreement
4th Mar 20115:14 pmPRNNew resource estimate at LIM's Denault deposit
25th Feb 20117:00 amPRNLIM Railway Agreement
18th Feb 20115:02 pmPRNInterim Management Statement
15th Feb 20113:52 pmPRN3rd Quarter Results for LIM and outlook
11th Feb 20113:05 pmPRNDrilling Report - LIM’s Houston Deposits
10th Jan 20118:01 amPRNIssue of Equity - share placing
21st Dec 20102:06 pmPRNLIM’s Mine Construction Nearing Completion
20th Dec 201012:11 pmPRNLIM signs Agreement with Uashaunnuat Innu
26th Nov 20107:00 amPRNHalf-Yearly Report
26th Nov 20107:00 amPRNHalf-Yearly Report
15th Nov 201011:23 amPRNHalf-yearly Report LIM
22nd Oct 201012:25 pmPRNLIM on Target to Complete Plant Construction by Year End
24th Sep 20103:42 pmPRNResult of AGM and Total Voting Rights
20th Sep 20104:23 pmPRNHolding(s) in Company
16th Sep 20107:00 amPRNTrading Statement - Labrador AGM
14th Sep 20103:00 pmPRNTrading Statement - Labrador Iron Operations Approved
10th Sep 20107:00 amPRNTrading Statement - Agreement with Naskapi Nation
3rd Sep 201010:00 amPRNTrading Statement - Labrador barriers to be removed
27th Aug 201011:53 amPRNInterim Management Statement
16th Aug 201012:05 pmPRNTrading Statement - Labrador Q1 results and update
29th Jul 20107:00 amPRNon Labrador Iron operations
22nd Jul 20101:32 pmPRNFinal Results
12th May 20094:41 pmRNSSecond Price Monitoring Extn
12th May 20094:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.