Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAndrada Mining. Regulatory News (ATM)

Share Price Information for Andrada Mining. (ATM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.00
Bid: 4.90
Ask: 5.10
Change: -0.05 (-0.99%)
Spread: 0.20 (4.082%)
Open: 5.05
High: 5.05
Low: 5.00
Prev. Close: 5.05
ATM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Lithium and Tantalum Infill Drill Programme Update

22 Nov 2022 07:00

RNS Number : 1852H
AfriTin Mining Ltd
22 November 2022
 

22 November 2022

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

AfriTin Mining Limited

("AfriTin" or the "Company")

Lithium and Tantalum Infill Drill Programme Update

AfriTin Mining Limited (AIM: ATM), an African technology metals mining company with a portfolio of mining and exploration assets in Namibia, announces further results from the lithium and tantalum drilling programme at the Company's flagship operation, the Uis Mine ("Uis").

The 50-hole drilling programme, comprising 29 diamond and 21 reverse circulation (RC) drill holes, aims to increase the confidence of the existing lithium and tantalum mineral resource estimates over the deposit. A total of 49 drill holes have been completed and are being processed. The results of 20 previous holes were announced on 8 June 2022, 20 July 2022 and 10 October 2022. This announcement reports the assay results of the next 5 drill holes (Figure 1). The results of the outstanding 24 drill holes will be provided once received.

Highlights:

 

· Pegmatite was intersected in all holes at depths and apparent widths predicted by the geological model;

· Significant pegmatite intersections include:

114 m at 0.151% Sn, 75 ppm Ta, and 0.63% Li2O within drill hole V1V2042, from 116 m to 230 m;

108 m at 0.146% Sn, 65 ppm Ta and 0.65% Li2O for hole V1V2046, from 101 m to 209 m;

75 m at 0.183% Sn, 76 ppm Ta, and 0.76% Li2O from 92 m to 167 m; and

23 m at 0.153% Sn, 102 ppm Ta and 0.46% Li2O from 57 m to 80 m for drill hole V1V2056.

· Notable intersections of lithium mineralisation within the pegmatite intersections include:

10 m at 1.35% Li2O for drill hole V1V2042 from 211 m to 221 m; and

38 m at 1.00% Li2O for drill hole V1V2056 from 107 m to 145 m.

Anthony Viljoen (CEO) commented:

"We are pleased to announce these exploration drill results which are once again in line with our high expectations for the V1/V2 pegmatite ore body. The drill holes reported in this announcement are distributed over the entire strike of the pegmatite and are indicative of the consistency of the lithium, tin and tantalum mineralisation. We are particularly encouraged by the lithium grades intersected in drill holes V1V2042 and V1V2056, which further demonstrate the unrealised potential of the Uis orebody. As we near the end of this exploration programme, we look forward to upgrading the mineral resource estimate in support of our by-product development projects for tantalum and lithium."

Exploration Programme

The current exploration programme aims to upgrade the existing resource classification for lithium and tantalum over the areas where tin is currently classified within the measured and indicated categories for the 2019 JORC (2012) compliant mineral resource estimate (MRE) (see announcement dated 16 September 2019). The pegmatite intersections of the reported holes align with the current geological model, confirming its spatial accuracy. The drill holes intersected the pegmatite at shallow depths where the V1 and V2 bodies have bifurcated into individual units, as well as greater depths where the units coalesce to form a single unit. The dip angle of the pegmatites varies from 24 degrees to 48 degrees and the reported drill holes are orientated vertically such that reported intersections represent apparent thickness.

Table1: Exploration results of RC drill holes V1V2031, V1V2042, V1V2046, V1V2056, and V1V2078 indicating the full pegmatite intersection and pegmatite grades. Intersections are indicative of apparent thickness and not true thickness; note that apparent thickness is greater than true thickness.

Hole ID

Dip Angle (Degrees)

Pegmatite

 

From/To (m) Including Waste

Interval (m)

Grade

Sn (%)

Ta (ppm)

Li2O (%)

V1V2031

Vertical

V2

Whole Intersection

162 - 194

32

0.146

83

0.61

V1V2042

Vertical

V1/V2

Whole Intersection

116 - 230

114

0.151

75

0.63

Including

211 - 221

10

0.152

39

1.35

V1V2046

Vertical

V1/V2

Whole Intersection

101 - 209

108

0.146

65

0.65

V1V2056

Vertical

V2

Whole Intersection

57 - 80

23

0.153

102

0.46

V1

Whole Intersection

92 - 167

75

0.183

76

0.76

Including

107 - 145

38

0.186

82

1.00

V1V2078

Vertical

V1

Whole Intersection

37 - 47

10

0.089

181

0.36

 

The drilling method for the holes in Table 1 is reverse circulation (RC). Each drill hole was geologically logged before being sampled at one-meter intervals. Sample analysis was undertaken by UIS Analytical Services, a certified independent laboratory, using a peroxide fusion; ICP-OES analysis was utilised for major and minor elements and ICP-MS was utilised for the trace elements.

