Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAura Egy Regulatory News (AURA)

Share Price Information for Aura Egy (AURA)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.00 (0.00%)
Bid:
6.50
Ask:
7.50
Spread: 1.00 (15.385%)
Market Cap: £71.36m
AURA Live PriceLast checked at - London Stock Exchange

Intraday Aura Egy Share Chart

Technical & Finance Update for Tiris Project

25 Sep 2019 07:26

RNS Number : 5870N
Aura Energy Limited
25 September 2019
 

25 September 2019

AURA ENERGY LIMITED

 

("Aura" or the "Company")

 

technical and finance update for Tiris Project

 

additional water drilling yielding good results

 

post DFS enhancement projects commenced

 

AURA RECEIVES POSITIVE INITIAL FEEDBACK ON

EXPORT CREDIT AGENCY (ECA) FINANCE PROCESS

 

Aura Energy Limited (AEE; ASX, AURA; AIM) is pleased to provide an update regarding the significant work which has continued on the Tiris Uranium Project on various fronts since the release of the Tiris Uranium Definitive Feasibility Study (DFS).

The key areas have been;

1. Continuation of water drilling program

2. Commencement of post-DFS Enhancement Projects for Tiris

3. Strong initial feedback for financing Tiris with Export Credit Agency Finance support

"With the full water program progressing well above expectations, the strong upside expected from the various Tiris enhancement projects, the positive early feedback from the second round of the Export Credit Agency Finance process for Tiris funding, and the positive sentiment on uranium from the recent London World Nuclear Authority conference, Aura is confident that it will shortly have all the building blocks in position to commence development of this compelling uranium project", Peter Reeve Aura Energy's Executive Chairman said.

TIRIS WATER PROGAM

Following a period of initial geophysical evaluation Aura has been conducting a significant and broad based round of water drilling for the Tiris uranium project since the middle of 2019 which has reported significant success. Of 5 targets tested to date, 2 have reported significant water flows, a strong validation of the geophysical program.

As previously reported the water program is testing targets generated from the geophysics and is focussing on targets within 30 km of the proposed Tiris plant site. The current drilling program will test 9 or 10 of the highest priority targets.

Results to date are summarised in Figure 1

 

Figure 1: Tiris water targets. Background image is RTP regional magnetics highlighting potentially water bearing structures.

Target 22 yielded the following water, based on air-lift water flow measurement:

·; 30-44m: 14,000 Lt/hr

Conductivity of this water was reported at 3200 µS/cm which indicates it is only moderately saline. For comparison, potable water is generally

Target 10 has yielded a flow of ;

·; 63m: 3000 Lt/hr

 The drilling rig encountered mechanical problems at 69m and the hole is not yet complete.

Ironically the Sahara region has experienced unusually heavy rainfall in the last week making movement difficult and drilling has been temporarily suspended for approximately 10 days until access is again possible.

Aura believes the current results, including the photo of current drilling below (see Image 1), confirm its longheld position that significant water exists within the Oued el Foule Depression as discovered in a number of the deeper drillholes during evaluation drilling into the Tiris uranium mineralisation.

 

Image 1: Image of Tiris water drilling flow test last week.

 

 

TIRIS PROJECT ENHANCEMENT STUDIES

Aura has also commenced preliminary work on various studies to improve upon the outcomes of the Tiris DFS and these studies are as follows;

1. Conversion of additional Resources to Reserves

2. Extension of the known Mineral Resource Base

3. Recovery of vanadium from the process streams

4. Further reduction of the operating cost via mining initiatives and cut-off grade

These studies are expected to provide strong improvement to the Tiris DFS outcomes and have been flagged by our ECA Finance advisors as being important in the next round of ECA Finance negotiations.

 

TIRIS EXPORT CREDIT AGENCY FINANCE PROCESS

As previously advised Aura has been progressing a financing strategy for the Tiris project with the debt portion focussed around the low-interest coupon ECA finance. This process, through its London-based financial advisory firms, SD Capital Advisory Limited and GKB Ventures Limited, has continued and recently met with positive feedback.

At this stage seven Export Credit Agencies have expressed ongoing interest in reviewing the Tiris Finance Package and this included some of the major ECAs. A number of these agencies have indicated interest to act on a sole basis.

There was good interest and capacity in funding Mauritanian projects with some ECAs indicating ability to provide Direct Lending at OECD CIRR* rates and also indications they are able to provide guarantees covering 100% of the political risks and 100% for the commercial risks.

 

This ECA process was not a formal application process and none of the responses are a formal indication to provide financing support for the projects. The Company has not completed any formal agreement at this time with an ECA.

