The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.275
Low: 1.25
Prev. Close: 1.25
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MoU signed with BGRIMM Technology Group

6 Jan 2023 07:00

RNS Number : 8693L
Asiamet Resources Limited
06 January 2023
 

6 January 2023

 

Asiamet Resources Limited

("Asiamet" or the "Company")

 

Memorandum of Understanding signed with BGRIMM Technology Group

 

Asiamet Resources Limited ("Asiamet" or "the Company") is pleased to announce the signing of a Memorandum of Understanding ("MoU") with BGRIMM Technology Group ("BGRIMM") in relation to the Engineering and Procurement of the Solvent Extraction and Electrowinning ("SX-EW") plant for the BKM Copper project processing facility. BGRIMM are a leading Chinese Engineering, Procurement and Construction group providing services to the mining industry worldwide.

The details of the executed MoU are as follows:

1. BGRIMM will work with the Company and its consulting engineer NewPro Consulting & Engineering Services Pty Ltd ("NewPro") to provide detailed design information for all equipment packages that BGRIMM have provided cost estimates for as part of the current BKM Copper Project Feasibility Study Update ("FS Update").

 

2. BGRIMM will complete a detailed cost estimate for an Engineering, Procurement and Construction Technical Supervision scope of work for the BKM Copper Project SX-EW processing plant for the BKM Copper Project, this will be used in the FS Update capital cost estimate.

 

3. Upon successful completion of the BKM Copper Project FS Update and a positive Final Investment Decision ("FID") by the Asiamet Board, the Company will engage with BGRIMM on the provision of a complete Engineering and Procurement ("EP") service contract for the BKM Copper Project SX-EW plant. This will include the supply of all necessary equipment for the SX-EW plant and coordination with suppliers of materials from within Indonesia.

 

4. The Company will work with BGRIMM to develop the technical construction supervision requirements for the SX-EW plant when moving into the execution phase as well as commissioning services as required.

The SX-EW plant is a critical component of the BKM processing facility as it delivers the processes of metal purification and copper metal production. It can be considered a discrete facility with well-defined battery limits therefore is suitable for delivering as an engineering and procurement package.

The BGRIMM Group has over six decades of experience, specialising in technology and innovation in the mining sector. BGRIMM's core strength and competitive advantage is in engineering design, procurement and equipment manufacturing. Their input into this project is an important part of the overall design and will positively impact costs through their purchasing power. BGRIMM have provided engineering design and procurement for several SX-EW facilities in various countries and are familiar with engineering design requirements of Indonesia given their association with several past and current projects in the country.

Darryn McClelland, Chief Executive Officer commented:

"I am pleased to be able to announce this collaboration with BGRIMM on the SX-EW component of the BKM Copper processing facility. BGRIMM have already assisted our engineering consultants NewPro with various equipment pricing used in the FS Update Capex estimate as well as costs for executing the Engineering and Procurement services necessary for delivery of the SX-EW plant.

Capital cost is a critical component of the feasibility of the BKM Copper project and working with BGRIMM is one of a number of opportunities we have taken to help control cost and mitigate the inflationary backdrop seen in 2022. BGRIMM have a strong track record of delivering cost effective engineering and designs for SX-EW plants of the size we are proposing for the BKM Copper Project and we are very keen to tap into this experience. Asiamet looks forward to developing a strong working relationship with BGRIMM through involvement in the development of the BKM Copper project, along with future development opportunities that are likely to arise from the broader KSK Contract of Work.

Final discrete elements for the delivery of the updated Feasibility Study are nearing completion and we look forward to delivering on this in the near term and critically presenting a project with overall robust economics and attractive cashflow generation."

