First Quarter 2020 Operations Update

15 Apr 2020 07:00

RNS Number : 6465J
Atalaya Mining PLC
15 April 2020
 

15 April 2020

Atalaya Mining Plc

("Atalaya" and/or the "Company")

First Quarter 2020 Operations Update

 

Atalaya Mining Plc (AIM: ATYM; TSX: AYM) is pleased to announce its operations update for the first quarter of 2020 ("Q1 2020").

Operating Highlights

Q1

Q4

Full year

2020

2019

2019

2020 Guidance

Ore mined

(M tonnes)

3.0

2.5

2.3

15.0

Waste mined

(M tonnes)

5.1

3.8

6.0

22.7

Ore milled

(M tonnes)

3.4

2.4

2.9

14.0 - 15.0

Cu grade

(%)

0.47

0.46

0.56

0.45

Cu recovery

(%)

82.62

90.27

83.58

84 - 86

Cu production

(tonnes)

13,229

10,219

13,527

55,000 - 58,000

 

· Q1 2020 copper production was 13,229 tonnes, representing a 29% increase over Q1 2019.

· 3.4 million tonnes of ore processed with an average copper head grade of 0.47% and a recovery rate of 82.62%.

o Compared with Q1 2019, throughput increased 40% while recoveries decreased 8%.

o Compared with Q4 2019, copper production was similar as a result of a 17% higher throughput offsetting the lower grade and recoveries.

· Lower than planned plant recoveries were owing to a combination of treating lower grade surface stockpiles as a result of partial flooding of the pit floor during December 2019, several plant stoppages for scheduled maintenance and the COVID-19 shutdown order.

· During February 2020 major scheduled maintenance was undertaken, during which time the plant was not running. These upgrades led to a new production record being achieved in March 2020 with 5,375 tonnes of copper produced from the processing of 1.35 million tonnes of ore with a recovery of 84.6%.

o March 2020 figures confirmed that the 15Mtpa expansion is now successfully working at full design just a few months after the start-up in November 2019.

· Heavy rains in December 2019 meant mining operations concentrated on ore from the higher levels of the pit. The new equipment mobilised to site by the contractor has successfully been adapted to the increased volumes as a result of the plant expansion. On a combined basis, ore, waste and marginal ore amounted to 2.9 million m3 in Q1 2020 versus 3.0 million m3 in Q4 2019.

· On-site concentrate inventories at the end of the quarter were approximately 3,036 tonnes.

· Copper prices decreased, with an average realised price per pound of copper payable, including the QPs closed in the period, of US$2.58/lb compared with US$2.65/lb in Q4 2019. The average copper spot price during the quarter was US$2.56/lb. The realised price during the quarter, excluding QPs, was approximately US$2.54/lb.

· Cash operating costs for Q1 2020 are expected to be higher than the annual cost guidance ranges previously provided of US$1.95-2.05/lb owing to higher processing rates at lower grade and recoveries. Further details on costs will be provided with the Q1 Financial Statements which will be published in May 2020.

· As announced on 30 March 2020, the Royal Decree issued by the Spanish Government resulted in the Company stopping operations at Proyecto Riotinto for four full days until clarification was provided on 3 April 2020 and operations restarted. Proyecto Riotinto continues operating with specific requirements and recommendations to prevent the COVID-19 exposure and the spread of the virus.

· Atalaya's key priority continues to be to protect its workforce and the local communities surrounding both Proyecto Riotinto and Proyecto Touro.

Exploration Highlights

· Exploration at Proyecto Riotinto concentrated on the massive sulphides and stockwork mineralisation under the Atalaya pit as well as potential resource increases at the Cerro Colorado pit.

· In early March 2020, as a result of the sharp copper price decrease, non-essential drilling activities were put on hold

2020 Outlook

· As previously stated, guidance for copper production in 2020 is estimated to be in the range of 55,000 to 58,000 tonnes.

· The COVID-19 pandemic may still further impact how the Company manages its operations and is accordingly keeping its guidance under regular review. Should the Company consider the current guidance no longer achievable, then the Company will provide a further update.

Corporate Update - Proyecto Touro

· On 13 April 2020, the Company was formally notified that the Environment Department of the Xunta de Galicia had issued a negative Impact Declaration (DIA) required to restart the copper production at Proyecto Touro.

· The restart proposal for Proyecto Touro, a former open pit mine, included managing past environmental liabilities and using transfer mining techniques with zero water discharge. Flotation tailings were to be stored in a plastic-lined impoundment built with compacted rock walls using techniques similar to those used in water dam construction.

· The Company, together with its advisers, is assessing its options to progress Proyecto Touro. These may include several types of appeal or modified project proposals to address the concerns of the Xunta de Galicia.

 

Alberto Lavandeira, CEO commented:

 

"During the first quarter of 2020 our operations at the Riotinto mine continued the successful ramp-up of the newly expanded plant to achieve design capacity. While conscious of the potential impact COVID-19 could have to our current operations, we maintain our production guidance and continue to monitor both volatility in the copper price and the Company's cash costs structure.

