Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAura Egy Regulatory News (AURA)

Share Price Information for Aura Egy (AURA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 9.00
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 1.00 (11.765%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 9.00
AURA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Tiris Uranium Project & Tasiast South Gold Project

20 Sep 2021 07:32

RNS Number : 2756M
Aura Energy Limited
20 September 2021

20 September 2021

Tiris Uranium Project & Tasiast South Gold ProjectField Activities Update

HIGHLIGHTS

Update on successful water drilling on the Tiris Uranium Project, with gravity and IP surveys over entire gold tenement holding

First successful drillhole from the 2021 water drilling program has encountered good flows of water commencing from a depth of 35 m, with preliminary assessment, based on airlift tests, indicating a flow rate of 17,000 litres per hour.

The current water drilling program and results follow on from the water drilling program commenced by Aura in 2019.

A contract has also been let for a bedrock drilling program on the Nomads JV tenement (Aura earning up to 70%) at the Tasiast South Gold Project.

Processing and interpretation by consultants PGN is ongoing for the recently completed gravity survey on the Tasiast South gold/battery metals tenements.

Aura Energy (AEE:ASX, AURA:AIM) ("Aura", the "Company") is pleased to announce that it has continued to progress field activities on several fronts for the advancement of the Tiris Uranium Project and the Company's gold projects. This work has involved significant field activities in several locations within Mauritania and has been carried out by multiple large field crews.

Aura Energy Managing Director, Peter Reeve, commented: "We are very pleased with the field activities in Mauritania on a number of fronts. Firstly, the current water drilling program at the Tiris Uranium Project has continued to deliver results consistent with the water drilling undertaken by Aura in 2019[1]. With good water flow rates achieved from the first hole, the Company is very confident in the process it has developed for identifying and targeting the water bearing structures and we aim to continue testing further targets, as Aura further develops the project and advances towards near term production."

"Whilst the initial IP survey on Aura's gold projects responded well in the southern gold tenements the technique was less effective in penetrating the northern Nomads JV tenement. Subsequently, the Company has now mobilised a drilling crew for an augur drilling program in that area. This is an exciting step as this will be the first drilling of any sort conducted on this large tenement located only 35 km and along strike from the giant Tasiast Goldmine. This will test targets and structures identified by the gravity survey and is expected to generate targets for deeper RC and diamond drilling".

Water Drilling Program

The first successful drillhole from the 2021 water drilling program has been completed, with good flows of water encountered commencing from a depth of 35 metres below surface, with preliminary assessment based on airlift tests indicating a flow rate of 17,000 litres per hour.

Conductivity of the water in the hole is 13,000 碌s/cm indicating a salinity of approximately 7,500 tds (total dissolved solids), which is acceptable for operations.

The current water drilling program follows on from a program commenced in 2019, which successfully encountered water with good flow rates in two holes[2]. Encouragingly, the current drillhole is located approximately 250 metres from an earlier hole that yielded similar water flows. Other geophysical targets on the same structure over several kilometres will be tested in this program.

The current program of 4 holes will test targets which have been defined by geological analysis and ground geophysics, with potential for the program to be increased in scope if ground conditions allow favourable drilling. Aura currently has a geophysical crew on site to follow up on successful holes in order to trace the water bearing structures.

This successful hole was drilled following two initial attempts to drill to the target zone, however these holes were discontinued due to drilling difficulties with rock conditions and equipment.

Water samples from each hole will be sent to ALS Laboratories in Ireland for comprehensive water analysis to determine potability and suitability for processing.

As part of the engineering and development phase, Aura will undertake bore field modelling including pumping and recharge rates to ensure stable water supply is maintained in the operating phase. The overall water requirement for the project is 0.5 gigalitres per annum, however, following operations establishment the make-up water required is only 0.2 gigalitres per annum. This is a strong advantage of the Tiris Project's small physical footprint.

The Tiris Uranium Project lies in the Sahara Desert on crystalline Proterozoic rocks where water is confined to shear structures. Results to date are therefore highly encouraging and indicate that Aura's water search approach is effective in this area.