 

ON BEHALF OF THE BOARD OF DIRECTORS

Darryn McClelland, Chief Executive Officer

For further information, please contact:-Ends-

Darryn McClelland Chief Executive Officer, Asiamet Resources LimitedEmail: darryn.mcclelland@asiametresources.com

 

Tony Manini Executive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com

Asiamet Resources Nominated Adviser RFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com

 

Optiva Securities Limited Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

Follow us on twitter @AsiametTweets

 

FORWARD-LOOKING STATEMENT

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFFFILLVIEIIV
Date   Source Headline
18th Oct 201811:45 amRNSPlans Additional Drilling to Enhance BKM BFS
25th Sep 201811:00 amRNSInterim Results
29th Aug 20187:00 amRNSDrilling Expands Beutong West Copper Deposit
21st Aug 201810:00 amRNSAppointment of Berenberg as Joint Corporate Broker
10th Aug 201810:00 amRNSBankable Feasibility Study Update
7th Aug 20187:15 amRNSDrilling Extends Beutong Copper Mineralisation
19th Jul 20184:30 pmRNSExercise of Options
12th Jul 20188:03 amRNSAppointment of Executive VP - External Relations
2nd Jul 20186:00 pmRNSExercise of Options and Warrants - Replacement
2nd Jul 201812:40 pmRNSExercise of Options and Warrants
26th Jun 20187:00 amRNSAppointment of Director
25th Jun 201810:30 amRNSResult of AGM
25th Jun 20187:00 amRNSLifts Beutong Copper-Gold Project Interest to 80%
22nd Jun 201810:57 amRNSAttendance at Mining Journal Select Conference
14th Jun 201810:21 amRNSIntersects 456m of Cu mineralisation at Beutong
6th Jun 201812:00 pmRNSExercise of Options
1st Jun 201811:45 amRNSDirector Appointment
25th May 20185:00 pmRNSNotice of Annual General Meeting
24th May 20188:00 amRNSDirector Changes
16th May 20187:00 amRNSInitial Mineral Resource Estimate for BKZ Deposit
2nd May 20182:30 pmRNSExercise of Options
27th Apr 20189:00 amRNS2017 Annual Report & Financial Statements
18th Apr 20183:30 pmRNSBroker Warrants Exercised
16th Apr 20183:10 pmRNSAsiamet April Investor Events - Birmingham, London
16th Apr 201811:15 amRNSIntersects High Grade Mineralisation at Beutong
3rd Apr 201811:19 amRNSReports BKM Geotech Results - Replacement
3rd Apr 20187:30 amRNSReports Assay Results for BKM Geotech Holes
29th Mar 20185:00 pmRNSExercise of Options
28th Mar 201810:25 amRNSBKZ Delivers Outstanding Mineralisation
26th Mar 20189:35 amRNSSecures long term tenure for BKM Copper Project
19th Mar 201812:49 pmRNSBKZ Drilling Intersects High Grade Mineralisation
13th Mar 20186:15 pmRNSSuccessful Placing of £7.2 Million
13th Mar 201812:15 pmRNSPlacing to Raise up to £7.2 Million
9th Mar 201810:30 amRNSExercise of Options
1st Mar 201812:00 pmRNSCorporate Broker Appointment
1st Mar 20187:30 amRNSCommences Drilling Beutong Copper-Gold Deposit
28th Feb 20187:20 amRNSmetallurgical tests confirm positive results
22nd Feb 20181:35 pmRNSIntersects Further High-Grade Zinc, Lead, Copper
13th Feb 20181:00 pmRNSExercise of Options
6th Feb 20187:00 amRNSIntersects High Grade Copper Mineralisation at BKZ
31st Jan 20187:00 amRNSBKZ Delineation Drilling and Plans for Beutong
17th Jan 201811:45 amRNSDirector Resignation
11th Jan 201811:15 amRNSGrant of Options
11th Jan 20189:15 amRNSCommences Resource Drilling at BKZ
8th Jan 20187:00 amRNSProduction Licence for Beutong Project
19th Dec 201710:15 amRNSPositive Metallurgical Test-work Results
29th Nov 20177:00 amRNSIntersects 115.5m at 1% Cu at BK44 Zone
24th Nov 201712:15 pmRNSAppointment of James Deo as CFO
21st Nov 201712:15 pmRNSFurther High-Grade Zn-Pb-Ag at BKZ Deposit
13th Nov 20178:40 amEQSAsiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.