Operational Update

17 Jan 2018 07:00

RNS Number : 0473C
AfriTin Mining Ltd
17 January 2018
Β 

17 January 2018

AfriTin Mining Limited

("AfriTin" or the "Company")

Operational Update - Procurement of Equipment and Appointment of Engineering Firm

AfriTin Mining Limited (AIM:ATM), a mining company with a portfolio of near production tin assets in Namibia and South Africa, currently focussing on the Uis Tin Mine in Namibia, is pleased to provide an update on its operations. The Company has made good progress towards its objective of commercial production from the Uis mine later in the year.

Highlights

Β· Purchase of crushing equipment;

Β· Site and infrastructure establishment, managed by AfriTin's in-house engineers.

Β· High-resolution satellite imagery purchased for ancillary infrastructure engineering design work.

Procurement of Equipment

The Company, through its Namibian subsidiary, Dawnmin Africa Investments (Pty) Ltd, this week purchased the entire front end crushing component for the processing circuit of the plant, located at the Uis Tin Mine.

The equipment includes a jaw crusher, three cone crushers, stacking and conveying equipment and the electrical switchgear. AfriTin has also appointed Crushplant & Utility Spares CC, a Namibian based engineering firm, specialising in the construction and installation of crushing equipment to match the equipment to the required specifications and associated installation at mine site.

The equipment purchased represents the entire comminution circuit for the Phase 1 processing plant from which the company estimates production of approximately 780 tonnes of tin concentrate per annum.

Civil Engineering design

The Afritin engineering team have begun work on the Infrastructure design for the plant design at Uis. The scope of the teams work includes civil, structural and mechanical designs and drafting. The planning work will be undertaken through the use of high resolution satellite imagery, that has already been purchased, and topographical interpretation is currently being prepared

Β 

Commenting Anthony Viljoen, CEO of AfriTin Mining, said: "I am pleased to be in a position to provide such a significant and positive operational update for the company, at such an early stage in its development. The comminution circuit purchased through Crushplant provides a turnkey package for the front end crushing end of the circuit and, as a result, comprises at least 30% of the required plant procurement.

Β 

The availability of the plant and suitably qualified engineers to prepare the plant for operations is a testament to Namibia being a favoured investment destination for the construction of large projects of this nature. The engineering team have also begun work procuring the ancillary infrastructure for the plant, that will make use of high-resolution satellite imagery to identify, design and begin construction of the plant site. AfriTin looks forward to providing further updates on the progression of the mine development".

Β 

Enquiries: info@afritinmining.com

AfriTin Limited

Anthony Viljoen (CEO)

+27 (11) 268 6555

Nominated AdviserΒ and Broker

WH Ireland Limited

Katy Mitchell

Adrian Hadden

James Sinclair-Ford

Β 

Joint BrokerΒ 

Beaufort Securities Limited

Jon Belliss

Β 

Β 

+44 (0) 207 220 1666

Β 

Β 

Β 

Β 

+44 (0) 207 382 8300

Β 

Financial Public Relations

Tavistock

Jos Simson / Barney Hayward

+44 (0) 207 920 3150

Β 

Notes to editors

AfriTin Mining is the first pure tin company listed in London and its vision is to create a portfolio of world-class, conflict-free, tin producing assets.. The company's flagship asset is the Uis brownfield tin mine in Namibia, formerly the world's largest hard-rock tin mine. AfriTin is managed by a highly experienced board of directors and management team with a current two-fold strategy: fast track Uis brownfield tin mine in Namibia to commercial production in 2018 ramping up to 5,000 tonnes of concentrate, and consolidation of other quality African tin assets. The Company strives to capitalise on the solid supply/demand fundamentals of tin by developing a critical mass of tin resource inventory, achieving production in the near term and further scaling production by consolidating tin assets in Africa.