To view Figure 1: Water targets at the Tiris Uranium Project - Background image is airborne magnetics (1vdrtp), please click here:http://www.rns-pdf.londonstockexchange.com/rns/2756M_1-2021-9-20.pdf

IP Survey

Aura recently commenced an Induced Polarisation (IP) survey at the Tasiast South gold and battery metals tenements in Mauritania. Prior to launching into the major survey, test surveys involving dipole-dipole traverses were undertaken in several areas to ascertain the likely effectiveness of the technique. Results from this have indicated that in the northernmost tenement, Nomads JV, electrical depth penetration appeared to be limited due to ground conductivities and IP surveying in this area is not likely to be very effective. On Aura's other two tenements, Bella and Taet, ground electrical properties appear to be more conducive and further IP surveys are in progress in these areas.

To view Figure 2: Location of Induced Polarisation surveys, please click here:http://www.rns-pdf.londonstockexchange.com/rns/2756M_2-2021-9-20.pdf

Bedrock Drilling

Subsequent to the mixed results from the IP surveys, Aura has elected to move to bedrock drilling by power auger over the Nomads JV tenement. A contract for a minimum 6,000 metres of drilling has been let to Sahara Mining Services, specialists in this type of drilling in the region. Drillholes will initially be spaced 100 m apart on lines 1,600 m apart, with closer spaced follow up where encouraging results are obtained and in areas of structural interest. The Company expects that the drilling contractor will mobilise from Mali during the week of the 20th of September 2021. This tenement is located only 35 km south of the giant Tasiast gold mine on the same greenstone belt, however, has never been subject to any meaningful exploration work.

To view Figure 3: Location of proposed bedrock drilling lines, please click here:http://www.rns-pdf.londonstockexchange.com/rns/2756M_3-2021-9-20.pdf

The drilling program is expected to take 4 to 6 weeks with results expected shortly after.

Gravity Survey

As announced on 26 August 2021, a detailed gravity survey over Aura's entire tenement holdings at Tasiast South produced high quality data. To extract maximum value from this, a contract has been let to PGN Geoscience in Melbourne for a new interpretation of geology, structure and zones favourable for gold and battery metals mineralisation merging all existing data.

Images below (figure 4 and 5) show an example of gravity inversion processing of the primary gravity data collected in this survey over a portion of the tenement block. This work is ongoing and Aura's consultants PGN Geoscience & Newexco are collaborating on this to generate a re-interpretation of geology in three dimensions over and beneath the entire tenement areas. This work will be complete around the end of this month.

To view Figure 4: Gravity response (Bouguer anomaly) Tasiast South, please click here:http://www.rns-pdf.londonstockexchange.com/rns/2756M_4-2021-9-20.pdf

To view Figure 5: Example of gravity inversion processing, i.e. density distribution at depth.Figure 5 above is a plan view of the gravity Bouguer Anomaly of the southern end of Taet tenement, please click here:聽http://www.rns-pdf.londonstockexchange.com/rns/2756M_5-2021-9-20.pdf

To view Figure 6: The 3-dimensional inversion of the area in Figure 5. The 3-dimensional bodies are denser material interpreted as mafic volcanics within the Greenstone belts, please click here:聽http://www.rns-pdf.londonstockexchange.com/rns/2756M_6-2021-9-20.pdf

To view Figure 7: Location of Aura tenements in relation to known mineralisation, please click here:http://www.rns-pdf.londonstockexchange.com/rns/2756M_7-2021-9-20.pdf

To view images of Water Drilling at the Tiris Uranium Project, please click here:聽http://www.rns-pdf.londonstockexchange.com/rns/2756M_8-2021-9-20.pdf

Next Steps

Aura will use the results flowing from these activities to plan further and deeper drilling programs on its Tasiast South gold and battery metals tenements.

Aura also has several ongoing programs underway that are moving to completion and the company will update the market as these important exploration and development programs are completed. A summary of these programs is as follows;

1. The Tiris Vanadium Resource Estimate is underway with assaying being conducted now before the estimate is concluded, anticipated to be 4 weeks to completion.

2. Tiris Water Drilling will continue for several weeks with the field team set up in the Sahara Desert for the duration of this program.

3. The Tiris Opportunity Review which is looking to reduce the project cash cost has been completed with promising results. The report is currently being finalised before reporting to the market.

4. The Tiris Net Zero Emission Study is being conducted by Wood PLC in South Africa and is expected by the end of September.

5. The Haggan Vanadium Project metallurgical test work program plan is underway and will be completed by September end.

Aura is also now commencing a review of the steps required to initiate the development of the Tiris Project. The elevated uranium price is driving this review and also the financing options available to the company.

