If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Resources Limited Regulatory News (ARS)

Share Price Information for Asiamet Resources Limited (ARS)

Share Price is delayed by 15 minutes
Get Live Data
1.575    -0.01 (-0.63%)
Bid:
1.55
Ask:
1.60
Spread: 0.05 (3.226%)
Market Cap: £53.11m
ARS Live PriceLast checked at - London Stock Exchange

Intraday Asiamet Resources Limited Share Chart

Limestone Resource Drilling at BKM Copper Project

15 Aug 2025 07:00

RNS Number : 4265V
Asiamet Resources Limited
15 August 2025
 

15 August 2025

Asiamet Resources Limited

("Asiamet" or the "Company")

 

Limestone Resource Drilling Commences at BKM Copper Project

 

Asiamet Resources Limited (AIM: ARS) is pleased to announce the commencement of limestone resource drilling at the Rinjen prospect, approximately 12km north of Asiamet's flagship BKM Copper heap leach project in Central Kalimantan, Indonesia.

 

Securing a local limestone source for use in BKM's process plant neutralisation circuit is a key enabler of the project's low operating cost base, eliminating the need to import lime from elsewhere in Indonesia at significantly higher cost.

 

The limestone resource drilling programme is being executed by the Kalimantan Surya Kencana ("KSK") operations team, which has previously completed significant drill campaigns in the area. The first phase comprises approximately 600-700 metres of drilling in one location. A second location is currently being assessed as part of a planned second phase aimed at defining additional limestone resource. 

 

Figures: Limestone drill core and exploration rig established

 

Darryn McClelland, CEO of Asiamet, commented:

 

"It is pleasing to recommence on-ground activity in support of the BKM project with the limestone resource definition programme a key step in delivering a low-cost operation. Our KSK operational team has done an excellent job establishing the improved access road, temporary support facilities, access paths and drill pads to support the drilling programme.

 

The first drill hole testing for undercover extensions to a substantial limestone outcrop is now complete having intersected good thicknesses of limestone as predicted.

 

Given the very significant operating cost benefit of sourcing limestone locally within the Company's KSK Contract of Work, verifying the extensive surface assessment work completed over the last 12 months is particularly satisfying.

 

Executing this programme and the appointment of the BKM Project Director represent important milestones as we advance financing of the BKM Project. I look forward to providing further updates as the momentum to deliver BKM continues to build."

 

 

**ENDS**

 

ON BEHALF OF THE BOARD OF DIRECTORS

Darryn McClelland, Chief Executive Officer

 

For further information, please contact:

Darryn McClelland Chief Executive Officer, Asiamet Resources LimitedEmail: darryn.mcclelland@asiametresources.com

 

Tony Manini Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 7891 677 441

Email: sasha.sethi@asiametresources.com

Nominated Adviser Strand Hanson Limited

James Spinney / James Dance / Rob Patrick

Telephone: +44 20 7409 3494

Email: asiamet@strandhanson.co.uk

  

Broker

Shore Capital Toby Gibbs / George Payne

Telephone: +44 20 7408 4050

 

Follow us on twitter @AsiametTweets

 

FORWARD-LOOKING STATEMENT

This announcement contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAXPLFENSEFA
Date   Source Headline
28th Dec 20237:00 amRNSEnd of Year Project Status Update
20th Dec 20232:30 pmRNSShare Purchase by CEO
15th Nov 20237:00 amRNSStrategic c.US$4.0 million Financing
30th Oct 20237:05 amRNSBoard Changes
30th Oct 20237:05 amRNSCorporate Update
6th Oct 20237:00 amRNSCorporate Update
27th Sep 20238:15 amRNS2023 Interim Report & Financial Statements
22nd Sep 20237:00 amRNSBoard Changes
1st Sep 20237:00 amRNSChange of Nominated Adviser
11th Aug 20231:46 pmRNSCorrection - Director Fees and Employee Payments
8th Aug 20238:10 amRNSCorporate Update – Project Financing
13th Jul 20233:00 pmRNSDirectors Fees and Employee Incentive Payments
27th Jun 20237:45 amRNSNotification of Major Shareholding
23rd Jun 20237:10 amRNSExecutive Chairman IGTV Interview
13th Jun 20233:55 pmRNSResult of AGM
12th Jun 20237:15 amRNSCorporate Update - Advisors Appointed
19th May 20238:25 amRNSShare Purchase by CEO
12th May 20235:00 pmRNSNotice of Annual General Meeting
10th May 202310:30 amRNSUpdated BKM Ore Reserve
10th May 202310:30 amRNSUpdated BKM FS Delivers Excellent Economics
27th Apr 20233:58 pmRNS2022 Annual Report & Financial Statements
6th Apr 202311:30 amRNSCEO Podcast – Feasibility Study progress
29th Mar 202311:06 amRNS121 Conference Hong Kong Investor Presentation
20th Mar 20237:00 amRNSBKM Copper Project Update - Capital Cost Estimate
10th Feb 20237:00 amRNSBKM Copper Project FS Activities Update
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 20237:00 amRNSMoU signed with BGRIMM Technology Group
30th Dec 20227:00 amRNSBusiness Update & 2022 Overview
9th Dec 202212:45 pmRNSShare Purchase by CEO
30th Nov 20222:15 pmRNSShare Purchase by CEO
25th Nov 20223:16 pmEQSAsiamet Resources CEO talks latest work on updated feasibility study for BKM copper project
18th Nov 202210:00 amRNSMines and Money Conference and Investor Evening
18th Nov 20227:00 amRNS2022 FS Update Life of Mine Production Physicals
15th Nov 20221:40 pmRNSHolding(s) in Company
14th Nov 20227:00 amRNSPositive Results for Key Inputs to 2022 FS Update
7th Nov 20229:30 amRNSPT Delta Dunia Makmur Increases Strategic Stake
20th Oct 20227:00 amRNSBKM Copper Project Power Solution Progressing
26th Sep 20229:39 amRNSCEO Video Presentation
24th Aug 202211:11 amRNSCEO Video Presentation – Feasibility Study Update
17th Aug 202210:45 amRNSInterim Report & Financial Statements
25th Jul 20222:15 pmRNS2021 Directors Fees
13th Jul 20226:00 pmRNSResult of AGM
6th Jul 20227:00 amRNSAnnual General Meeting – Update
29th Jun 20227:00 amRNSDOID Diligence for BKM Copper Project Complete
31st May 20223:30 pmRNSNotice of Annual General Meeting
31st May 20223:00 pmRNSBKZ Resource Update Presentation and Recording
25th May 20229:45 amRNSBKZ Resource Grows
4th May 202211:00 amRNS2021 Annual Report & Financial Statements
18th Mar 20228:50 amRNSAppointment of Darryn McClelland as CEO

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.