We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAura Egy Regulatory News (AURA)

Share Price Information for Aura Egy (AURA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.25
Bid: 9.00
Ask: 9.50
Change: 0.25 (2.78%)
Spread: 0.50 (5.556%)
Open: 9.00
High: 9.25
Low: 9.00
Prev. Close: 9.00
AURA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant breakthrough on Tiris operating costs

30 Aug 2017 07:00

Aura Energy Limited - Significant breakthrough on Tiris operating costs

Aura Energy Limited - Significant breakthrough on Tiris operating costs

PR Newswire

London, August 29

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

30 August 2017

AURA ENERGY LIMITED(“Aura” or the “Company”)

SIGNIFICANT BREAKTHROUGH ONTIRIS URANIUM PROJECT OPERATING COSTS

ESTIMATED OPERATING COSTS REDUCED BY 35%TO US$19.40/LB U?O?

SIGNIFICANT POSITIVE IMPACT ON TIRIS PROJECT ECONOMICS

Aura Energy Limited (AEE; ASX, AURA; AIM) is pleased to announce that following ongoing metallurgical optimisation and modelling, particularly around the leach reagent recycle and consumption, the operating cost for the Tiris Uranium Project has been reduced by an estimated 35%.

The estimated Tiris operating cost now stands at US$19.40/lb U?O?

Aura is currently completing a Definitive Feasibility Study (DFS) on the Tiris project, which includes additional resource definition work and metallurgical test work. This breakthrough has arisen from additional internal modelling using previous test work data to optimise primary leach reagent usage, the recycle of leach agent in the plant and consumption of the leaching reagent via impurities.

Commenting on the outcome Peter Reeve, Aura Energy's Executive Chairman said “Aura has continued to work at improving the financial outcomes of the Tiris project and this reduction in operating cost will have a significant impact on project cashflow. It will also positively impact the approval threshold required for the project given current uranium prices.

“The technical team is diligent and experienced and this breakthrough is testament to the team’s work. The Tiris project has many natural attributes including shallow mining, beneficiation and a low development capital. Incorporating this new optimised reagent usage in the study to lower the operating cost below US$20 per pound uranium now makes the Tiris Uranium Project one of the most compelling uranium development projects in the world.”

The refinement of the estimate represents the most accurate assessment of the Tiris operating cost since the initial conservative approach in the Scoping Study. Additional test work is required to confirm all aspects of the operating cost; however, Aura has maintained conservative assumptions which may lead to a further adjustment in operating cost with additional test work and optimisation modelling.

The Tiris Uranium project will process very fine grained carnotite mineralisation in a calcrete setting from shallow mining depths of zero to five metres. The carnotite is found within a friable weathered granite composite that, when washed and scrubbed, releases the liberated carnotite in a beneficiation stage. This increases the leach feed grade by between 5 and 7 times (see Figure 1). The beneficiation stage significantly reduces the required plant size from the leach stage to product packaging, leading to a capital cost of US$45 million.

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

Figure 1: Beneficiation schematic process diagram

The leach plant utilises an alkali leach with soda ash (sodium carbonate) as the lixiviant. In the Tiris Scoping Study, Aura maintained a conservative approach for estimating the consumption of soda ash, assuming there would be negligible soda ash recycled in the process plant. Similarly, Aura maintained a conservative approach with respect to the consumption of reagent from the build-up of impurities in the process streams.

Since the commencement of the Tiris DFS Aura has applied a focus on reducing the soda ash requirement in the project, given this is a significant component of the Tiris operating cost. The primary method to reduce this cost was via a reduction in consumption; however, Aura also commenced exploration for local sources of soda ash as another cost mitigation step.

Additional steady state simulation modelling of the process was used to examine the effects of recycle and impurity build up in the Tiris leach circuit, exploring optimisation of reagent requirements and the water balance. This is illustrated in the Tiris process flowsheet (see Figure 2), showing the distribution of recycled liquor. The modelling focused on optimisation of liquor recycle streams through scenario based simulation to minimise losses of recovered soda ash in the beneficiation circuit. This modelling defined that requirements for soda ash could be reduced by 32% when compared with scoping study estimates.

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

Figure 2: Tiris overall process flow diagram

Scenario analysis on the effect of increasing the quantity of reagent consuming minerals in the beneficiation feed also demonstrated that there was minimal impact on leach reagent consumption. This was primarily driven by rejection of these minerals in the beneficiation stage of the processing circuit.

Another collateral benefit of the reagent and process stream optimisation has been a reduction in the process flow volumes to the leach circuit. This flow reduction will lead to a strong reduction in the size of the leach circuit and consequently the capital cost of that section of the plant. The quantity of this reduction will be determined as part of the leach circuit engineering and design currently underway. Importantly the optimisation has also led to a substantial reduction in the process make-up water requirements from the Scoping study estimates.

Over the remaining course of the Tiris DFS, test work will be conducted to further define the geometallurgical domains and better understand variability in the mineralisation. This will allow continued optimisation of process parameters, process equipment, consumables and further scope for review of the operating and capital cost estimates.