This ASX Release was authorised by the Aura Energy Board of Directors.

For Further Information, please contact:

Peter Reeve

Aura Energy Limited

CEO & Managing Director

PReeve@auraee.com

Jane Morgan

JMM

Investor & Media Relations

jm@janemorganmanagement.com.au

+61 405 555 618

SP Angel Corporate Finance LLP

(Nominated Advisor and Joint Broker)

Ewan Leggat

Caroline Rowe

+44 (0) 203 470 0470

WH Ireland聽Limited

(Joint Broker)

Adrian Hadden

James Sinclair-Ford

+44 (0) 207聽220 1666

Competent Person's Statement

Exploration information in this Announcement is based upon work undertaken by Mr Neil Clifford who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Clifford has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a 'Competent Person' as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code). Mr Clifford is an independent consultant toAura EnergyLimited and consents to the inclusion in this Announcement of the matters based on their information in the form and context in which it appears.

Market Abuse Regulation (MAR) Disclosure

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR') which has been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

About Aura Energy (ASX:AEE, AIM:AURA)

Aura Energy is an Australian based minerals company that has major polymetallic and uranium projects with large resources in Europe and Africa. The company has rapidly grown by acquiring new projects in areas with known polymetallic and uranium occurrences including Sweden and greenfield projects in Mauritania

The Company is now focused on the Tiris Uranium Project, a major greenfields uranium discovery in Mauritania, with 49 Mlb U308 in current resources from 66 million tonnes @ 334聽ppm U308.

Appendix- JORC Code, 2012 Edition Table 1

The following table relates to the gravity survey over the Tasiast South Tenements.

Section1SamplingTechniquesandData

(Criteriainthissectionapplytoallsucceedingsections.)

Criteria

JORC Code explanation

Commentary

Sampling techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report. In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse

circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

This announcement, and table, reports the completion of a gravity survey over the Tasiast South Tenements.

6,643 gravity stations were surveyed. Stations were predominantly spaced 100 m along lines spaced 400 m apart.

The sampling techniques and spacing used are deemed appropriate for the style of exploration by Aura's geophysical advisors.

Drilling techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so, by what method, etc).

No drilling results are presented in this announcement.

Drill sample recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

No drilling results are presented in this announcement.

Logging

Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

The total length and percentage of the relevant intersections logged.

No geological logging was recorded as part of this programme.

Sub- sampling techniques and sample preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

No drilling results are presented in this announcement.

Quality of assay data and laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

No drilling results are presented in this announcement.

A Scintrex CG5 gravimeter was used to record gravity readings.

Industry standard quality control measures were employed including closed survey loops with 2 repeated readings in each loop, a minimum of 3% repeated readings. All readings were within a precision of 0.001 mGal. Standard deviation (SD) of all repeats was within 0.025 mGal and repeat readings for each loop did not exceed 2 SD.

Verification of sampling and assaying

The verification of significant intersections by either independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

Discuss any adjustment to assay data.

No drilling results are presented in this announcement.

Location of data points

Accuracy and quality of surveys used to locate drill holes (collar and down- hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

Station locations were recorded with a GNNS RTK system with an accuracy of 2 cm (X,Y) and 2.5 cm (Z).

The WGS84 UTM zone 28N coordinate system was used for all undertakings.

Data spacing and distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral

Resource and Ore Reserve estimation procedure(s) and classifications applied.

Whether sample compositing has been applied

Stations were predominantly located 100 m along lines spaced 400 m apart.

The spacing and location of data is currently only being considered for exploration purposes.

Orientation of data in relation to geological structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

The gravity survey was oriented approximately perpendicular to lithological trends, as determined from detailed air-magnetic data.

The spacing and location of the data is currently only being considered for exploration purposes.

Sample security

The measures taken to ensure sample security.

No drilling results are presented in this announcement.

Audits or reviews

The results of any audits or reviews of sampling techniques and data.

None completed.

Exploration done by other parties

Acknowledgment and appraisal of exploration by other parties.

Previous explorers included:

- 2011-12: Drake Resources who carried out air-magnetic surveying, air-core and RC drilling.

Geology

Deposit type, geological setting and style of mineralisation.

Mineralisation in the area and targeted by Aura is of the Archean Orogenic gold style & Komatiite hosted nickel-cobalt.

Drill hole Information

A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

No drilling results are presented in this announcement.

