The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAura Egy Regulatory News (AURA)

Share Price Information for Aura Egy (AURA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.25
Bid: 9.00
Ask: 9.50
Change: 0.25 (2.78%)
Spread: 0.50 (5.556%)
Open: 9.00
High: 9.25
Low: 9.00
Prev. Close: 9.00
AURA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant breakthrough on Tiris operating costs

30 Aug 2017 07:00

Aura Energy Limited - Significant breakthrough on Tiris operating costs

Aura Energy Limited - Significant breakthrough on Tiris operating costs

PR Newswire

London, August 29

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

30 August 2017

AURA ENERGY LIMITED(“Aura” or the “Company”)

SIGNIFICANT BREAKTHROUGH ONTIRIS URANIUM PROJECT OPERATING COSTS

ESTIMATED OPERATING COSTS REDUCED BY 35%TO US$19.40/LB U?O?

SIGNIFICANT POSITIVE IMPACT ON TIRIS PROJECT ECONOMICS

Aura Energy Limited (AEE; ASX, AURA; AIM) is pleased to announce that following ongoing metallurgical optimisation and modelling, particularly around the leach reagent recycle and consumption, the operating cost for the Tiris Uranium Project has been reduced by an estimated 35%.

The estimated Tiris operating cost now stands at US$19.40/lb U?O?

Aura is currently completing a Definitive Feasibility Study (DFS) on the Tiris project, which includes additional resource definition work and metallurgical test work. This breakthrough has arisen from additional internal modelling using previous test work data to optimise primary leach reagent usage, the recycle of leach agent in the plant and consumption of the leaching reagent via impurities.

Commenting on the outcome Peter Reeve, Aura Energy's Executive Chairman said “Aura has continued to work at improving the financial outcomes of the Tiris project and this reduction in operating cost will have a significant impact on project cashflow. It will also positively impact the approval threshold required for the project given current uranium prices.

“The technical team is diligent and experienced and this breakthrough is testament to the team’s work. The Tiris project has many natural attributes including shallow mining, beneficiation and a low development capital. Incorporating this new optimised reagent usage in the study to lower the operating cost below US$20 per pound uranium now makes the Tiris Uranium Project one of the most compelling uranium development projects in the world.”

The refinement of the estimate represents the most accurate assessment of the Tiris operating cost since the initial conservative approach in the Scoping Study. Additional test work is required to confirm all aspects of the operating cost; however, Aura has maintained conservative assumptions which may lead to a further adjustment in operating cost with additional test work and optimisation modelling.

The Tiris Uranium project will process very fine grained carnotite mineralisation in a calcrete setting from shallow mining depths of zero to five metres. The carnotite is found within a friable weathered granite composite that, when washed and scrubbed, releases the liberated carnotite in a beneficiation stage. This increases the leach feed grade by between 5 and 7 times (see Figure 1). The beneficiation stage significantly reduces the required plant size from the leach stage to product packaging, leading to a capital cost of US$45 million.

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

Figure 1: Beneficiation schematic process diagram

The leach plant utilises an alkali leach with soda ash (sodium carbonate) as the lixiviant. In the Tiris Scoping Study, Aura maintained a conservative approach for estimating the consumption of soda ash, assuming there would be negligible soda ash recycled in the process plant. Similarly, Aura maintained a conservative approach with respect to the consumption of reagent from the build-up of impurities in the process streams.

Since the commencement of the Tiris DFS Aura has applied a focus on reducing the soda ash requirement in the project, given this is a significant component of the Tiris operating cost. The primary method to reduce this cost was via a reduction in consumption; however, Aura also commenced exploration for local sources of soda ash as another cost mitigation step.

Additional steady state simulation modelling of the process was used to examine the effects of recycle and impurity build up in the Tiris leach circuit, exploring optimisation of reagent requirements and the water balance. This is illustrated in the Tiris process flowsheet (see Figure 2), showing the distribution of recycled liquor. The modelling focused on optimisation of liquor recycle streams through scenario based simulation to minimise losses of recovered soda ash in the beneficiation circuit. This modelling defined that requirements for soda ash could be reduced by 32% when compared with scoping study estimates.

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

Figure 2: Tiris overall process flow diagram

Scenario analysis on the effect of increasing the quantity of reagent consuming minerals in the beneficiation feed also demonstrated that there was minimal impact on leach reagent consumption. This was primarily driven by rejection of these minerals in the beneficiation stage of the processing circuit.

Another collateral benefit of the reagent and process stream optimisation has been a reduction in the process flow volumes to the leach circuit. This flow reduction will lead to a strong reduction in the size of the leach circuit and consequently the capital cost of that section of the plant. The quantity of this reduction will be determined as part of the leach circuit engineering and design currently underway. Importantly the optimisation has also led to a substantial reduction in the process make-up water requirements from the Scoping study estimates.