During the Tiris DFS Aura has also continued to progress the resource evaluation program to upgrade elements of the Inferred Resource to a higher category. With this optimisation of the operating cost for the Tiris project the current resource cut-off grade of 100 ppm U?O? will be reviewed and adjusted lower. This adjustment will likely increase the amount of material available in the current resource for processing above the break-even price.

To view this release as a .pdf complete with referenced images please click the following link:

 http://www.auraenergy.com.au/announcements-2017.html

Figure 3: Location of Tiris project main resources

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

For further information contact:

Aura Energy Limited Peter Reeve (Executive Chairman and CEO)Telephone: +61 (3) 9516 6500 Email: info@auraenergy.com.au
WH Ireland Limited Adrian Hadden James BavisterTelephone: +44 (0) 207 220 1666
Yellow Jersey PR Limited Felicity Winkles Joe BurgessTelephone:  +44 (0) 7748 843 871 +44 (0) 7769 325 254

NOTES TO PROJECT REFERENCES

(1) There is a low level of geological confidence associated with inferred mineral resource and there is no certainty that further exploration work will result in the determination of indicated measured resource or that the production target will be realised.

(2) The Company released to the ASX the Tiris Project Scoping Study on 16 July 2014 and the Company believes that no material change to forecast capital and operating costs and forecast production rates have occurred since the release.

(3) There is a low level of geological confidence associated with inferred mineral resource and there is no certainty that further exploration work will result in the determination of indicated measured resource or that the production target will be realised.

Date   Source Headline
5th Oct 202011:00 amRNSC$4.5m Gold Funding Transaction Update
30th Sep 20209:49 amRNSPreliminary results for year ended 30 June 2020
2nd Sep 20202:06 pmRNSSecond Price Monitoring Extn
2nd Sep 20202:00 pmRNSPrice Monitoring Extension
2nd Sep 202011:03 amRNSL1 Capital Convertible Security
21st Aug 20201:16 pmRNSAura executes Loan Funding
17th Aug 20207:00 amRNSResult of General Meeting
13th Aug 20207:40 amRNSGeneral Meeting to Proceed
10th Aug 20202:00 pmRNSUpdate on gold funding transaction
10th Aug 20207:11 amRNSDocuments filed with Supreme Court of Victoria
31st Jul 202011:57 amRNSJune 2020 Quarterly Report
30th Jul 20204:41 pmRNSSecond Price Monitoring Extn
30th Jul 20204:36 pmRNSPrice Monitoring Extension
30th Jul 20202:05 pmRNSSecond Price Monitoring Extn
30th Jul 20202:00 pmRNSPrice Monitoring Extension
30th Jul 202011:05 amRNSSecond Price Monitoring Extn
30th Jul 202011:00 amRNSPrice Monitoring Extension
30th Jul 20209:06 amRNSSecond Price Monitoring Extn
30th Jul 20209:00 amRNSPrice Monitoring Extension
24th Jul 202012:37 pmRNSUpdate on General Meeting
23rd Jul 20203:49 pmRNSNotice of GM
16th Jul 20208:50 amRNSPeter Reeve interview re:Tasiast Gold Transaction
7th Jul 20208:00 amRNSAura signs C$4.5m gold funding deal term sheet
2nd Jul 20208:17 amRNSDirectorship update
19th Jun 20202:48 pmRNSNotice of intention to remove Directors at a GM
1st Jun 20209:04 amRNSUpdate on Australian Takeover Panel application
21st May 20207:29 amRNSResult of General Meeting
20th May 20209:45 amRNSUpdate on ASX Trading Halt
18th May 20208:16 amRNSIssue of Shares
18th May 20207:23 amRNSTrading Halt
15th May 20207:36 amRNSIssue of Shares
14th May 20207:39 amRNSIssue of Shares
11th May 20207:30 amRNSIssue of Shares
11th May 20207:00 amRNSBoard appointments
30th Apr 20209:31 amRNSMarch 2020 Quarterly Report
28th Apr 20207:00 amRNSIssue of Shares
27th Apr 20207:00 amRNSIssue of Shares
21st Apr 20207:30 amRNSEGM Update
20th Apr 202010:38 amRNSIssue of Shares
8th Apr 20207:00 amRNSIssue of Shares
26th Mar 20207:00 amRNSEGM Postponed
18th Mar 20207:00 amRNSIssue of Shares
17th Mar 20207:00 amRNSNotice of GM
13th Mar 20207:00 amRNSHalf-year Report
9th Mar 20207:00 amRNSIssue of Shares
6th Mar 20207:00 amRNSIssue of Shares
4th Mar 20208:00 amRNSBackground to Board Change requests
24th Feb 20207:00 amRNSRequisition Meeting of Shareholders
18th Feb 20207:00 amRNSIssue of Shares
13th Feb 20209:29 amRNSUpdate on Section 249D Requisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.