 

*Commercial Interest Reference Rate are the official lending rates of Export Credit Agencies. They are calculated monthly and are based on government bonds issued in the country's domestic market for the country's currency

 

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

For more information please visit www.auraenergy.com.au or contact the following:

Aura Energy Limited

Peter Reeve (Executive Chairman)

 

SP Angel Corporate Finance LLP

(Nominated Adviser and Joint Broker)

Ewan Leggat

Jamie Spotswood

 

WH Ireland Limited

(Joint Broker)

Adrian Hadden

James Sinclair-Ford

 

Yellow Jersey PR Limited

Felicity Winkles

Joe Burgess

 

Telephone: +61 (3) 9516 6500

info@auraenergy.com.au

 

Telephone: +44 (0) 203 470 0470

 

 

 

 

Telephone: +44 (0) 207 220 1666

 

 

  

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDSEFSMIFUSEEU
Date   Source Headline
5th Jun 20269:36 amRNSIssue of Equity, Appendix 2A+3Y & Cleansing Notice
2nd Jun 20267:00 amRNSMOU signed with major nuclear utility
30th Apr 20267:00 amRNSNotice of Expiry of Listed Options
30th Apr 20267:00 amRNSActivities Report March Quarter 26 Appendix 5B
24th Apr 20267:00 amRNSHäggån Deposit Proposed as National Interest
31st Mar 20269:50 amRNSAppendix 3Y & PDMR Notification
13th Mar 20267:12 amRNSHalf Year Report
13th Mar 20267:12 amRNSHalf Year Report
12th Mar 20268:29 amRNSHäggån Project Transaction Update
10th Feb 20267:01 amRNSCompletion of Placement and Cleansing Notice
10th Feb 20267:00 amRNSAppendix 2A
2nd Feb 20268:39 amRNSAppendix 3B
2nd Feb 20268:26 amRNSA$20 million Placement
30th Jan 202610:13 amRNSActivities Report December Quarter 25 Appendix 5B
30th Jan 20269:05 amRNSASX Trading Halt Update
30th Jan 20267:00 amRNSASX Trading Halt
23rd Jan 20267:00 amRNSInvestment establishes C$50m valuation for Häggån
23rd Dec 202510:09 amRNSCompletion of Director shares & cleansing notice
23rd Dec 202510:09 amRNSCompletion of Director shares & cleansing notice
22nd Dec 202511:39 amRNSAppendix 3B
22nd Dec 202511:39 amRNSAppendix 3B
22nd Dec 202511:29 amRNSAppendix 3Y & 2A, Share Issue & PDMR Notification
22nd Dec 202511:29 amRNSAppendix 3Y & 2A, Share Issue & PDMR Notification
22nd Dec 202510:45 amRNSAppendix 3G & PDMR Notification
22nd Dec 202510:45 amRNSAppendix 3G & PDMR Notification
22nd Dec 202510:10 amRNSAppointment of Company Secretary
22nd Dec 202510:10 amRNSAppointment of Company Secretary
26th Nov 20257:31 amRNS2025 Annual General Meeting Results
26th Nov 20257:27 amRNSAppendix 3B
25th Nov 202512:40 pmRNSResignation of Director & Withdrawal of Resolution
25th Nov 20259:18 amRNSChair address – Annual General Meeting 2025
24th Nov 20257:05 amRNSAura granted new exploration tenement in Sweden
14th Nov 202510:59 amRNSAppendix 3G
6th Nov 20257:00 amRNSSwedish Parliament votes to overturn uranium ban
27th Oct 20258:24 amRNSAppendix 3H and Appendix 3Z
22nd Oct 20257:00 amRNSActivities Report for September Quarter 2025
20th Oct 20257:00 amRNSNotice of Annual General Meeting
20th Oct 20257:00 amRNSResignation of Managing Director
16th Oct 20259:11 amRNSCorporate Governance, Appendix 4G,Annual Report25
7th Oct 202512:59 pmRNS2025 Annual General Meeting
23rd Sep 20257:00 amRNSAppendix 3X
19th Sep 20258:23 amRNSFinancial Report for the year ended 30 June 2025
16th Sep 20257:46 amRNSAppointment of Non-Executive Director
3rd Sep 20259:20 amRNS-RAfrica Down Under Presentation
2nd Sep 202510:08 amRNSExercise of Options
1st Aug 20257:00 amRNSOfftake and Spot Sales Agreements Secured
21st Jul 20257:00 amRNSActivities report for the June quarter 2025
14th Jul 20259:12 amRNSAppendix 3X
10th Jul 20257:00 amRNSAppointment of Ousmane Kane to Aura Energy Board
27th Jun 20257:00 amRNSDFC publishes ESIA for Tiris Uranium Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.