Figure 1: Map displaying the localities of the reported holes, the drill holes of the previous (2019) exploration programme and the holes from the current programme previously reported. Line A-A' indicates the area represented by the cross section (Fig.2).

 

 

Figure 2: Section line A-A' displaying a projection of the holes drilled during the current programme for which the results are reported in this release and previous communications for this programme.

Competent Person Statement

The technical data in this announcement has been reviewed by Michael Cronwright (M.Sc., FGSSA, Pr. Sci Nat. (Geological Sciences)). He is a full-time employee of CSA Global, and provides geological consulting services to AfriTin. Mr Cronwright is the Principal Consultant - Battery Metals co-ordinator for CSA Global and has 22 years of industry related exploration as well as mineral project development experience and is a Competent Person for the reporting of these exploration results. He has reviewed both the technical disclosures in this release as well as the quality assurance protocols and results for the assay campaign. Mr Cronwright consents to the release of the information contained in the announcement and is satisfied that the results of the QAQC on the assay results released to date are sufficient to support the planned estimation of mineral resources.

Glossary of abbreviations

ICP-MS

Inductively Coupled Plasma-Mass Spectrometry

ICP-OES

Inductively Coupled Plasma-Optical Emission Spectrometry

Li

Symbol for Lithium

Li → Li2O

Metal to metal-oxide conversion factor of 2.153

Li2O

Lithium oxide

JORC

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves

MRE

Mineral Resource Estimate

PPM

Parts Per Million

QA/QC

Quality Assurance / Quality Control

RC

Reverse Circulation drilling

Sn

Symbol for Tin

Ta

Symbol for Tantalum

V1/V2

Name of the targeted pegmatite unit, V1/V2 denotes where the V1 and V2 pegmatites have merged at depth.

Glossary of Technical Terms

Apparent Thickness

The relationship between apparent width and true thickness is based on the formula by Addie (1968 Economic Geology, vol 63, pp 188-189).

Dip Angle

The angle of inclination measured downward from horizontal.

Geological Model

The interpretation of mineralisation and geology that controls mineralisation. This is usually generated in a three-dimensional computer environment.

Mineral Resources

Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories. An Inferred Mineral Resource has a lower level of confidence than that applied to an Indicated Mineral Resource. An Indicated Mineral Resource has a higher level of confidence than an Inferred Mineral Resource but has a lower level of confidence than a Measured Mineral Resource.

Pegmatite

An igneous rock typically of granitic composition, which is distinguished from other igneous rocks by the extremely coarse and systematically variable size of its crystals, or by an abundance of crystals with skeletal, graphic, or other strongly directional growth habits, or by a prominent spatial zonation of mineral assemblages, including monomineralic zones.

Xenolith

A foreign rock fragment (e.g. schist) within an intrusive body (e.g. pegmatite) that is unrelated to the igneous body.

 

 

 

AfriTin Mining Limited

+27 (11) 268 6555

Anthony Viljoen, CEO

Nominated Adviser 

+44 (0) 207 220 1666

WH Ireland Limited

Katy Mitchell

Corporate Advisor and Joint Broker

H&P Advisory Limited

Andrew Chubb

Jay Ashfield

Nilesh Patel

+44 (0) 20 7907 8500

Stifel Nicolaus Europe Limited

Ashton Clanfield

Callum Stewart

+44 (0) 20 7710 7600

Tavistock Financial PR (United Kingdom)

+44 (0) 207 920 3150

Emily Moss

Catherine Drummond

Adam Baynes

 

 

About AfriTin Mining Limited

Notes to Editors

AfriTin Mining Limited is a London-listed technology metals mining company with a vision to create a portfolio of globally significant, conflict-free, producing and exploration assets. The Company's flagship asset is the Uis Tin Mine in Namibia, formerly the world's largest hard-rock open cast tin mine.

