Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAndrada Mining Regulatory News (ATM)

Share Price Information for Andrada Mining (ATM)

Share Price is delayed by 15 minutes
Get Live Data
3.70    -0.10 (-2.63%)
Bid:
3.60
Ask:
3.80
Spread: 0.20 (5.556%)
Market Cap: £81.36m
ATM Live PriceLast checked at - London Stock Exchange

Intraday Andrada Mining Share Chart

Exploration and Development Programme

26 Oct 2021 07:00

RNS Number : 2015Q
AfriTin Mining Ltd
26 October 2021
 

26 October 2021

AfriTin Mining Limited

 ("AfriTin" or the "Company")

Exploration and Development Programme

AfriTin Mining Limited (AIM: ATM), an African tech-metals mining company with its flagship asset, the Uis Tin Mine ("Uis") in Namibia, is pleased to announce that it has commenced exploration programmes designed to expand the size of the current JORC-compliant resource at Uis Mine beyond the current V1 and V2 pegmatites and to evaluate several highly prospective exploration targets.

 

Highlights:

§ Commencement of a drilling programme to potentially increase the current lithium and tantalum inferred resource and confidence level for potentially significant by-product elements;

§ Expansion of the initial confirmatory drilling programme to potentially expand the historical resource and reserve estimates at Uis;

§ Confirmatory sampling and drilling programmes at the historic Brandberg West tin and tungsten mine;

§ High resolution mapping and geochemical characterisation of lithium bearing pegmatites at historic Nai-Nais mine and licence area; and

§ Geological modelling of historical information for the B1 and C1 pegmatites on ML129, close to Uis

 

Link to Figures: https://bit.ly/3jzFWEk

 

Anthony Viljoen CEO commented:

"AfriTin has displayed its ability to bring mineral deposits into production by declaring an ore reserve and bringing the Phase 1 pilot plant into production at the Uis mine site. This ore reserve, however, represents a small portion of the historically drilled area in the mining licence property and we believe that the extended Uis project area can expand the size of the operation as well as the Company's footprint within the region. The exploration programme has been designed to validate the historical reserves and upgrade them to meet modern JORC requirements whilst at the same time it will look to increase the confidence levels of the exciting lithium and tantalum by-product potential. The Company's other licence areas across the region encompass other historical mining areas and the potential for these to deliver sustained long-term value by reopening a global significant tech metals province for AfriTin, remains a high priority."

 

AfriTin is commencing a detailed exploration and development programme for its existing and new licence areas, which currently span 62,949 Ha (Figure 1). The exploration programme has been split into various phases that will be initiated in the coming weeks and run over a period of approximately three years, with a focus on the high priority targets. AfriTin has identified cassiterite mineralisation contained in over 180 pegmatites within 5km of the processing plant at Uis. The programme has been designed to optimise the near-term value of the current mining operations, as well as assess the additional licence areas for the resumption of commercial operations at the various licence areas. The programme has been split into five areas that are prioritized as follows:-

 

Priority 1

This programme has already commenced, with the objective being to expand the confidence level of the existing lithium and tantalum resources within the V1/V2 orebody (Figure 2). The programme is expected to run for a period of 12 months from the completion of mobilisation and is expected to comprise approximately 8,000 metres of drilling. The intention is to improve the classification of the inferred lithium and tantalum resources to indicated and measured JORC-compliant categories, in order to increase confidence in mineral concentration and production estimation modelling, that will eventually lead to their incorporation into an overall mineral reserve estimate.

 

Priority 2

This programme aims to expand the historical resource over the Uis licence through a confirmatory drilling programme over other pegmatite outcrops with existing drill holes. The Company previously validated 141 historical holes by drilling 26 confirmatory drill holes spaced throughout the orebody. More than 600 additional drill holes remain over the Uis mining area. The validation of these remaining historical holes will require approximately 19,000 meters of drilling, to be undertaken over a period of 24 months.

 

Priority 3

The historic Brandberg West Mine provides a compelling opportunity to expand the Company's tin and tungsten exploration and production footprint within the Erongo metallogenic province. The objectives of this programme are to verify and confirm the historical information declared when the previous owners, Gold Fields, mined the deposit, achieving peak production in 1978 when they produced 1,249 tonnes of tin and tungsten concentrate. To achieve these objectives, the Company will initially undertake a mapping and sampling programme to identify mineralisation extensions within and along strike of the historical Brandberg West mine. The results will be combined with existing datasets to delineate a drill programme to evaluate the continuity of mineralisation along strike and at depth. The programme will initially comprise approximately 3,000 metres of drilling and is expected to be finalised within 10 months of commencement. Multiple additional prospective tin and tungsten targets within the license area (EPL 5445) have been identified for investigation while the drill programme is underway.

 

Priority 4

This programme focuses on the further evaluation of the Nai-Nais mining license (ML133) which incorporates the historical Tin Tan Mine that produced tin until the late 1980's. Sampling by AfriTin in 2017 yielded the highest lithium grades (up to 3.9% Li2O) yet assayed in the district (see the Company's Admission Document). This programme aims to identify the areas of greatest mineral potential for tin, tantalum and lithium by undertaking high resolution geological mapping and geochemical characterisation programmes within the license. This programme will require eight months for the field work to be executed and geochemical analysis finalised, with a view to implementation of a drilling programme and ultimately the production of a maiden resource.

 

Priority 5

This programme involves the investigation of historical information on license ML129 which contains the B1 and C1 pegmatites, these have previously been reported to contain significant tantalum grades as well as secondary tin mineralisation (see the Company's Admission Document). An orebody modelling initiative will be undertaken to incorporate historical drill datasets over the B1 and C1 pegmatites - the resulting model will be evaluated for economic potential and inform future work programmes in the license area. Data acquisition, orebody modelling and evaluation is expected to yield results within four months of commencement.