The location and context of the gravity survey is provided in gridded images in the main report body.

Data aggregation methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly stated.

No drilling results are presented in this announcement.

Relationship between mineralisation widths and intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').

No drilling results are presented in this announcement.

Diagrams

Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

Refer to figures in announcement.

Balanced reporting

Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

No drilling results are presented in this announcement.

Other substantive exploration data

Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

The areas covered by the gravity survey are unusually lightly explored gold mineralised Archean greenstone belts & Aura is not aware of any relevant evaluation work other than that referred to in this announcement.

Further work

The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

Targets defined by the gravity survey & earlier work will be tested by bedrock drilling, Induced Polarisation surveys, RC & DD drilling


[1] ASX announcement 25 September 2019 "Technical and Finance Update for Tiris project, Additional Water Drilling Yielding Good Results'

[2] ASX announcement 25 September 2019 "Technical and Finance Update for Tiris project, Additional Water Drilling Yielding Good Results'

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
MSCEAKNEAASFEEA
Date   Source Headline
23rd Apr 20247:00 amRNSPublication of Prospectus
17th Apr 20249:12 amRNSIssue of Equity
16th Apr 20247:00 amRNSOfftake Agreement with Curzon Uranium Limited
15th Apr 20249:02 amRNSPlacement and Share Purchase Plan Timing - Update
11th Apr 202411:16 amRNSHolding(s) in Company
10th Apr 20247:00 amRNSTiris Drilling Results
9th Apr 202412:57 pmRNSHolding(s) in Company
9th Apr 20248:37 amRNSIssue of Equity
8th Apr 20249:07 amRNSIssue of Equity
28th Mar 20247:06 amRNSTotal Voting Rights
26th Mar 20247:00 amRNSAppointment of Chief Financial Officer
25th Mar 20249:33 amRNSCompletion of Tranche 1 Placement Shares - Replace
25th Mar 20247:00 amRNSCompletion of Tranche 1 Placement Shares
20th Mar 202410:16 amRNSIssue of Equity
18th Mar 202410:44 amRNSAppendix 3B
18th Mar 20247:22 amRNSA$16 million placement to advance Tiris Project
18th Mar 20247:00 amRNSRelease of Unlisted Options from Escrow
18th Mar 20247:00 amRNSHalf-year Report
15th Mar 20247:00 amRNSASX Trading Halt
12th Mar 20247:29 amRNSExtensive new uranium mineralisation
6th Mar 20247:35 amRNSIssue of Equity
5th Mar 202411:53 amRNSCancellation of Securities
1st Mar 202412:13 pmRNSRe-weighting of ASX Indices
29th Feb 20247:00 amRNSTiris Project FEED Study Webinar
29th Feb 20247:00 amRNSTotal Voting Rights
28th Feb 20247:02 amRNSFEED study confirms excellent economics for Tiris
26th Feb 20247:11 amRNSSwedish Government inquiry to overturn uranium ban
19th Feb 20247:21 amRNSIssue of Equity
5th Feb 20247:00 amRNSAppendix 3X & Appendix 3Z
5th Feb 20247:00 amRNSIssue of Equity
1st Feb 20247:24 amRNSTotal Voting Rights
30th Jan 20248:58 amRNSQuarterly Report for the Period Ending 31 Dec 23
30th Jan 20247:00 amRNSAura appoints New Managing Director
25th Jan 20247:00 amRNSOption funding agreements secure A$4.3m for Tiris
22nd Jan 20248:33 amRNSIssue of Equity
12th Jan 20247:21 amRNSIssue of Equity
9th Jan 20247:48 amRNSCancellation of securities
5th Jan 20247:00 amRNSExtensional drilling program at Tiris
4th Jan 202412:07 pmRNSIssue of Equity
4th Jan 202411:56 amRNSTotal Voting Rights
22nd Dec 202310:00 amRNSIssue of Equity
20th Dec 202311:43 amRNSIssue of Equity
12th Dec 20237:26 amRNSIssue of Equity
1st Dec 20238:48 amRNSResults of Annual General Meeting - Addendum
30th Nov 20237:00 amRNSTotal Voting Rights
29th Nov 20238:50 amRNSResult of AGM
29th Nov 20237:00 amRNSNew Tiris Project Tenements Applications
21st Nov 20237:27 amRNSIssue of Equity
16th Nov 20238:20 amRNSIssue of Equity
10th Nov 20237:25 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.