 

"Early in the quarter the unprecedented COVID-19 crisis was professionally handled by the site teams in coordination with the Regional Authorities. A short production interruption was stipulated by the Spanish government but to date there have been no known cases of COVID-19 amongst employees of the Company or its contractors. We continuously follow the evolution of the situation and regard the safety and health of our employees and the communities in which we operate as the highest priority."

 

This announcement contains information which, prior to its publication constituted inside information for the purposes of Article 7 of Regulation (EU) No 596/2014.

Contacts:

Newgate Communications

Elisabeth Cowell / Adam Lloyd / Tom Carnegie

+ 44 20 3757 6880

4C Communications

Carina Corbett

+44 20 3170 7973

Canaccord Genuity

(NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / James Asensio

+44 20 7523 8000

BMO Capital Markets

(Joint Broker)

Tom Rider / Michael Rechsteiner / Neil Elliot

+44 20 7236 1010

Peel Hunt LLP

(Joint Broker)

Ross Allister / David McKeown

+44 20 7418 8900

 

About Atalaya Mining Plc

Atalaya is an AIM and TSX-listed mining and development group which produces copper concentrates and silver by-product at its wholly owned Proyecto Riotinto site in southwest Spain. In addition, the Group has a phased, earn-in agreement for up to 80% ownership of Proyecto Touro, a brownfield copper project in the northwest of Spain. For further information, visit www.atalayamining.com

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDVZLFFBZLBBBK
Date   Source Headline
26th May 20267:00 amRNSQ1 2026 Financial Results
21st May 20267:00 amRNSNotice of AGM
13th May 20267:00 amRNSNotice of Results
28th Apr 20267:01 amRNSGrant of Conditional Share Awards
28th Apr 20267:00 amRNSPublication of 2025 Annual Reporting Documents
16th Apr 20265:04 pmRNSTR-1
14th Apr 20267:00 amRNSQ1 2026 Operations Update
10th Apr 202611:46 amRNSHolding(s) in Company
2nd Apr 20267:00 amRNSInvestment in Lara Exploration Ltd.
19th Mar 20267:00 amRNS2025 Annual Results
5th Mar 20267:00 amRNSNotice of 2025 Annual Results
9th Feb 20267:00 amRNSTR1 Notification of Major Holdings
4th Feb 20267:00 amRNSResults of placing in Atalaya Mining Copper, S.A.
3rd Feb 20264:45 pmRNSProposed placing - in Atalaya Mining Copper, S.A.
28th Jan 20267:00 amRNSSuccessful Fundraise
27th Jan 20264:39 pmRNSRetail Offer by RetailBook
27th Jan 20264:38 pmRNSProposed Fundraise to Accelerate Copper Project
14th Jan 20267:00 amRNSQ4 Operations Update and 2026 Production Guidance
9th Jan 202612:21 pmRNSHolding(s) in Company
30th Dec 20257:00 amRNSDirectorate Change
30th Dec 20257:00 amRNSDirectorate Change
19th Dec 20257:00 amRNSStatement Regarding Shareholder Consultation
19th Dec 20257:00 amRNSStatement Regarding Shareholder Consultation
10th Dec 20257:00 amRNSHolding(s) in Company
13th Nov 20257:00 amRNSQ3 and YTD 2025 Financial Results
30th Oct 20257:00 amRNSNotice of Q3 and YTD 2025 Financial Results
21st Oct 20257:00 amRNSQ3 2025 Operations Update
3rd Oct 202510:33 amRNSHolding(s) in Company
1st Oct 20259:35 amRNSHolding(s) in Company
30th Sep 20257:01 amRNSDirector/PDMR Shareholding
30th Sep 20257:00 amRNSHolding(s) in Company
18th Sep 20257:00 amRNSPDMR Share Dealings
17th Sep 20257:00 amRNSNotice for Holders of Physical Share Certificates
10th Sep 20257:00 amRNSResult of Secondary Placing
9th Sep 20254:43 pmRNSProposed placing in Atalaya Mining Copper, S.A.
12th Aug 20257:00 amRNSQ2 and H1 2025 Financial Results
23rd Jul 20257:00 amRNSNotice of Q2 and H1 2025 Financial Results
15th Jul 20257:00 amRNSQ2 2025 Operations Update
10th Jul 20257:01 amRNSMasa Valverde Drilling Update
10th Jul 20257:00 amRNSDirector/PDMR Shareholding
24th Jun 202511:59 amRNSBoard Committee Updates
24th Jun 202511:29 amRNSAGM 2025 – Voting Results
20th Jun 20257:00 amRNSAppointment of Director
4th Jun 20253:48 pmRNSDirector Declaration
2nd Jun 20257:00 amRNSFinal Dividend Timetable & Updated AGM Resolution
29th May 20257:00 amRNSQ1 2025 Financial Results
21st May 20257:00 amRNSNotice of Q1 2025 Financial Results
15th May 20257:00 amRNSSan Dionisio Granted Environmental Authorisation
14th May 20257:00 amRNSNotice of Annual General Meeting
2nd May 20257:00 amRNSFTSE 250 Index Inclusion

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.