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
UPDBUGDBIDBBGIL
Date   Source Headline
27th May 20267:00 amRNSUis Financing & Lithium Ridge Drilling Complete
8th May 20269:45 amRNSNotification of Major Holdings
5th May 20267:00 amRNSSecond Batch of Lithium Ridge Drill Results
29th Apr 20268:31 amRNSNotification of Major Holdings
29th Apr 20267:00 amRNSAmendment of Convertible Loan Notes
24th Apr 20262:09 pmRNSNotification of Major Holdings
23rd Apr 20267:08 amRNS-RUpdate: Investor Presentation via IMC
20th Apr 20267:00 amRNSStrategic Equity Placement To Accelerate Growth
13th Apr 20267:00 amRNSPositive Tungsten Test Results At Brandberg West
26th Mar 20267:00 amRNSBusiness Update For Period Ended 28 February 2026
3rd Mar 20264:03 pmRNSEmployee Incentive Scheme Update
24th Feb 20267:00 amRNSThaisarco Strengthens Relationship with Andrada
10th Feb 20262:40 pmRNSEIB Partnership for Uis Mine Feasibility Study
9th Feb 20267:00 amRNSHigh-grade initial drill results at Lithium Ridge
4th Feb 20267:00 amRNSACAM Transaction Update
26th Jan 20267:00 amRNSLithium Ridge Exploration Update
21st Jan 20267:00 amRNSPartnership with ACAM to develop Brandberg West
19th Jan 202611:00 amRNSOrange Trust Loan Conversion to Equity
17th Dec 20257:00 amRNSQ3 Operational Update For Period End 30 Nov 2025
1st Dec 202510:35 amRNSNotification of Major Holdings
27th Nov 20257:00 amRNSInterim Results for Six Months Ended 31 Aug 2025
7th Nov 20257:00 amRNS-RPublication of 2025 Sustainability Report
24th Oct 20255:26 pmRNSNotification of Major Holdings
24th Oct 20255:25 pmRNSNotification of Major Holdings
30th Sep 20252:00 pmRNSResults of the Annual General Meeting
29th Sep 20257:00 amRNSBoard Changes
15th Sep 20257:00 amRNSQ2 Operational Update For Period Ended 31 Aug 2025
3rd Sep 20257:00 amRNSExploration Drilling Commences at Lithium Ridge
29th Aug 20257:00 amRNSAudited Financial Results For Year End 28 Feb 2025
21st Aug 20257:00 amRNSAndrada accelerates growth of its tin production
15th Aug 20257:00 amRNSIssuance of Shares & Total Voting Rights
27th Jun 20257:00 amRNSResults of strategic Subscription & Placing
26th Jun 20257:00 amRNSProposed Strategic Subscription and Placing
19th Jun 20252:00 pmRNSNotification of Major Holdings
17th Jun 20257:00 amRNSAndrada Secures High-Grade Tin Feedstock
6th Jun 20257:00 amRNSOperational Update For Period Ended 31 May 2025
22nd May 202511:28 amRNSChange of Registered Address
10th Apr 20257:00 amRNSUis Exploration Drilling Results
31st Mar 20257:00 amRNSFY Operational Update For Period Ended 28 Feb 2025
11th Mar 202512:59 pmRNSNotification of Major Holdings
7th Mar 202512:41 pmRNSNotification of Major Holdings
4th Mar 20254:51 pmRNSDirector/PDMR Shareholding
28th Feb 20257:00 amRNSSQM earn-in agreement receives NaCC Approval
21st Feb 20252:17 pmRNSEmployee Incentive Scheme Update & Issue of Shares
14th Feb 202512:20 pmRNSNotification of Major Holdings
12th Feb 20257:00 amRNSOrange Trust Funding
6th Feb 20257:00 amRNSMineral Resource Update at Uis
20th Dec 20247:00 amRNSQ3 Operational Update for Period Ended 30 Nov 24
28th Nov 20247:00 amRNSUnaudited Interim Results 6 Months Ended 31/08/24
20th Nov 20247:00 amRNSPublication of 2024 Sustainability Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.