Over the remaining course of the Tiris DFS, test work will be conducted to further define the geometallurgical domains and better understand variability in the mineralisation. This will allow continued optimisation of process parameters, process equipment, consumables and further scope for review of the operating and capital cost estimates.

During the Tiris DFS Aura has also continued to progress the resource evaluation program to upgrade elements of the Inferred Resource to a higher category. With this optimisation of the operating cost for the Tiris project the current resource cut-off grade of 100 ppm U?O? will be reviewed and adjusted lower. This adjustment will likely increase the amount of material available in the current resource for processing above the break-even price.

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

Figure 3: Location of Tiris project main resources

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

For further information contact:

Aura Energy Limited Peter Reeve (Executive Chairman and CEO)Telephone: +61 (3) 9516 6500 Email: info@auraenergy.com.au
WH Ireland Limited Adrian Hadden James BavisterTelephone: +44 (0) 207 220 1666
Yellow Jersey PR Limited Felicity Winkles Joe BurgessTelephone:  +44 (0) 7748 843 871 +44 (0) 7769 325 254

NOTES TO PROJECT REFERENCES

(1) There is a low level of geological confidence associated with inferred mineral resource and there is no certainty that further exploration work will result in the determination of indicated measured resource or that the production target will be realised.

(2) The Company released to the ASX the Tiris Project Scoping Study on 16 July 2014 and the Company believes that no material change to forecast capital and operating costs and forecast production rates have occurred since the release.

(3) There is a low level of geological confidence associated with inferred mineral resource and there is no certainty that further exploration work will result in the determination of indicated measured resource or that the production target will be realised.

Date   Source Headline
11th Feb 20207:00 amRNSIssue of Shares
3rd Feb 20207:00 amRNSReceipt of Purported s.249D Requisition
31st Jan 20209:06 amRNSResult of General Meeting
31st Jan 20207:24 amRNSDecember Quarterly Report
28th Jan 20207:00 amRNSLind Security Facility and Voting at upcoming GM
16th Jan 20207:00 amRNSUpdate on Claim with Swedish Government
15th Jan 20207:00 amRNSPlacing raises approximately AUD 475,000
9th Jan 202010:31 amRNSAppointment of Director
7th Jan 20207:00 amRNSResult of Meeting
31st Dec 20198:17 amRNSNotice of GM
23rd Dec 20197:00 amRNSIssue of Shares
20th Dec 20197:17 amRNSIssue of Shares
19th Dec 20197:00 amRNSAura seeks delay from ASIC for 6 January 2020 GM
29th Nov 20197:00 amRNSMetallurgical Results for Haggan Vanadium Project
26th Nov 20198:56 amRNSNotice of General Meeting
18th Nov 201910:30 amRNSResult of AGM
18th Nov 20197:05 amRNSIssue of Shares
18th Nov 20197:00 amRNSAura secures Follow-On Convertible Note
13th Nov 20199:06 amRNSCost reduction programme
11th Nov 201911:52 amRNSReceipt of Requisition Notice
8th Nov 20197:00 amRNSAura seeks Haggan compensation
31st Oct 20197:56 amRNSSeptember Quarterly Report
29th Oct 20197:00 amRNSWithdrawal of Requisition Notice
29th Oct 20197:00 amRNSIssue of Shares
25th Oct 20197:00 amRNSUpdate on Requisition Notice
22nd Oct 20197:03 amRNSReceipt of Requisition Notice
17th Oct 20197:00 amRNSGold, base and battery metal tenements update
10th Oct 20199:42 amRNSHaggan Resource Upgrade
1st Oct 20198:41 amRNSSupplementary Prospectus
1st Oct 20198:36 amRNSCorporate Governance Statement
30th Sep 20199:20 amRNSAnnual Report for the Financial Year 30 June 2019
26th Sep 20197:00 amRNSIssue of Shares
25th Sep 20197:26 amRNSTechnical & Finance Update for Tiris Project
24th Sep 20197:00 amRNSChange of Adviser
6th Sep 20197:37 amRNSIssue of Shares
14th Aug 20198:22 amRNSHaggan vanadium drilling results
12th Aug 20197:21 amRNSIssue of Shares
31st Jul 20198:23 amRNSJune 2019 Quarterly Report
29th Jul 20198:04 amRNSTiris Project DFS completed
26th Jul 20197:16 amRNSRelease of Cleansing Notice
18th Jul 20197:00 amRNSIssue of Options
18th Jul 20197:00 amRNSIssue of Options
15th Jul 20198:12 amRNSIssue of Shares
20th Jun 20191:34 pmRNSResult of Meeting and Release of Prospectus
10th Jun 20197:01 amRNSIssue of Shares
10th Jun 20197:00 amRNSFarm-in agreement with Nomads Mining Company
24th May 20197:10 amRNSAppointment of Joint Broker
23rd May 20197:00 amRNSFirst Yellow Cake produced during testwork phase
22nd May 20197:00 amRNSIssue of Shares
21st May 20197:00 amRNSNotice of meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.