AfriTin is managed by an experienced board of directors and management team with a current strategy to ramp-up production at the Uis Mine in Namibia to more than 10,000 tonnes of tin concentrate and 350,000 tonnes of lithium concentrate in a Phase 2 expansion, having reached Phase 1 commercial production in 2020. The Company strives to capitalise on the solid supply/demand fundamentals of tin and lithium by developing a critical mass of resource inventory, achieving production in the near term and further scaling production by consolidating assets in Africa.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLPPGWPGUPPUQP
Date   Source Headline
27th Mar 20249:38 amRNSOperational update - replacement
27th Mar 20247:00 amRNSOperational update for the period ended 29/02/24
19th Mar 20247:36 amRNSFunding Agreement
12th Mar 20247:00 amRNSProduction and Strategic Process Update
22nd Dec 20237:00 amRNSQ3 Ops Update for the period ended 30 Nov 2023
5th Dec 20237:00 amRNSSpodumene Concentrate Produced from Lithium Ridge
29th Nov 20237:00 amRNSUNAUDITED INTERIM RESULTS 6 MONTHS ENDED 31/08/23
28th Nov 20236:40 pmRNSHolding(s) in Company - Replacement
28th Nov 20235:03 pmRNSHolding(s) in Company
27th Nov 20237:00 amRNSLithium Development Update
16th Nov 20237:00 amRNSUSD 25 million received from OMF
15th Nov 20237:00 amRNSRenewal of off-take agreements
27th Oct 202312:08 pmRNSRelease of the 2023 Sustainability Report
12th Oct 20237:00 amRNSUpdate on Brandberg West
3rd Oct 20232:08 pmRNSExercise of Share Options
29th Sep 20237:00 amRNSExercise of Share Options
18th Sep 20237:00 amRNSFinal Results for Initial ML133 Drill Programme
14th Sep 20237:00 amRNSQ2 Ops Update for the period ended 31 August 2023
6th Sep 20237:00 amRNSInitial Drill Results on ML133 (“Lithium Ridge”)
5th Sep 20237:00 amRNSDevelopment Bank of Namibia financing concluded
29th Aug 20237:00 amRNSExploration Update on ML133 (Lithium Ridge)
24th Aug 20238:30 amRNSAudited Financial Results
15th Aug 20234:46 pmRNSOrion US$25m Funding Package Update - Replacement
15th Aug 20237:00 amRNSOrion US$25 Million Funding Package Update
18th Jul 20237:00 amRNSFunding update and commissioning of pilot plant
6th Jul 20237:00 amRNSDrill programme results for Spodumene Hill Project
26th Jun 20237:00 amRNSOperational update for period ended 31 May 2023
5th Jun 20237:00 amRNSShares to Trade on OTCQB & Update on Financing
22nd May 20237:00 amRNSFirst Bulk Lithium Production and Funding Update
18th May 20237:00 amRNSNotice of Investor Presentations
11th May 20237:05 amRNSIssue of Share Options
11th May 20237:00 amRNSAppointment of Barclays as Strategic Advisor
10th May 20237:00 amRNSAppointment of Directors
30th Mar 20235:26 pmRNSV1V2 final 2022 exploration drilling results
20th Mar 20237:00 amRNSQuarterly FY 2023 production and Company update
20th Feb 20237:00 amRNSDirector/PDMR Shareholding
6th Feb 20237:00 amRNSSignificant Lithium Resource Upgrade
2nd Feb 20237:00 amRNSLithium And Tantalum Infill Drilling Update
1st Feb 20238:33 amRNSHolding(s) in Company
31st Jan 20237:00 amRNSLithium and tantalum infill drill programme update
27th Jan 20237:00 amRNSConfirmation of Change in Website Address
26th Jan 20237:00 amRNSPublication of the Inaugural Sustainability Report
25th Jan 20233:54 pmRNSExercise of warrants and issue of equity
23rd Jan 20237:00 amRNSUis Mine Mineral Resource Expansion
10th Jan 20234:51 pmRNSConfirmation of Name Change
5th Jan 20235:06 pmRNSResult of EGM and Change of Name
22nd Dec 20227:00 amRNSQuarterly Production Update
7th Dec 20227:00 amRNSLithium and Tantalum Product Development Update
6th Dec 20227:00 amRNSNotice of EGM and Proposed Change of Name
5th Dec 20227:00 amRNSLithium and Tantalum Infill Drill Programme Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.