 

The exploration priorities detailed above will provide a deeper understanding of the mineral potential within the licence areas held by AfriTin in Namibia. The advancement of these programmes will contribute to expanding the Company's metal inventory, diversifying production and consolidating its tech metal exposure.

  

 

AfriTin Mining Limited

+27 (11) 268 6555

Anthony Viljoen, CEO

Nominated Adviser 

+44 (0) 207 220 1666

WH Ireland Limited

Katy Mitchell

 

Corporate Advisor and Joint Broker

H&P Advisory Limited

Andrew Chubb

Jay Ashfield

Nilesh Patel

+44 (0) 20 7907 8500

Turner Pope Investments

Andy Thacker

James Pope

 

+44 (0) 20 3657 0050

Tavistock Financial PR (United Kingdom)

+44 (0) 207 920 3150

Jos Simson

Nick Elwes

 

About AfriTin Mining Limited

Notes to Editors

AfriTin Mining Limited is the first pure tin company listed in London and its vision is to create a portfolio of globally significant, conflict-free, tin-producing assets. The Company's flagship asset is the Uis Tin Mine in Namibia, formerly the world's largest hard-rock open cast tin mine.

AfriTin is managed by an experienced board of directors and management team with a current strategy to ramp-up production at the Uis Tin Mine in Namibia to 10,000 tonnes of concentrate in a Phase 2 expansion, having reached Phase 1 commercial production in 2020. The Company strives to capitalise on the solid supply/demand fundamentals of tin by developing a critical mass of tin resource inventory, achieving production in the near term and further scaling production by consolidating tin assets in Africa.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCKELFLFBLEFBV
Date   Source Headline
27th May 20267:00 amRNSUis Financing & Lithium Ridge Drilling Complete
8th May 20269:45 amRNSNotification of Major Holdings
5th May 20267:00 amRNSSecond Batch of Lithium Ridge Drill Results
29th Apr 20268:31 amRNSNotification of Major Holdings
29th Apr 20267:00 amRNSAmendment of Convertible Loan Notes
24th Apr 20262:09 pmRNSNotification of Major Holdings
23rd Apr 20267:08 amRNS-RUpdate: Investor Presentation via IMC
20th Apr 20267:00 amRNSStrategic Equity Placement To Accelerate Growth
13th Apr 20267:00 amRNSPositive Tungsten Test Results At Brandberg West
26th Mar 20267:00 amRNSBusiness Update For Period Ended 28 February 2026
3rd Mar 20264:03 pmRNSEmployee Incentive Scheme Update
24th Feb 20267:00 amRNSThaisarco Strengthens Relationship with Andrada
10th Feb 20262:40 pmRNSEIB Partnership for Uis Mine Feasibility Study
9th Feb 20267:00 amRNSHigh-grade initial drill results at Lithium Ridge
4th Feb 20267:00 amRNSACAM Transaction Update
26th Jan 20267:00 amRNSLithium Ridge Exploration Update
21st Jan 20267:00 amRNSPartnership with ACAM to develop Brandberg West
19th Jan 202611:00 amRNSOrange Trust Loan Conversion to Equity
17th Dec 20257:00 amRNSQ3 Operational Update For Period End 30 Nov 2025
1st Dec 202510:35 amRNSNotification of Major Holdings
27th Nov 20257:00 amRNSInterim Results for Six Months Ended 31 Aug 2025
7th Nov 20257:00 amRNS-RPublication of 2025 Sustainability Report
24th Oct 20255:26 pmRNSNotification of Major Holdings
24th Oct 20255:25 pmRNSNotification of Major Holdings
30th Sep 20252:00 pmRNSResults of the Annual General Meeting
29th Sep 20257:00 amRNSBoard Changes
15th Sep 20257:00 amRNSQ2 Operational Update For Period Ended 31 Aug 2025
3rd Sep 20257:00 amRNSExploration Drilling Commences at Lithium Ridge
29th Aug 20257:00 amRNSAudited Financial Results For Year End 28 Feb 2025
21st Aug 20257:00 amRNSAndrada accelerates growth of its tin production
15th Aug 20257:00 amRNSIssuance of Shares & Total Voting Rights
27th Jun 20257:00 amRNSResults of strategic Subscription & Placing
26th Jun 20257:00 amRNSProposed Strategic Subscription and Placing
19th Jun 20252:00 pmRNSNotification of Major Holdings
17th Jun 20257:00 amRNSAndrada Secures High-Grade Tin Feedstock
6th Jun 20257:00 amRNSOperational Update For Period Ended 31 May 2025
22nd May 202511:28 amRNSChange of Registered Address
10th Apr 20257:00 amRNSUis Exploration Drilling Results
31st Mar 20257:00 amRNSFY Operational Update For Period Ended 28 Feb 2025
11th Mar 202512:59 pmRNSNotification of Major Holdings
7th Mar 202512:41 pmRNSNotification of Major Holdings
4th Mar 20254:51 pmRNSDirector/PDMR Shareholding
28th Feb 20257:00 amRNSSQM earn-in agreement receives NaCC Approval
21st Feb 20252:17 pmRNSEmployee Incentive Scheme Update & Issue of Shares
14th Feb 202512:20 pmRNSNotification of Major Holdings
12th Feb 20257:00 amRNSOrange Trust Funding
6th Feb 20257:00 amRNSMineral Resource Update at Uis
20th Dec 20247:00 amRNSQ3 Operational Update for Period Ended 30 Nov 24
28th Nov 20247:00 amRNSUnaudited Interim Results 6 Months Ended 31/08/24
20th Nov 20247:00 amRNSPublication of 2024 Sustainability Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.